PHOTOGRAPHIC INTELLIGENCE REPORT STATUS OF ALUMINUM PLANTS IN COMMUNIST CHINA (Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05161A001200010051-0
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
13
Document Creation Date:
December 28, 2016
Document Release Date:
February 5, 2003
Sequence Number:
51
Case Number:
Publication Date:
December 1, 1966
Content Type:
IR
File:
Attachment | Size |
---|---|
CIA-RDP78T05161A001200010051-0.pdf | 2.69 MB |
Body:
Declass Review by NIMA/DOD
25X1
MAGERY
N
A LYS IS
25X1
25X1
DEC. 1966
GROUP 1
E..l.J.i bum . 11,
;_3
PAGES o
8
Approved For Release 2003/03/04 ? CIA-RDP78TO5161AO01200010051-0
25X1 Approved For Release 2003/03/04: CIA-RDP78TO5161AO01200010051-0
Approved For Release 2003/03/04: CIA-RDP78TO5161AO01200010051-0
RECORD
COPY
COPY NO.
PUB. DATE
LOCATION
MASTER
DATE RECEIVED
LOCATION
1&6 tL6 9 6 Tease 2003/03/04:
` DP78T0
Ye1'A 1206010051-
MAXI MUM 10
CUT TO
COPIES 0
DATE
1 -73 .
CUT TO
COPIES
DATE
COPIES DESTROYED
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
CUT TO
COPIES
DATE
MASTER
DATE
DATE
NUMBER OF COPIES
DATE
NUMBER OF COPIES
MO.
DAY
YR.
RECEIVED OR ISSUED
REC D
ISSD
DAL
MO.
DAY
YR.
RECEIVED OR ISSUED
RECD
ISSD
DAL
1
9 1
57
Dist , Unit #39-48
10
10
3
G
~I~'i~ 03_ oS
/
/A
f
.-
,`~
1712
-3
01200010051-0
SEC. CLASS. LOCATION
Dec.- 1966
DATE
NUMBER OF COPIES
DATE
RECEIVED OR ISSUED
NUMBER OF COPIES
MO.
DAY
YR.
RECEIVED OR ISSUED
RECD
ISS'D
BAL
MO.
DAY
YR.
RECD
ISS'D
BAL
Approved Fur Rel
ease
2-0031
03104
-CM
-Mul
lic
I Ualb-IAUU-12000 I 051-u
Approved For Re
ease
2003/
T3/04
CI?
-RD
78
05161A001200010051-0
Dec. lchS
SEC. LOCATION
TSB
25X1
25X1
25X1
25X1
25X1
25X1
25X1
An analysis was made of seven selected aluminum plants in Communist
China to detect evidence of new construction or changes in the level of
activity.
Six of these plants have undergone no change in facilities or
operational status The following is a brief description of
these six plants:
The Cheng-chou Aluminum Plant, located at 34 45N - 113 35E,
has two completed, but not operating pot rooms. The
construction status on the third and fourth pot rooms
remains much the same on overage as it was
on coverage. The lack of activity on the
I
ved For Release 2f0Si ?R RDP78T05161A001200010051-0
coverage indicates that the plant is not
operating.
The Fu-shun Aluminum Plant, located at 41 52N - 123 49E,
has eight pot rooms that were all operating on
coverage. The facilities at the plant remain
same on coverage as they were on
coverage.
The Ho-fei Aluminum Plant, located at 31 57N - 117 17E,
has one completed pot room and a foundation for a second.
25X1 Imagery of evealed the construction status of
the second pot room unchanged since imagery of
The lack of activity and fumes in the area of the
25X1 comp eted pot room indicates that it is not operating.
The Lan-chi Aluminum Plant, located at 29 14N - 119 26E,
has one completed pot room. A second pot room was previously
thought to be under construction at this plant, but upon
further study this activity was identified as the initial
25X1 construction for a casting shed and a support building.
The level of construction is unchanged from
imagery tol imagery. The lack of fumes on
25X1 I Icoverage indicates the plant's one pot
room is not in operation.
Approved For Release A
-1-
am
25X
25X
25X
25X
25X
25X1
25X1
25X1
25X1
25X1
Approveq
For Release 20pOP35EC fDP78T05161A001200010051-0
The Lan-chou Aluminum Plant, located at 36 08N - 103 36E,
has two completed pot rooms. The plant, as imaged on
coverage, appears inactive as no smoke is
being emitted from the stack serving the pot rooms.
25X1
25X1
25X1
The Pao-to'u Aluminum Plant,located at 40 34N - 110 09E,
has two completed pot rooms both of which were in operation
on overa e. The facilities remain unchanged
from
The seventh selected Chinese aluminum plant, Kuei-yang Aluminum
Plant, is located at 26 39N - 106 WE Ksee Figure 1). This plant has
undergone considerable expansion sincel _j The two pot rooms
that were in the early stages of construction at that title were observed
as nearing completion on coverage (see Figure 4). A
casting shed, a transformer yard, a steam plant, four alumina silos, an
administration building, and several storage and support buildings have
also been constructed during this time interval. An administration
building and three support buildings remain under construction.
The Kuei-yang Aluminum Plant is a part of a complex which contains
an alumina plant and an aluminum fabrication facility (see Figure 2).
The alumina plant was in the mid-stages of construction on
coverage (see Figure 3).
The identifiable features of this plant have been annotated on Figure
3. The aluminum fabrication facility consists of two completed rolling
mills, one rolling mill in the early stages of construction, two storage
buildings, and several support buildings (see Figure 5). The facilities
in this area were not in operation on coverage.
25X1
25X1
25X
25X
25X
-2-
Approved For Release 2d OTh3 R/I~
25X5 Approved For Release 2003/03/04: CIA-RDP78TO5161AO01200010051-0
Approved For Release 2003/03/04: CIA-RDP78TO5161AO01200010051-0
TOP S
TOP SECRET 0
.D.
4.
5.
6.
7.
8.
9.
10.
12.
13.
14.
TOP SECRET
ORE UNLOADING
CRUSHING AND SCREENING BUILDINGS
LIME KILNS (2)
ORE STORAGE
DRYING KILNS (U/C)
ORE STORAGE
AUTOCLAVE BUILDING
THICKENER TANKS
PROBABLE FILTER BUILDING
PRECIPITATORS (U/C)
THERMAL POWER PLANT (U/C)
SETTLING TKWoc~1IR~lease 200 !" :,
CALCINING KILNS U C
ALUMINA STORAGE AND SILOS
PIR 75069
FIGURE 3
1.
Pot rooms (2)
2.
Rectifier building
3.
Transformer yard
4.
Switch house
5.
Casting shed
6.
Steam plant
7.
Warehouses (2)
8.
Alumina silorA ved For Relec
9.
Spray pond
10.
Administration building (U/C)
TOP SECRET
PIR 750
FIGURE 4
TOP SECRET
a:
Rolling mills (2)
Rolling mill (U/C}
Administrat#c0 1~pgp,9I S
Possible fabrication building
Storage buildings (2)
25X1
PIR 750625X
FIGURE 5
KUEI-YANG FABRICATION FACILITY
=I-YANG, CHINA 25X1
2641N- 1o6 4+0E
I001200010051-0
ApprR
ved For Release 2003/03/04: Cl T05161A001100 1005 - 25X1
TOP SECRET PIR - 75069
25X1
25X1
(Kuei-yang) U.S. Air Target Chart, Series 200, Sheet 0496-10HL,
Scale 1:200,000, 2nd Edition, 15th RTS, October 1965 (SECRET)
REQUIREMENT
C-RR6-84,000
CIA/IAD PROJECT
30375-7
25X1
25X
Approved For Release r/n 1 -RDP78T05161A001200010051-0
Approved For Release 2/ MOSE 05161AO01200010051-0
Approved For Release OQi03/0SEc-RDPTTO5161AO01200010051-0