CONSTRUCTION OF AN AIRFIELD NEAR HOLTHUSEN-BUCHOLZ

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R011200530006-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 19, 2016
Document Release Date: 
February 6, 2006
Sequence Number: 
6
Case Number: 
Publication Date: 
March 6, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R011200530006-7.pdf162.16 KB
Body: 
; SSIF;CAS l N , .. ~ f .~.. ' 5xI' 1fALUATION-~ WE OF COW E E WE OBTAIN REFERENCES PACES? REMARKS- Apprpved For Release 20?.6 TdTOrYC [ F`i Y0457R011200 30006-7 ,n.. -nes.,_.-. NO- Str>rd. i nn of An A=i rf e Pl r, TTf,pr 'an't +.hii cc,n..,.' ,rl-ilieN f Y PREPARED The construction of a narrow-ggauge fieldd, railroad line crossing the so nzsen-udivigslust railroad line was planned. ~r? iTolthusen.-3uchholz airfield were started in mid-October 1951 and that work proper was begun on 2 January 1952, The ~-.orapletion date of the project was faxed for 25 August 1952? The .1aren i3aunnion has the contract for the work., The site for the field is in a state o-med forest, An area of 100 x 2,800 meters is to be cleared, A as-meter stretch both north and south of the pro- jected field was cleared of trees but the stumps have not been uprooted. Tha top ::oil will be removed. Grading will be done by a Soviet unit -which has nat yet arrived. Io Soviet construction supervisor had arrived. T%,,anty office personnel and 160 workers .:ere employed at the field, Equipment available includes two stump grubbers, one powere'. by a Diesel engine and, Ms l aebe ahl t7pe caterpillar tractoro The trees in. the ,outl~ern section betties cn stations 0 and 20 were uprooted. The poruion of the wooded area opposite the construction material dump (z a,zliof) was cleared, and the logs ore being 'hauled away Clearing was being done on a s.te of about 70,000 square motors near station 35. To contract for tie construction of hangars had been awarded. --hilt working the terrain,, particular attention was given to avoid :uneven spots on the fro and. ;toles -were,, therefore, filled with particular care=. As the contract was placed by the air force construct-ion staff, the auunion believed that an airfield was to be built there. Great stress was placed on the fact that the field was to be constructed not far from a heath in order to save the transportation costs of humus. This project was about 5 to 7 lira from a .-.ramp,, i o spur track was available. The project was designates ""0 1111 by the crder construction staff fbccordin,, to Deputy Construction Chief Loebel (m u), 1,300x000 eastmarks was tentatively ranted.. This sura would suffice only, for the establishment of the constru ation sites and the cutting and uprooting of trees. The actual cost of the project is to bey determined by a detailed tabulation of all the service', Air Lv Lo CLASSIFICATIt O~E4'~ ,(),T~TICI.LS ball I Document No, -------_ (p ------- !/ o C a ii e In C k; s. L 6 ,, C In -d #`' r TS S Approved For Release 2006/02/27 : CIA-R Date: - Approved For Release 2006/02/27 : CIA-RDP82-00457R011200530006-7 VOW required canuot be provided by the cores traction staff some of the .;or?t will be Derfori:ied by Soviet anits-, the soil consisted of a top layer of heath off to u" cm, a sand layer slightly mix d ;wit'. humas up to la cri, and another layer of fine .-;rained. ,ravel with a sli;:;?it admixture of loan and i snarl , survoyin'; was done by the Lresdcn Lau- union in Letzotr n hi.ch is located on the narro.r ,,au;c field railroad line to I.auzer, between S(,nzke and Lauon, The ;_>air_i.nions of 'andenbur1; and Dresden had alleTedl,r refused to take the contract for this work. It, is possible that .wren hanvnion, which already inspected the construction site, ti?ri.ll -et the contract for the iLetzow ;)roject. mx iento For copy Of c2oc " :opt, of a `Iif ux 1o "-'s'ic railroad line is ,~ sc~cl to tray?snort t e Bartz required for ;radin, the airfield near 4Ioolthusor..~25X1 Duch lo1`L, Lion of an a irfioi u believed to be area indicates 0onr entn first time. "_'_he planned. cons truc< was previously reported This information is correct. The location of the field in a wooded and swampy that a training field is to Ie constructed there. The construction of an airfield in :ietzow is re:)orted for the CONFIi+- 0l11Y Approved For Release 2006/02/27 : CIA-RDP82-00457R011200530006-7 25X1 Approved For Release 2006/02/27 : CIA-RDP82-00457R011200530006-7 Approved For Release 2006/02/27 : CIA-RDP82-00457R011200530006-7