NOVO-BAKU PETROLEUM REFINERY BAKU, USSR

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000500220014-1
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 9, 2016
Document Release Date: 
August 21, 2000
Sequence Number: 
14
Case Number: 
Publication Date: 
January 1, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000500220014-1.pdf193.76 KB
Body: 
ILLEGIB Approved For Release 2000/09/08 : CIA-RDP78TO5439A000500220014-1 Approved For Release 2000/09/08 : CIA-RDP78TO5439A000500220014-1 Handle NT-K YHO TICS - 9176/65 CIA/PIR-5026/65 Control l System H Only y CIA, PHOTOGRAPHIC INTELLIGENCE DIVISION Declass Review by NIMA/DOD - NOVO-BAKU PETROLEUM REFINERY BAKU, USSR 1. The Novo-Baku Petroleum Refinery is located approximately two and a half miles from the Caspian, Sea in the eastern sector of the city of Baku, USSR. The geographic coordinates of the approximate center of the refinery are 40 24+ 20N - 49,55 10E and its orientation. is E/W. The refinery is irregular in shape with maximum dimensions of 6,000 feet by 5,000 feet and covers an area of approximately 1+,600,000 square feet. It is served by road, rail and probably. by pipeline. 25X1D period comparison of four KEYHOLE missions over this refinery during the indicates that one major refining unit has been constructed and put in operation during this period while another major refining unit is nearing completion. In addition, a number of other refining units are presently under construction.- Details concerning this construction' activity and other changes at the refinery are discussed in part b of section 2. 2. The limits of the Novo-Baku Petroleum Refinery and the outlines of individual sections-within the'yefinery are shown,on Figure 5-of this report. a. Identification and analysis of the various-sections are discussed under the number corresponding to that-on Figure 5:-- (1) (7) .Area under construction containing several pipe furnaces, several fractionating columns, a possible compressor building, a possible control house, a_ number-of warehouse/maintenance type, buildings,. and POL tank storage Probable intermediate product storage area Two catalytic cracking units (thermofor type) and associated facilities Catalytic cracking unit (fluid type) and-associated facilities Warehouse/maintenance type buildings Area with'a small pipe furnace, two fractionating columns, probable compressor building, control house,. and laydown tanks - Area with a small pipe-furnace, fractionating column, probable compressor building, control house, and POL tank storage - Handle Via -~ -. TALENT-KEYHOLE Control System Only Handle Via TALENT-KEYHOLE Control System Only TOP SECRET RUFF CIA, PHOTOGRAPHIC INTELLIGENCE DIVISION TCS - 9176/65. CIA/PIR-5026/65 (8) Area with four or..five fractionating columns grouped closely together, probable compressor building, control- house, and laydown tanks (9) Possible alkylation unit consisting of several fractionating towers, a large compressor building, a smaller probable compressor building, and laydown tanks (10) Probable intermediate and final product storage area-, aentical (11) probable vapor recovery area with two essentially units each consisting of a large fractionating column, two medium-sized fractionating columns, a smaller fractionating column, three vertical tanks, two probable compressor buildings, and laydown tanks (12) Administration and laboratory -area (13) Area under construction consisting of several refining units in an early stage?of construction and several associated buildings, a number of quonset type buildings, and POL tank storage (14) POL tank storage area including a large tank under construction - (15) Area with a number of warehouse/maintenance type buildings, open material storage, several small towers, and a .water treating pond (16) Probable distillation area with two pipe furnaces, two fractionating columns, probable compressor building, control house,and water treating-pond (17) POL tank-storage - (18) Catalytic cracking unit (Probable fluid type) and associated facilities (19) Two distillation units, each consisting of two pipe furnaces, two fractionating.columns, a compressor building, and lay- down tanks (20) Heat and power plant (21)-?P.OL tank -storage area- (22) Suspect catalytic cracking unit in an early stage of. construction: a number of buildings have been or are being constructed and the construction of the base of a new?unit has begun; the appearance and placement of this unit and the layout of associated buildings are very similar to the catalytic cracking unit and associated facilities in Annotation 19 (23) POL tank storage area including a pump house (21+) Possible catalytic reforming unit under construction with 9-12 small furnaces arranged in three rows, several fract- ionating columns, possible cooling towers, probable control. house, POL tank storage, including three probable spheroidal tanks, and several warehousE/maintenance type buildings -2- TOP SECRET RUFF Handle Via TALENT-KEYHOLE Control System-Only Handle Via TALENT-KEYHOLE Control System Only _25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D TOP SECRET RUFF (1) Construction of the facilities in Annotation l began CIA, PHOTOGRAPHIC INTELLIGENCE DIVISION . TCS = 9176/65 'CIA/PIR-5026/65 (25) Suspect tankcar loading and unloading. facilities (26) POL tank storage area-. (27) Water treating facilities and cooling towers (28) Suspect pipeline station. (29 Probable crude oil storage area (30) Possible petrochemical'-plant associated with the refinery. Construction activity and changes at the refinery from 5):' include the following.(annotation numbers refer to Figure maintenance type buildings which were present-in (2) Construction in Annotation 13 began between (3) 'Construction of the catalytic cracking unit in Annotation 18 began prior to - and was possibly complete by. Smoke coming from this unit at the time of the latest coverage.indicates that it is presently in operation. . (4) The area described under Annotation 22 is still in an early stage.of construction;. construction of some of the buildings may have. begun in M (5) The possible catalytic reforming area described under Annotation 24 has been under construction since and appears nearly complete. (6) Construction of the POL tanks in Annotation 26 began between the area appears (7) complet -- Construction of .the cooling-towers and water treating facilities in Annotation. 27 began between and- they appear:essentially complete as of.= 3. The refinery appears to have been operating in - as indicated-by smoke coming from a number, of refining units. Due to the quality of the photography of it is not possible to determine whether the refinery was operating at that time. 4. All measurements have been made by-the CIA/IAD/IB project analyst. They should be considered as approximate and must not betaken as official NPIC mensuration data compiled by the Technical Intelligence Division, NPIC. -3- TOP SECRET RUFF Handle Via TALENT-KEYHOLE Control System Only Handle Via TALENT-KEYHOLE Control System Only PHOTOGRAPHY TOP SECRET RUFF CIA, PHOTOGRAPHIC INTELLIGENCE DIVISION REFEREI ,ES . 25X1 D TCS - 9176/65 - CIA/PIR-5026/65' General Locator Map, USSR - 29656 1-61 (UNCLASSIFIED) ACIC. US Air Target Chart, Series 200, Sheet o325-25HL, 2nd Edition, March 1963 (SECRET) CIA. C-RR5-82,464 - CIA/IAD.PROJECT 30541-5 -4- TOP SECRET RUFF Handle Via TALENT-KEYHOLE - Control System Only