CHRONOLOGY OF GUIDED MISSILE R & D AND PRODUCTION CENTER REUTOVO 67 MOSKVA, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP02T06408R000600010019-4
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 18, 2003
Sequence Number: 
19
Case Number: 
Publication Date: 
June 1, 1967
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP02T06408R000600010019-4.pdf568.94 KB
Body: 
TOP SECRET Approved For Release 2003/06/24: CIA-RDP02T06408R PHOTOGRAPHIC INTERPRETATION REPORT CHRONOLOGY OF GUIDED MISSILE R & D AND PRODUCTION CENTER REUTOVO 67 MOSKVA, USSR JUNE 1967 COPY 116 3 PAGES GROUP I EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Approved For ReilfrpssteM3/06/24 : CIA-RDP02T06408R000600010019-4 25X1 Approved For Release 2003/06/24: CIA-RDP02T06408R000600010019-4 Approved For Release 2003/06/24: CIA-RDP02T06408R000600010019-4 25X1 Approved For ReleMPOOSEGRETA -RDP02TO 6408R000600010019-4 CHRONOLOGY OF GUIDED MISSILE R & D AND PRODUCTION CENTER REUTOVO 67, MOSKVA, USSR INTRODUCTION Guided Missile R & D and Production Center Reutovo 25X1 67 is located at 55-45-43N 37-52-36E, in the suburb of Reutovo on the east edge of Moskva, USSR (Figure 1). A rail line passes along the east side of the installation but does not appear to enter it. The installation (Figures 2 and 3) can be divided into 2 sections -- a production section containing a large final assembly building, a probable subassembly/assembly build- ing, horizontal and vertical storage tanks, and probable machine shops and an engineering section containing sev- eral multistory engineering buildings, a long cylindrical structure which is either an engine test cell or a wind tunnel, a high-bay possible assembly building, and machine shops. 25X1 The installation has been covered byl Dhotog? raphy of only fair interpretability. A building-by-building construction history of the facil- ity is presented graphically in Figure 3 and in tabular form in Table 1, which also provides chronological details and inter- pretations of the basic functions of all structures; all item numbers are keyed to Figure 3 and Table 1. HIGHLIGHTS OF THE DEVELOPMENT OF GUIDED MISSILE R & D AND PRODUCTION CENTER REUTOVO 67 1944 Photography of the area revealed only undeveloped land. The installation has been constructed since 1944. 1962 The first usable post-construction coverage of the in- 25X1 stallation was obtained in and was of fair inter- pretability. At this time the engineering section appeared complete; only a high-bay possible assembly building (item 14) and 4 other small buildings have been subsequently added. The production section was in a very early stage of construction. Two buildings (items 11 and 12) appeared complete, and only preliminary excavations were observed for the major buildings. 1963-1964 In the engineering section the possible assembly building (item 14) had been added. In the production section, 2 major buildings (items 1 and 7) and 2 smaller ones had been completed, construction was continuing on the re- maining structures, and 1 group of horizontal tanks had been added along the west edge of the section. 1965-1966 In the production section a probable subassembly/ assembly building (item 10) with a high-bay section and 2 smaller buildings (items 3 and 8) had been completed, and a second group of horizontal storage tanks and a group of vertical tanks had been added on the west side of the section. In the engineering section only 4 small buildings had been added. Railroad, double track Railroad, single track Road FIGURE 1. LOCATION MAP. - 1 - TOP SECRET Approved For Release 2003/06/24: CIA-RDP02T06408R000600010019-4 FIGURE 2. GUIDED MISSILE R & D AND PRODUCTION CENTER REUTOVO 67, MOSKVA, USSR, 2?x1 25X1 25X1 25X1 25X1 DP02T06408 Color-coded to show periods of significant construction CONSTRUCTION ACTIVITY 250 500 FEET (APPROXIMATE) Item numbers are keyed to Table 7 HORIZONTAL TANKS PRODUCTION SECTION VERTICAL TANKS COOLING TOWERS HIG-H-BAY SECTION ENGINEERING SECTION .-TO MOSKVA FIGURE 3. LAYOUT OF GUIDED MISSILE R & D AND PRODUCTION CENTER REUTOVO 67. TEST CELL OR WIND TUNNEL Approved For Release 2003/06/24: CIA-REPP02+06408R000600010019-4 TOP SECRET 3PE1 Table 1. Data on Facilities of Guided Missile R&D and Production Center Reutovo 67 (Item numbers are keyed to Figure 3) Item No Function Dimensions (ft) Length Width Roof Cover (sq ft) Date First Observed* Date Apparently Complete** Comments 25X1 PRODUCTION SECTION 1 Final assembly bldg 720 x 530 381,600 Preliminary excavation roof cover includes 176,400 sq ft of high-bay section 25X1 (130 ft high) 2 Possible machine shop 360 100 36,000 3 Unidentified bldg 110 100 11,000 4 & 5 Horizontal storage tanks Estimated volume of 1 tank 2,830 cu ft; approx no of tanks 30 (2 groups of 15) 25X1 6 Vertical storage tanks Estimated volume of 1 tank no of tanks undetermined 25X1 (approx) (approx diam) 7 Prob subassembly bldg/machine shop Irregular 196,300 Preliminary excavation highest section 55 ft high 25X1 8 Probable machine shop 325 130 42,250 9 Administration bldg 210 80 16,800 10 Probable subassembly/assembly bldg 400 340 136,000 Preliminary excavation small high-bay section in SE corner 11 Probable machine shop 360 240 86,400 12 Probable machine shop 360 120 43,200 Stibtotal 949,550 ENGINEERING SECTION 13 Unidentified bldg Irregular 14,000 L shaped; 2-level roof; higher section 100 ft high 14 Possible assembly bldg 280 240 67,200 Has high center section 15 Engineering bldg 710 60 42,600 16 Engineering bldg 710 130 92,300 Connected with bldg 15 by covered passage 17 Test bldg 170 80 13,600 Either a wind tunnel or an engine test cell 18 Engineering bldg 400 60 24,000 19 Engineering bldgs 17,500 2 connected bldgs; may be connected with bldg 18 20 Engineering bldg 730 60 43,800 21 Unidentified bldg 290 80 23,200 22 Machine shop 230 80 18,400 23 Assembly bldg/machine shop 480 280 134,400 21 Administration bldg 180 80 14,400 25 Support shop 180 90 16,200 26 Support shop 190 110 20,900 27 Storage bldg Irregular' 25,000 28 Unidentified bldg Irregular 32,000 Subtotal 599,500 Total 1,549,050 *The date first observed is the first date when the item was recognizable as a structure. **The date complete is the first date when the structure outwardly appeared complete; this date may not be related to the date when the structure was operational. -2 Approved For ReleaIGIR3/SZE2C REIR R000600010019-4 ? 25X1 25X1 )00600010019-4 Approved For Releafop3SMR:ET-R REFERENCES 1)P02T0640 8R000600010019-4 MAPS OR CHARTS USATC series, scale 1:200,000 REQUIREMENT C-DI5-82,973 NPIC PROJECT 11212/66 (partial answer) - 3 - TOP SECRET Approved For Release 2003/06/24: CIA-RD 02T06408R Approved For Release 10R/2SECIZEOTT06408R000600010019-4 Approved For Release ICQP6/24 gc ,RUT06408R000600010019-4