CHRONOLOGY OF GUIDED MISSILE R & D AND PRODUCTION CENTER REUTOVO 67 MOSKVA, USSR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP02T06408R000600010019-4
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
6
Document Creation Date:
December 28, 2016
Document Release Date:
June 18, 2003
Sequence Number:
19
Case Number:
Publication Date:
June 1, 1967
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 568.94 KB |
Body:
TOP SECRET
Approved For Release 2003/06/24: CIA-RDP02T06408R
PHOTOGRAPHIC INTERPRETATION REPORT
CHRONOLOGY OF GUIDED MISSILE
R & D AND PRODUCTION CENTER
REUTOVO 67
MOSKVA, USSR
JUNE 1967
COPY 116
3 PAGES
GROUP I EXCLUDED FROM
AUTOMATIC DOWNGRADING
AND DECLASSIFICATION
Approved For ReilfrpssteM3/06/24 : CIA-RDP02T06408R000600010019-4
25X1
Approved For Release 2003/06/24: CIA-RDP02T06408R000600010019-4
Approved For Release 2003/06/24: CIA-RDP02T06408R000600010019-4
25X1
Approved For ReleMPOOSEGRETA
-RDP02TO
6408R000600010019-4
CHRONOLOGY OF GUIDED MISSILE R & D AND
PRODUCTION CENTER REUTOVO 67, MOSKVA, USSR
INTRODUCTION
Guided Missile R & D and Production Center Reutovo
25X1 67 is located at 55-45-43N 37-52-36E,
in the suburb of Reutovo on the east edge of Moskva, USSR
(Figure 1). A rail line passes along the east side of the
installation but does not appear to enter it.
The installation (Figures 2 and 3) can be divided into 2
sections -- a production section containing a large final
assembly building, a probable subassembly/assembly build-
ing, horizontal and vertical storage tanks, and probable
machine shops and an engineering section containing sev-
eral multistory engineering buildings, a long cylindrical
structure which is either an engine test cell or a wind tunnel,
a high-bay possible assembly building, and machine shops.
25X1 The installation has been covered byl Dhotog?
raphy of only fair interpretability.
A building-by-building construction history of the facil-
ity is presented graphically in Figure 3 and in tabular form in
Table 1, which also provides chronological details and inter-
pretations of the basic functions of all structures; all item
numbers are keyed to Figure 3 and Table 1.
HIGHLIGHTS OF THE DEVELOPMENT
OF GUIDED MISSILE R & D AND
PRODUCTION CENTER REUTOVO 67
1944
Photography of the area revealed only undeveloped
land. The installation has been constructed since 1944.
1962
The first usable post-construction coverage of the in-
25X1 stallation was obtained in and was of fair inter-
pretability. At this time the engineering section appeared
complete; only a high-bay possible assembly building (item
14) and 4 other small buildings have been subsequently
added. The production section was in a very early stage of
construction. Two buildings (items 11 and 12) appeared
complete, and only preliminary excavations were observed
for the major buildings.
1963-1964
In the engineering section the possible assembly building
(item 14) had been added. In the production section, 2
major buildings (items 1 and 7) and 2 smaller ones had
been completed, construction was continuing on the re-
maining structures, and 1 group of horizontal tanks had
been added along the west edge of the section.
1965-1966
In the production section a probable subassembly/
assembly building (item 10) with a high-bay section and 2
smaller buildings (items 3 and 8) had been completed, and
a second group of horizontal storage tanks and a group of
vertical tanks had been added on the west side of the section.
In the engineering section only 4 small buildings had been
added.
Railroad, double track
Railroad, single track
Road
FIGURE 1. LOCATION MAP.
- 1 -
TOP SECRET
Approved For Release 2003/06/24: CIA-RDP02T06408R000600010019-4
FIGURE 2. GUIDED MISSILE R & D AND PRODUCTION CENTER REUTOVO 67,
MOSKVA, USSR,
2?x1
25X1
25X1
25X1
25X1
DP02T06408
Color-coded to show periods of significant construction
CONSTRUCTION
ACTIVITY
250 500
FEET (APPROXIMATE)
Item numbers are keyed to Table 7
HORIZONTAL
TANKS
PRODUCTION SECTION
VERTICAL
TANKS
COOLING
TOWERS
HIG-H-BAY
SECTION
ENGINEERING SECTION
.-TO MOSKVA
FIGURE 3. LAYOUT OF GUIDED MISSILE R & D AND PRODUCTION CENTER REUTOVO 67.
TEST CELL
OR
WIND TUNNEL
Approved For Release 2003/06/24: CIA-REPP02+06408R000600010019-4
TOP SECRET
3PE1
Table 1. Data on Facilities of Guided Missile R&D and Production Center Reutovo 67
(Item numbers are keyed to Figure 3)
Item No
Function
Dimensions (ft)
Length Width
Roof Cover
(sq ft)
Date First
Observed*
Date Apparently
Complete**
Comments
25X1
PRODUCTION SECTION
1 Final assembly bldg
720 x 530
381,600
Preliminary excavation
roof cover includes 176,400 sq ft of high-bay section
25X1
(130 ft high)
2 Possible machine shop
360 100
36,000
3 Unidentified bldg
110 100
11,000
4 & 5 Horizontal storage tanks
Estimated volume of 1
tank 2,830 cu ft; approx no of tanks 30 (2 groups of 15)
25X1
6 Vertical storage tanks
Estimated volume of 1
tank no of tanks undetermined
25X1
(approx) (approx diam)
7 Prob subassembly bldg/machine shop
Irregular
196,300
Preliminary excavation
highest section 55 ft high
25X1
8 Probable machine shop
325 130
42,250
9 Administration bldg
210 80
16,800
10 Probable subassembly/assembly bldg
400 340
136,000
Preliminary excavation
small high-bay section in SE corner
11 Probable machine shop
360 240
86,400
12 Probable machine shop
360 120
43,200
Stibtotal
949,550
ENGINEERING SECTION
13 Unidentified bldg
Irregular
14,000
L shaped; 2-level roof; higher section 100 ft high
14 Possible assembly bldg
280 240
67,200
Has high center section
15 Engineering bldg
710 60
42,600
16 Engineering bldg
710 130
92,300
Connected with bldg 15 by covered passage
17 Test bldg
170 80
13,600
Either a wind tunnel or an engine test cell
18 Engineering bldg
400 60
24,000
19 Engineering bldgs
17,500
2 connected bldgs; may be connected with bldg 18
20 Engineering bldg
730 60
43,800
21 Unidentified bldg
290 80
23,200
22 Machine shop
230 80
18,400
23 Assembly bldg/machine shop
480 280
134,400
21 Administration bldg
180 80
14,400
25 Support shop
180 90
16,200
26 Support shop
190 110
20,900
27 Storage bldg
Irregular'
25,000
28 Unidentified bldg
Irregular
32,000
Subtotal
599,500
Total
1,549,050
*The date first observed is the first date when the item was recognizable as a structure.
**The date complete is the first date when the structure outwardly appeared complete; this date may not be related to the date when the structure was operational.
-2
Approved For ReleaIGIR3/SZE2C REIR
R000600010019-4
?
25X1
25X1
)00600010019-4
Approved For Releafop3SMR:ET-R
REFERENCES
1)P02T0640
8R000600010019-4
MAPS OR CHARTS
USATC series, scale 1:200,000
REQUIREMENT
C-DI5-82,973
NPIC PROJECT
11212/66 (partial answer)
- 3 -
TOP SECRET
Approved For Release 2003/06/24: CIA-RD
02T06408R
Approved For Release 10R/2SECIZEOTT06408R000600010019-4
Approved For Release ICQP6/24
gc
,RUT06408R000600010019-4