DESCRIPTIVE DATA ON THE STALINOGROD AREA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83-00418R000800160005-7
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
13
Document Creation Date: 
December 27, 2016
Document Release Date: 
July 10, 2013
Sequence Number: 
5
Case Number: 
Publication Date: 
July 22, 1955
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP83-00418R000800160005-7.pdf923.59 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 INFORMATION REPORT INFORMATION REPORT CENTRAL INTELLIGENCE AGENCY This material contains information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title 18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law. 50X1 COUNTRY Pola,nd SUBJECT DATE OF INFO. PLACE ACQUIRE DATE ACQUIRED Descriptive Data on the Ste1inogred Area REPORT NO. DATE DISTR. NO. OF PAGES REQUIREMENT NO. RD 22 July 1955 12 REFERENCES 1'4 SOURCE EVALUATIONS ARE DEFINITIVE. APPRAISAL OF CON1ENJ7J1 TENTATIVE. 50X1 50X1 STATE 150X1 (Note: Washington distribution indicated by "X Field distribution by "#".) Litop, Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 ? '"riri fir CONFIDENTIAL 50X1 COUNTRY Poland SUBJECT Descriptive Data on the-Stalinogrod- (Katowice) Area DATE OF INFORM PLACE ACQUIRED ? REPORT NO. 50X1 DATE DISTR. 23 Arne 1955 NO. OF PAGES 11 REFERENCES: THIS IS UNEVALUATED INFORMATION 50X1 50X1 The following is a legend to the attached enclosure, an overlay of US Target Complex Mosaic: Series 25, 0232, 9965-3-25M Gliwice-SOsnowiec area. 1. Zgoda Iron and Steel Works in Swietochlowice - Forffierly called the Silesian Iron and Steel Works-. :No steel was produced in this plant. It was su lied with steel?by other steel plants. In 1953-1954 50:00 in a Polish newspaper that-_this plant was going to pro- uce some metallic household goods. Ppproximately 1500-2000 workers were employed in the plant in three eight-hour shifts. There was no expansion construction going on in the plant from 1948 to the end of 1953. 2. Slag Dump - Very high; good visible landmark. 3. Double Track Railroad 7 Built on a high earth bed.; ran in the dir- ection of Gliwice:. Heavy passenger and freight traffic; a train every 10 to 15 minutes. This Was the main railroad connecting Stalinogrod (Katowice) with the West. 4. Polska Coal Mine - The employees worked three eight-hour shifts, CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83;00418R000800160005-7 4 50:00 CONFIDENTIAL - 2 - there was no expansion construction since 1934. 4a. Florian Iron and Steel Works - The employees worked three eight-hour shifts. No expansion construction since 1935. This plant produced steel and pig iron. 5. Viaduct - Approximately 85 m x12 m x 4 5 m, arched, lined with white tile. 6. Single Track Railroad Bridge - Steel constrUction. Simply supported quadrangular throUgh-truss. .The bridge was approximately 12 m long and 4 m wide. Little traffic. 7. Main Highway to Gliwice and Bytom Cobblestone, five to six meters wide. Heavy traffic. 8. Marketing Hall - Brick construction, rounded roof. 9. Street Bridge over Railroad Track .-.Concrete construction, 18 m x.9 m. This bridge was the only connection between the two parts of Chorzow which were divided-by railroad tracks.. It was the best approach to the highway which went in the direction of:Tarnowskie Gory and Lubliniec. Heavy traffic. 10. Square - Used for circus and other Open air entertainment activities. Popularly named, "Market Square". 11. Department Store (Powszechny Dom Towarowy)? Five-story brick construction, 12. Railroad Bridge - Two separate, arched, truss, steel constructions, 17 m x 4 m, each had a single railroad track. This was the main bridge connecting Stalincgrod with Bytom. -Heavy passenger and ,freight traffic. 13. Soccer Stadium. 50X1 14, Industrial Installation - in 1948 this plant was known under the name, "Haiduki Coke Chemical Plant" (Haiduckie Zaklady Kokso ?Chemiczne). No further information. 15, Industrial Installation - Believed to be the Eatery iron and steel works. No further information. 16. Railroad Station in Chorzow-Batory - Formerly called Hajduki. Four-story, brick construction, approximately 14 m x 9 m, gable roof covered with red tile. There were about nine sets of tracks running in front of the station. The tracks began to branch off about 900 m east of the railroad station; Some of the tracks by-passed the station and joined the main line again, narrowing down to a double track about 1500 in wee of the r? station. The tracks west of th stati?n ri two levels: on built up'^' earth bed and at ground level, the lower tracks to be side tracks to point #14 above. 17. Viaduct - Concrete construction, rectangularly shaped. 70 m x 8 in x There was a row of steel pillars on each side approximately 1.5 m from the concrete wall spaced at about 6 in intervals. 18. Soccer Stadium - One of the largest in Poland. Property of the 1.zch sport club. 19. Cobblestone Road - Partly four lane avenue. Connects the Stalinogrod- Gliwice highway (point 27) with the highway to Bytom (point 7). CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 CONFIDENTIAL -3- 20. Freedom Square (Plac Wolnosci) in Chorzow. 21. Chorzow Coal Mines Production Control Office - Belonged to the Chorzow Coal Industry Association -(Chorzowskie Zjednoczenie Przemyslu Weglowego). Three-story brick construction, 45 m long. Gable roof covered with tile. 22. FihatibelgaIlaitiv0hidKo?t16stXtvSteel and Iron Works - Two or three- story brick construction, 40 m long. Gable roof covered with red tile. Bookkeeping and finance offioes. Were Iodated in this: building. 50X1 23. Kosciuszko Steel and Iron Works ?- located on both sides of the highway, .Point 424 Poor quality' -Steel and pig iron were produced in this plant The plant employed 9,000 - 10,000 persons. 24. Double Track Railroad to Bytom 7 Heavy traffic. During the day a pas- senger train passes every lhoura. 25. Liberation Mountain (Gora WyzWolinia) Formerly park and mountain of St. Anna (park i gore Swietej Army). Park with one large and one small soccer stadium, and one swimming pool. 26. Living Quarters for Coal Miners - Constructed 1950 - 1951. Prefabricated house (domki finskie) settlement. 27. Main Highway from btalinogrod West - Partly cobblestone, partly asphalt, 13 m wide. Heavy passenger and commercial traffic. 28. Kleofas Coal Mine - This was the smallest coal mine in Stalinogrod. The coal was of the poorest quality and was difficult to mine. 29. Quarry - Out of operation; filled with water. 30. Coal Mine Ventilation Shaft - Out of operation. Two-story, brick con- struction, 7 m x 7 m, located on top of a hill. 31. Gardens with Several Villas. 32. Lake. 33. Soccer Stadium - Supposed to be finished in 1956. This stadium was to be the largest in Silesia, and one of the largest in Poland. Sta- dium capacity, 80,000 - 90,000 persons. 34. Amphitheatre. 35. Restaurant. 36, Fair Grounds. 37. Firing Range - Could be utilized for international competition. 38. Kleofas Coal Mine Administration, Club Building, and Recreation Area Had a small park and swimming pool. 39. Chorzow Highway - Cobblestone, 8m wide. Heavy traffic. 40. Park of Culture and Rest (Park Kultury I Wypoczynki) - Was under con- struction. Popularly known as the "Swiss Valley" (Dolina Szwajcarska). 41. Astronomical Observatory and Planetarium - Under construction. Was supposed to be finished in 1956. Was to be accessible to general public. CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 - CONFIDENTIAL - 4 50X1 42. Local Highway, Siemianowice-Chorzow - Cobblestone, eight meters.wide. Light traffic. 43. Local Highway - The first l - 2 km section north of highway, point 39, was named Debowa Street; cobblestone, .12 m wide. 44. Catholic Church and Cemetery 7. Red brickOOTIPtrUction, one tower.. 45. Housing Settlement - Prefabricated houses constructed in 1949 - 1951; quarters for coal miners. 46. Swimming Pool and Bugla Beach, 47. Gardens. 48. Curved, Single Track Railroad - Steel construction, 15 m x 4 m, simple support, quadrangular through-truss. Only freight traffic. This track made it possible for freight trains going from west to south, and from south to west to avoid the Stalinogrod Railroad. Station. 49. Catholic Church, 50, Small Park and House of Culture (Porn Kultury) - Belonged to the Baildon Steel Plant. 51, Soccer Stadium of the Baildon Steel Plant. 50X1 52, Baildon Steel Plant - 53. Gottwald Coal Mine - Formerly Eminencja coal mine. This coal mine was the largest in Stalinogrod. It had the largest production, the best quality of coal, and employed the greatest number of workers. It was supposed to be one of the best mines in Poland. 54, Central Bakery - Constructed in 1950-1951. Brick construction, 35 m x 25 m, height of a five-story building, flat roof. This bakery sup- plied all the state controlled bakeries in Stalinogrod. 55. Elementary School - Construction finished in 1953. "E" shaped brick construction. Four to five-story high, 85 m long. Gable roof covered with red tile. All children from the Koszutka settlement, point 74, were supposed to go to this school. 50X1 56. Infantry Caserne - 57. Double Track Railroad - Side tracks to the Welnowiec Zinc Plant.(Welno- wieckie Zaklady Hutniczo-Cynkowe), and to the Precision Optics Indus- try Plant (Zaklady Przemyslu Precyzyjno Optycznego), Heavy freight traffic, a train every 15 minutes. 58. Storehouse - New open wall construction, 25 m x20 m m. Low gable roof covered with tile, supported by pillars. This stdiehouse was used for the storage of concrete plates. There was a single track railroad going to the storehouse. 59. Single Track Railroad Bridge - Masonry blocks bridge, 7 m x 4 Heavy freight traffic. 60, Unidentified AAA Trobp Caserne - 61. Cobble tone Road - liriveway six Tile**mid(e4t 44- 111 ? 50X1 ..,../ivriDENTI AL Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 CONFIDENTIAL -5- 62. Park in Welnowiec. 63. Highway, Stalinogrod-Siemianowice - Partly asphalt, partly cobblestone. Driveway 9 m wide. Heavy traffic. This was the shortest route for traveling north from Stalinogrod. , The first 1.5 km section from point 39 north was called Armii Czerwonej St., the rest of the highway was named Siemianowice highway (Szosa. Siemianowioka). 64. Housing Settlement -.Completed i4.1.953,;; City Property... Living quarters for workers and officials. AtOUt_351Dul,ldinge four-story brick con- structions, 35 m x 12,m. Gable:roqe'00Vered wl.t.h. tile. 65. Market Square in Siemianowice. 66. Railroad Station in Siemianowice - Two-story brick construction, 25 m x 10 m. Low gable roof covered with tarpaper. 67. Jedncsc Steel and Iron Plant - Formerly Laura Steel and Iron Plant. High quality steel was produced there. This plant specialized in pipe production. The pipes produced there were supposed to be the best in Poland. The plant did a certain amount of military production. There were approximately 8,500 workers employed in this plant. There was no expansion construction after WW II. 68. Weinowiec Zinc Plant (Welnowieckie Zaklady Hutniczo-Cynkowe) - Formerly the Kunegunda Zinc Plant. 4,000 persons were believed to be employed there. There was no expansion construction after WW II. 69. Double Track Railroad, Stalinogrod-Siemianowice-Bytom - Strictly local line. Very light passenger and freight traffic. The frequency of passenger traffic was five to six trains daily in each direction. 70. Chapel. 71. Small Park and a Building Belonging to the Stalinogrod Coal Industry Association (Stalinogrodskie Zjednoozenie Przemyslu Weglowego) - Three- story brick construction, 45 m x 13 m. 72, Precision Optics Industry Plant (Zaklady Przemyslu Precyzyjno-Optyc- znego) - Formerly the Iwoka Optics Plant (Optyczne Zaklady Iwoka). Several buildings, number unknown. The main production hall burned down in 1948-1949, and was rebuilt in spring, 1952. It was a five- story construction 50 m x 25 m. The first two stories were of brick construction, and the last three stories of glass, steel construction. Flat roof, partly glass. Before WW II this plant produced binoculars, magnify.ng glasses, microscope parts, and other special-purpose glasses and parts. In 1952, with the completion of the new production hall, some production changes were made. Precision aim50x1 ing mechanisms or parts were produ?uu uneve . 73. Garden and 'Oblate Fathers, MonasteWOlaSitortOjbow4bi4ta0 TWL"' OL'IiC 1. I .1 74. Marchlewski Housing Settlement (Osiedle Imienia Marchlewskiego) - Newly constructed, popularly knomas Koszutka. Living quarters for workers and officials. Three to five-story brick constructions, different types and dimensions. This settlement had 30,000 inhabitants. 75. Three Buildings Four-story brick constructions, 25 m x 12 m. Gable roof covered with tile. These buildings were occupied by Polish Army Officers and dependents* Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 CONFIDENTIAL - 6 - 76. Main Mining Institute (Glbwny Instytut Gorniczy-GIG). The building was constructed in 1948-1949; brick construction, 70 m x 25 m. The height ranged from two to six stories. Flat roof. 77. Stalinogrodzka Street - Formerly Katowicka Street.. 'Cobblestone, eigh.t meters wide. 78. Bogucice Cemetary. 79. Catholic Chvrch, 80. Apartment Building - Constructed in 1950H1951 :Nine-story brick con- struction, 65 m x 13 m. Flat: roof This building was utilized as liv- ing quarters for officials of the Central Administration of Steel and Iron Production and some other official's. 81. Four Barracks - Occupied by a construction company (Przedsiebiorstwo Budowlano-Montazowe); wooden constrUct-44x74 .20 mx9mx 3.5. Low gable roof covered with tarpaper 82. Five to Six Barracks - Utilized for living quarters Wooden constructior 20 mx9mx 3.5m Low gable roof covered with taivaper, Each barracks was located in a small garden, 50X1 83. Four Storehouses - Belonged to the city Sanitation Department (Zaklad Oczyszczenia Miasta.ZOM).The main storehouse was of brick construction, 4 m ion: six m hi h. Low able roof covere 84. Mining and Rescue Equipment Factory - Brick construction, 35 m x 12 m x 8 m. Low gable roof covered with tarpaper. The factory was in oper- 50:00 ation 24 hours daily and employed about 250 workers in three eight hour shifts. this factory was to be closed in 1955 and transferred to Tarnowskie Gory where it was to occupy larger facilities and increase its production. 85. Ventilating Shaft of the Stalinogrod Coal Mine. 86. Office Building - Construction completed in 1954. Seven-story steel, glass construction, 110 m x 14 m, flat roof. Seven different construc- tion offices (Przedsiebiorstwa Budowlano-MontaZowe) and almost all con. ? t4! struction planning and project offices in Stalinogrod were located in this building. This building was one of the best and most modern con- structiOnpin Stalinogrod. On certain occasions it was kept illuminated at night for propaganda purposes 87. Sawmill. 88. Main Gas Station - One of the few in Stalinogrod. 89. Stalinogrod Coal Mine - Formerly the Katowice Coal Mine and prior to that the Ferdinand. Coal quality, average. The mine chambers extended under the town all the way to the airfield., point 115. They also join the chambersof the Gottwald Coal Mine. 90. Bogucicka Street - Cobblestone, driveway average)eight :meters wide. 91. 1 Maja Street - Formerly Krakowska Street. This was the main highway to Sosnowiec, Czestochowa, and Warsaw, with a fork to Krakow. Cobble- stone, 14 m wide. Very .heavy traffic Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 50X1 CONFIDENTIAL -7- 92. Wooden Bridge over the Rawa River - 8 m x 5 m. This bridge was not used by trucks. 93. Rawa River. 94. Northeastern Part of Stalinogrod "City - Densely populated.area. For 50:00 pinpoint location of office buildings industrial establishments and street layout, 95. Scrap Metal Collecting Place ,..1_HadOneOverhead ularly known as.HUta Marta; 96. Barracks Area Several construCtion.compinies were located in these barracks. traveling crane. Pop- 50:00 97. Northwestern Part of Stalinogrod City - Densely populated area. For pinpoint location of office buildings, industrial establishments and street layout, 98. Railroad Viaduct over Miklowski Street - Two arches; concrete construc- tion. One arch for vehicular traffic 60mx5mx4 m, and one arch for pedestrians 60 in x 3 in x 2.5 in, The inside of the viaduct, walls and ceiling, was of white tile. 99. Railroad Viaduct over Kosciuszko Street - Rectangular steel.00nstruction, supported by two rows of "ji" shaped steel pillars spaced three in apart. The pedestrian arches on both sides between walls and pillars were 40mx2mx5 m, and the vehicle arch was 40mx13mx5 m. The walls were of white tile. 100. Railroad Viaduct over Francuska Street - This viaduct was reconstructed in 1948, Rectangular concrete construction supported by concrete pillars spaced four in apart. The pedestrian arches between the walls and the pillars were 40 in x 1.5 in x 5 in. and the vehicle arch was 40mx9mx5 m. 101. Railroad Viaduct over Damrota Street - Rectangualr concrete construction 40 m x 11 in x 4 in, pedestrian and vehicle arches combined.. 102. Railroad Viaduct over Rasinski Street - Rectangular concrete construction 40mx8mx4 in. The walls were of white tile. Average vehicular traffic. 103. Railroad Viaduct Rectangular brick construction, 30mx8mx4 in. Heavy vehicular traffic. - 50)0 104. Industrial Installation - Porcelain factory "Gisza". be either Huta Ferum or No further information. 105. Three or four Railroad Tracks - Main railroad line from Stalinogrod to the east and northeast (Krakow, Warsaw). Very heavy passenger and freight traffic. A train passed every three or four minutes. 106. Foreign Broadcast Jamming Station - About twenty 20-25 m high antenna poles. They were errected in 1948-1949. 107. Stalinogrod Radio Station - Two 40 in high antenna poles; only medium wave broadcasts. 108. Paderewskiego Street - Partly cobblestone, partly gravel; five in wide; light traffic. P.NFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83:00418R000800160005-7 CONPIDENTIAL - 8 - 109. Southern Part of Stalinogrod City - Densely populated area. For pin- 50:00 poin location of office buildings, industrial establishments and street layout, 110, Public Hall (Hala Ludowa) 7 Construction completed in 1953. Brick construction, 75 M x 30 M x 14 m Low gable roof covered with sheet iron. This building was utilized for musical and sport performances. It had about 5,000 seats.: - 111. Trolley Depot Building) briok-Construction?. 25 mettee wide!, 16 meters high. Length unknown'. It was a very old OnstrUCtIon, Plans were made to build a new tr011eydepO 112. Fairground. 113. Soccer Stadium, 114. Triangulation Point .(Wieza TriangulacYjna). Wooden tower built at the highest point in southern Stalinogrod. 115. Civilian Airfield- - This airfield was utilized by single engine sport aircraft, and two engine commercial aircraft .of the Polish Airline 50:00 (Polska Linja LOtnicza - LOT), seen sin 50:00 engine conventional fighter aircraft flying over the airfield. 50:00 they landed on the airfield.. 116. Air Terminal - Brick constructibn,:30 m'x 15 m x 14 m. Flat ,roof, hangars. Corrugated sheet iron construction; rounded roof. No information. Two further 117. Runway - Constructed in 1948-1949; concrete, 600m x 14 m. Good condition. 118. Giszowiecka Highway (Szosa Giszowiecka) to Tychy-Bielsko - This was the main highway to the south. It was partly cobblestone, partly asphalt; seven meters wide; heavy traffic. 119, Double Track Railroad - Built on a raised earth bed; ran to Janow- Myslowice. It was a single track railroad until 1954, when the second track was constructed. This line wasistrictly A freight line with light traffic 119a. Probable Railroad Bridge - No further information. 120. Stadium for Motorcycle Racing. 121. Double Track Standard Gauge Railroad and Single Track Narrow Gauge Railroad - Constructed 1952-1954. Laid on a raised earth bed. The narrow gauge railroad was called:the 'Sand Rail Line" (Magistrala Piaskowa). When completed, the standard gauge railroad will make it possible for freight trains going from east to west or west to east to avoid Stalinogrod railroad station. 122. Industrial Installation - Still under construction. Construction began in 1953. Source had seen several large production halls, low brick construction with glass :Tool's. There were also several over- head traveling cranes No further information. 123, Railroad Bridge - Steel construction with concrete suPpdrts. Old construction, 1938-1939; light traffic. 124. Highway - Side road to connect Tiotrowice with the main highway, point 138; asphalt) six metere CONFIDENTIAL Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 50X1 CONFIDENTIAL -9- 125. Single Track Railroad Local line connecting Stalinogrod with Murcki, Kostuchna, and Tychy. Light traffic; mostly passenger. Freight traffic to only the coal mines in Murcki (Boze Dary), and Kostuchna. 126. Highway Bridge - Constructed before WW II. Concrete construction, 15 m x 7 in, over a double track railroad; average traffic. 127. Double Track Railroad - Main line from Stalinogrod south (Prague). Heavy passenger and freight traffic. Passenger trains every six minutes; freight trains every 15 minutes. 128. Barracks Area - Six to eight barracks, brick construction, 20 m x 6 in x 3,5 in. Low gable roof covered with tarpaper. These barracks were utilized as living quarters for women workers. 129. Single Track Railroad - Main line from Stalinogrod to Rybnik. Single track, from Stalinogrod to Orzesze (30 km); double track, from Orzesze to Rybnik; local passenger and freight traffic. A train every hour during the day. 130. Piotrowice Locomotive and Car Repair Plant (Piotrowickie Warsztaty Kolejowe). Passenger, freight car and major locomotive repairs were done here. No further information. 131. Construction Company (Spoleczne Przedsiebiorstwo Budowlane) - Included one barrack for offices, and an area for storing construction materials, 132. Piotrowice Machine Plant (Piotrowicka Fabryka Maszyn) - Was under expansion construction in 1949-1951 and 1953-1954. For further infor- mation see page 11, this report. 133. Industrial Installation - Under construction. Construction began 1952. Several overhead traveling cranes. Could be part of the industrial installation point 122, this report. No further information. 134. Tent Camp Area of the Service to Poland Organization (8luzba Polsce) 135. Cemetery. 136. Garden and Monastery of the Franciscan Monks - This was the largest monastery in Silesia. 137. Six Prefabricated Barracks - 25 m x 7 m x 3.5 m, occupied by Service to Poland "troops. , Low gable roof covered with tarpaper. 138. Milowska Highway (Szosa Mikolowska) - Main highway from Stalinogrod to Mikolow and Rybnik. Asphalt, nine m wide; average traffic. 139. Railroad Station in Ligota - Brick construction, 20 m x 15 in x 11 in. Gable roof, covered with tile. 140. Electrical Substation - Brick construction, 6mx6mx7 in. 141. Two Storehouses - Wooden construction, 25 m x 15 in x 6 in. Gable roof covered with tarpaper. Some kind of slabs were storedthere. 142, Oil Refinery - Reconstructed in 1946-1947. Two to three tanks eight 50X1 m high and six m in diameter were seen there No further information. 143. Highway Bridge - Built over a double track railroad. Steel construc- tion with concrete supports, 25 in X 6 m. There were railroad signals on the bridge. CONFID8NTIAL Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 50X1 CONFIDENTIAL - 10'- 144. Chemical Plant - No further information. 145. Highway Bridge - Was under construction in 1954. 146. Railroad Bridge - Double track railroad, completed in September, 1954. Steel construction 13 m long. Two standard gauge tracks and one narrow gauge track ran across the bridge. Each track had a separate bridge. 147. Brynowska Highway (Szosa Brynowska) ? Partly asphalt, partly cobble- stone. 148. Housing Settlement- One-family houses. Was under construction in 1954 149. Small Chemical Plant - Before WW II it produced tooth-paste or shoe cream. No further information. 150. Kosciuszko Park. 151. Parachtate Tower - About 40 m high, utilized for public entertainment. 152. Wujer Coal Mine - No further information. 153. Highway Bridge - Built over a double track railroad. Concrete corn- struction, 13 m x 8 in; light traffic. 154. Narrow Gauge Railroad Bridge - Built over a double track railroad, constructed in 1947. Concrete arch, closed spandrel construction. 155. Local Highway - Asphalt, eight in wide. Almost no traffic. 156. Double Track Railroad - Ran from Stalinogrod to Ligota and Gliwice. Light traffic. Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7 bUX1 ? ? CONFIDENTIAL - 11 - ? ? sketoh of Piotrowioe Machine Plant LeOend a. Administration Butlding - Constructed 19. Four-story brick conettvuc- Lion, 25 m x 12 m. Gable roof covered with tile. , b. Production Hall - Constructed 194(3 1951. Brick consqultion, 80 m long, 18 m high. Monitor roof. N c. Overhead Traveling Crane. d. Production Hall - Brick construction, 75 m x 45 m x 15 m. Curved roof covered with tarpaper. e. Railroad - See point 129, on the enclosure to this rep rt. f. Overhead Traveling Cranc - Was under construqion in 1 53 - 1954, g. Highway - See point.lai on the enc osure tolhiS r-pOrt. ,,,, --,, \s, \ CONFIDENTIAL ( j Declassified in Part - Sanitized Copy Approved for Release @ 50-Yr 2013/07/10: CIA-RDP83-00418R000800160005-7