PROBABLE SAM TRAINING SITE SAM R AND D COMPLEX SHUANG-CHENG-TZU MISSILE TEST CENTER, CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05161A000400010020-3
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
10
Document Creation Date:
December 28, 2016
Document Release Date:
July 15, 2003
Sequence Number:
20
Case Number:
Publication Date:
February 1, 1966
Content Type:
IR
File:
Attachment | Size |
---|---|
CIA-RDP78T05161A000400010020-3.pdf | 1.62 MB |
Body:
SAM R AND D COMPLEX
CODA
Declassification by NIMA/DoD
25
25
S UANG-CHENG TZU MO SS O LF TEST CE
GROUP 1
Eaal d d { a m
agradin4 nd d 1 ..ifi-ti-
CIA/PIR 61088
DATE Feb 1966
MP ZOO P O PAS g:~
6
Approved For Release 2003/08/05 : CIA-RDP78T05161A000400010020-3
25X1 Approved For Release 2003/08/05 : CIA-RDP78TO5161A000400010020-3
Approved For Release 2003/08/05 : CIA-RDP78TO5161A000400010020-3
RECORD
COPY
COPY NO.
PUB. DATE
LOCATION
MASTER
DATE RECEIVED
LOCATION
D I sA ~6 Jiff t,elease 2003/08/05
$, RDP78T
ItIfAb00 0010020
TAX "U' 3
CUT TO o
COPIES
DATE 7/72
CUT TO
COPIES
DATE
COPIES DESTROYED
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
MASTER
DATE
DATE
NUMBER OF COPIES
DATE
R
NUMBER OF COPIES
NO.
DAY
YR.
RECEIVED OR ISSUED
REC D
ISSN D
BAL
MO.
DAY
YR.
ECEIVED OR ISSUED
RECD
ISS'D
BAL
9
4
68
Dist. Unit #93-95
3
3
5
12
4--
X1
SEC. CLASS. LOCATION
PIR 61088 FEB. 1966
25136
Appro
ed For Release 2P0?ISEEREI'
PROBABLE SAM TRAINING SITE
SAM R AND D COMPLEX
SHUANG-CHENG-TZU MISSILE TEST CENTER, CHINA
CIA/PIR-61088
This report has been prepared to present a chronological study of a
probable SAM training site at the SAM R and D Complex, Shuang-Cheng-Tzu
Missile Test Center (SCTMTC), China (Figure 1).
The site is located approximately 1.7 nautical miles (nm) south of
R and D SAM Launch Site A at 41-02-38N 100-31-10E (Figure 2). It was first
25
25
observed on photography of and cannot be negated. 25
The site consists of a probable central guidance area and six unrevetted
launch positions which are arranged in a fan configuration, similar to both
R and D launch sites. No interior road pattern i_s visible within the site.
The average distance between launch positions at the probable training site
is approximately 190 feet, which is similar to both R and D sites.
No vehicles or equipment have ever been identified at the probable training
site, although numerous trails link it to both the main access road serving the
SAM R and D rangehead and to R and D Launch Site A (Figure 2).
No support facilities are present in the immediate site area. However,
since this site is relatively close to the other ranghead facilities, support
is undoubtedly provided by the SCTMTC SAM Housing and Support Area located 2.8
nm to the north-northwest (Figure 2).
The following table presents a chronological study of this site on all
The difference in the number of launch positions visible during the period
of photographic surveillance is possibly due to a variation in photo quality.
It is therefore possible that the training site had six launch positions through-
out the period of coverage.
available photographic coverage through
25
25
-1-
Approved For Release 20~RM
RDP78TO51
25
25
Appro
ed For Release pp0N?R RDP78T0
25;
25
CIA PIR-61088
OPERATIONAL SUPPORT
AND STORAGE FACILITIES
SAM LAUNCH
n
ITI
I
ES
4_-- -
PROBABLE SAM
PATTERN
'I 1 __-__--_- 3
PV ~~
ZE_~
SHUANG-CHENG-TZU
AIRFIELD
----- Trail
_T Railroad
Concrete road
Dirt road
--- Cable scar
? Support area
o Launch site
Tactical SAM site
e Transmitting site
? Receiving site
o Radar site
Approved For Release 2T(W0$3ECKW
25
25
aA For Release 20031
0
ME"
FAA-
MIMM,
11
FRUP7qT05161AO0040001P
xi
ed For Release 4WOSE?RW
RDP7
T05161A000400010020-3 25
25
CIA PIR- 10
MAPS AND CHARTS
SAC. US Air Target Chart, Series 200, Sheet 0287-16HL, 1st edition,
May 1962, Scale 1:200,000 (SECRET)
C-S15-82,619
CIA/IAD PROJECT
30731-5
-2-
Approved For Release 2f Wb6(RRI'fk
RDP78 05161A00040
25
25
X1
Appro
ed For Release IOP/OSR&T -RDP78T0 161 A000400010020-3
Construction Number of
Status Launch Positions
CIA/PIR-61088
Remarks
1 possible position Site Identification Only
visible
-- Site Identification Only
-- Site Identification Only
2 possible posi- Site Identification Only
tions visible
Probably Complete 4 positions and 2
probable positions
visible
Only 4 positions Site Identification Only
visible
Site Area Identification
Only
X1
No apparent change 6 positions
0
Only 4 positions Site Identification Only
visible
Only 2 positions Site Identification Only
visible
Only 4 positions Site Identification Only
visible
Undetermined * 6 positions
visible
Site Identification Only
* Due to poor quality photography.
Approved For Release J /[{TI~-RDP70T05161A0004000I
25
25
25
25
Approv$
d For Release OPOE?RE RDP78TO
Table I continued...
Undetermined * Only 4 positions
visible
25
25
CIA PIR-61088
6 positions Site Identification Only
visible
No apparent change 6 positions
since visible
Construction Number of
Status Launch Positions
Only 4 positions
visible
No apparent change
6 positions
visible
Undetermined * Only 4 positions
visible
No apparent cha e 6 positions
since visible
No apparent change No apparent change
* Due to poor quality photography.
-4-
Approved For Release IOR/C&H5RE1i[
25
25
Approved For TM 8/OSEARpT8T05161A000400010020-3
Approved For Release ] O1 10SECR . IT05161A000400010020-3