PROGRAM PROGRESS REPORT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP75B00159R000400150011-0
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
14
Document Creation Date: 
December 19, 2016
Document Release Date: 
September 25, 2006
Sequence Number: 
11
Case Number: 
Publication Date: 
October 15, 1973
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP75B00159R000400150011-0.pdf383.22 KB
Body: 
Approved For Release 2006/09/25: CIA-RDP75B00159R000400150011-0 Approved For Release 2006/09/25: CIA-RDP75B00159R000400150011-0 Approved For- Release 2006/09/25: A&PPf5B00159R000400150011-0 TOP IDEALIST ? 9263-10-73 5 of 12 15 OCT 1973 MEMORANDUM FOR: Director, CIA Reconnaissance Programs SUBJECT: Program Progress Report Forwarded herewith are three copies of the IDEALIST Program Progress Report for the period 1 July 1973 - 30 September 1973. ,, J. X. Brigadier General, USAF Director of Special Activities II 6457- 73) 25X1 CLASSIMI) i, SC-IEf:!i;> C` L ~, : C;?T GORY: t o In ofc) Impossible to Determine (unless i:::;osz;',t ..:;t dac or event) IDEALIST TOP SECRET GROUP I EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION approved For Release 2006/09/25: CIA-RDP75B00159R000400150011-0 Approved For Release 2006ij1 : gUA--RQP;5B00159R000400150011-0 ? IDEALIST V SAS/O/OSA D/CRP D/CRP D/CRP DDS&T Reg D/SA SAS/O/OSA D/O/OSA IDEA/O/OSA INTEL/O/OSA D/ M/ OSA AMS/OSA RB/OSA (12 October 1973) IDEALIST TOP SECRET 19263-10-73 Page 2 GROUP I EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Approved For Release 2006/09/25: CIA-RDP75B00159R000400150011-0 TOP SECRET IDEALIST IDEA LIST OPERATIONAL SUMMARY AND STATUS (1 July 1973 - 30 September 1973) A. Nine IDEALIST TACKLE operational missions were alerted during this period. ~ 1~ 11 missions were planned to be own no closer than nautical miles to the China mainland coast. The following is a summary of the missions flown: 3. I I along the south China coast and Hainan Island. The mission was flown to collect photo information utilizing the "H" camera configuration. The pilot reported the weather to be worse than forecast and estimated 60 percent mission success. The Hainan and Fort Bayard areas were obscured by clouds. Twenty-seven of 86 prog and five bonus non-COMIREX tar ets were hotographed. I 25X1 IDEALIST TOP SECRET GROUP I EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Approved For Release 2006/09/25: CIA-RDP75B00159R000400150011-0 TOP SECRET IDEALIST 16457-73 Section Page 2 25X1 4. north of Shanghai along the north central ina coast. is mission was designed to collecti photo information utilizing the "H" camera configuration. The mission was flown as briefed with no unusual activities or sightings reported. Weather was reported as briefed with 40 percent mission success. Sixty- seven of 100 programmed targets, seven bonus COMIREX tar ets, and 14 bonus non-COMIREX tar ets were hotographed. II B. One mission was flown from) to obtain standoff photography of coastal oar Vietnam with the "Hry camera configuration. This mission was planned to approach no closer than 12 nautical miles from the North Vietnam mainland or offshore islands. 25X1 and provided the best peripheral coverage to a e o the Vietnamese coastal areas. Coverage was obtained from northern Quang Tri province in South Vietnam to the Don Son peninsula in North Vietnam. The mission provided new or updated information on land and waterborne logistics routes, logistics support facilities, transshipment points and storage areas, SA-2 deployment, status of military barracks and airfields, and a limited amount of new ground order of battle 25X1 information. The mission was flown as briefed with no unusual activities or sightings reported. II. GENERAL A. FRED DOT - One sortie was flown in support of continuing IDEALIST TOP SECRET GROUP I EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Control System Only Aooroved For Release 2006/09/25: CIA-RDP75B00159R000400150011-0 Approved For Release 2006/09/25: CIA-RDP75B00159R000400150011-0 Approved For Release 2006/09/25: CIA-RDP75B00159R000400150011-0 Approved For lease 2006/09/25: CIA-RDP75B00159R000400150011-0 TOP SECRET IDEALIST A. Detachment "G" (Edwards AFB - North Base) Aircraft 2 U-ZR Pilots L 16457-73 sec ion 1 Page 4 PILOT AND AIRCRAFT STATUS (AS OF 30 SEPTEMBER 1973) Aircraft Operationally Ready (Standby Status) IDEALIST TOP SECRET GROUP I EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Approved For Release 20061. L : gLA--RDEfB00159ROO0400150011-0 IDEAtLIST IDEALIST DEVELOPMENT SUMMARY AND PROGRESS (1 July 1973 - 30 September 1973) 25X1 I. IJIRF RAME A. J-75P13B Engine Improvement 1. First and Third Stage Turbine Blades a. The feasibility of extending engine Hot Section Inspection (HSI) and Time Between Overhaul (TBO), as a result of improved first and third stage turbine blades, was indicated during the routine overhaul of the first of three engines in this test program. b. Evaluation of first stage turbine blades at approxi- mately 700 hours and third stage blades at 1400 hours produced highly satisfactory results. (1) First stage blades were totally free of leading edge cracks, were in very good condition, and no blades required replacement. The earlier blade had a replace- ment factor of up to 60 percent for cracks. (2) Third stage blades were found in good condition and no replacement blades were required. 2. Constant Speed Drive (CSD) Modification a. Three CSD units have been delivered to the contractor for use in a feasibility test program designed to obtain a CSD/Main AC generator system that will stay on line for low engine RPM used during final approach. IDEALIST TOP SECRET GROUP I EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Approved For Release 2006/09/25: CIA-RDP75B00159R000400150011-0 TOP SECRET IDEALIST 2. After five satisfactory test flights conducted between 27 and 31 August, Serial Number 002 was deployed to Detachment "H" on 4 September. Following continued flight testing, the configuration was declared Operationally Ready on 14 September 1973. Section Z Page 2 b. The CSDs will be reworked to permit incorporation of a new fixed wobbler prior to laboratory feasibility testing scheduled for December 1973. B. U-ZR Flight Test and Operational Training Summary 1. IDEALIST Program accomplishments in U-2R aircraft since introduction include 11, 863.7 hours on 3664 sorties as of 30 September 1973. 2. Flight test and operational data are depicted below: 1 JUL-30 SEP FLIGHTS 1 JUL-30 SEP TIME 1 - 051 46 125.0 2 - 053 48 132. 3 3 - 054 50 152.1 4 - 055 44 183.7 TOTAL 188 593. 1 PAYLOAD A. "H" Camera - 1. During August the decision was made to remove the mirror from Detachment "H" configuration Serial Number 003 and install it in the thermally modified configuration Serial Number 002, located at the contractor's facility. IDEALIST TOP SECRET 457-73 GROUP 1: EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Approved For Release 2006/09/25: CIA-RDP75B00159R000400150011-0 TOP SECRET IDEALIST 16457-73 Section 2 Page 3 3. Serial Number 003 was then returned to the contractor's facility on 6 September for thermal modification and installation of a new mirror. This configuration is scheduled to enter flight testing early in November 1973. B. "H" Hatch Pressure Test 25X1 73, in an attempt to define the cause of the ghost image anomaly evidenced on some photographic products. As a result of this consultation, the effects of air density across the hatch windows became a candidate for serious consideration. 2. Lockheed developed a method for instrumenting the "H" hatch to measure this environmental effect, and two flight tests were conducted to acquire operational data. This data is currently being evaluate 1 -1 25x1 1. Serial Number 229 was returned to the contractor's plant on 13 July 1973 because its performance did not meet contract specifications. Contractor evaluation indicated that platen recontouring would be necessary to bring the configuration up to customer requirements. Recontouring is being accomplished, and Serial Number 229 is scheduled to reenter flight testing late in October 1973. 2. Serial Number 230 experienced accidental dropping while being loaded into the Q Bay and was returned to the contractor's facility on 24 July for repair. Repair work was completed and the configuration resumed flight testing on 21 September 1973. D. Camera - This configuration entered the contractors plant as sc eduled on 14 August for installation of a second f/3. 5 apochromatic lens and variable slit modification to the scan heads. The unit is scheduled to be redelivered to Detachment "G" during January 1974. IDEALIST TOP SECRET GROUP I EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Ainuroved For Release 2006/09/25: CIA-RDP75B00159R000400150011-0 Approved For Release 2006/09/25: CIA-RDP75B00159R000400150011-0 Approved For Release 2006/09/25: CIA-RDP75B00159R000400150011-0 Approved For Release 2006/09/25: CIA-RDP75B00159R000400150011-0 TOP SECRET IDEALIST 457-73 ecion2 Page 6 a 25X1 Medical Activities 1. S1010 Parachute Retainer Strap - The retainer strap used to insure that the main riser of the RQ-225 parachute remains properly positioned on the shoulder will be lengthened one inch on all S1010 full pressure suits. This action follows successful cted in September 1973 25x1 device feasibility study has been successfully completed. Helicopter test flights using a breadboard model were accomplished in September 1973. Live parachute drop tests are scheduled to begin the week of 15 October 1973 in Buffalo, N. Y. IDEALIST TOP SECRET GROUP I EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION 2. Automatic Seat Kit - P : 91P, ,p[f B00159R000400150011-0 Approved For Release 20061f U9125 0 IDEA LIST ? 457-73 sec ion 2 Page 7 3. S1010 Pilot Protective Assembly (PPA) Flotation Development - A flyable prototype flotation assembly for subject #434 was evaluated at Detachment "G" on 21 September 1973. Based on the successful results of this cockpit study, the new flotation will be test flown during the next quarter. If successful, an additional 20 pounds of buoyancy will be provided the pilot to assist him, if necessary, in surviving in a rough sea condition. 5. Shark Deterrent Screen - The shark deterrent screen (shark bag) developed by Dr. C. Scott Johnson of the Naval Under- sea Warfare Center, San Diego, California, appears to be a more reliable method of providing shark protection to a downed pilot than the existing chemical shark chaser. Cost estimates have been requested from the prime contractor of the full pressure suit, the David Clark Company, to fabricate a small number of bags. The I I will also 25X1 be approached for a price estimate on the same item. ThI has been instrumental in the past in successfully vacuum pac aging otherwise rather large and bulky items such as the jungle hammock for inclusion in the U-2R survival seat kit. I I 1. L Survival Trainin - Parasail, tropical, and seacoast survival training was conducted fo 25X1 from 23 July through 5 August 1973 in southern Florida. Physiological training, explosive decompressions, and pressure suit low pressure chamber flights were also accomplished during this quarter. Both pressure suits required some factory rework for proper fit, all of which has been completed and the suits are in place at Detachment "G". IDEALIST TOP SECRET GROUP I. EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Training Activities Approved For Release 2006/09 2L : ~ f5BOOl59ROOO4OOl5OOl 1-0 'TOP 9 IDEALIST 6457-73 Section 2 Page 8 2. I IL,ife Support Conference - The semiannual Life Support Conference was AFB, San Antonio, Texas, held at R on 15 - 16 August 1973. f AMS/OSA, attended this meeting. IDEALIST TOP SECRET GROUP I. EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION