PHOTOGRAPHIC INTELLIGENCE REPORT STATUS OF ALUMINUM PLANTS IN COMMUNIST CHINA (Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05161A001200010051-0
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
13
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 5, 2003
Sequence Number: 
51
Case Number: 
Publication Date: 
December 1, 1966
Content Type: 
IR
File: 
AttachmentSize
PDF icon CIA-RDP78T05161A001200010051-0.pdf2.69 MB
Body: 
Declass Review by NIMA/DOD 25X1 MAGERY N A LYS IS 25X1 25X1 DEC. 1966 GROUP 1 E..l.J.i bum . 11, ;_3 PAGES o 8 Approved For Release 2003/03/04 ? CIA-RDP78TO5161AO01200010051-0 25X1 Approved For Release 2003/03/04: CIA-RDP78TO5161AO01200010051-0 Approved For Release 2003/03/04: CIA-RDP78TO5161AO01200010051-0 RECORD COPY COPY NO. PUB. DATE LOCATION MASTER DATE RECEIVED LOCATION 1&6 tL6 9 6 Tease 2003/03/04: ` DP78T0 Ye1'A 1206010051- MAXI MUM 10 CUT TO COPIES 0 DATE 1 -73 . CUT TO COPIES DATE COPIES DESTROYED CUT TO COPIES DATE CUT TO COPIES DATE CUT TO COPIES DATE MASTER DATE DATE NUMBER OF COPIES DATE NUMBER OF COPIES MO. DAY YR. RECEIVED OR ISSUED REC D ISSD DAL MO. DAY YR. RECEIVED OR ISSUED RECD ISSD DAL 1 9 1 57 Dist , Unit #39-48 10 10 3 G ~I~'i~ 03_ oS / /A f .- ,`~ 1712 -3 01200010051-0 SEC. CLASS. LOCATION Dec.- 1966 DATE NUMBER OF COPIES DATE RECEIVED OR ISSUED NUMBER OF COPIES MO. DAY YR. RECEIVED OR ISSUED RECD ISS'D BAL MO. DAY YR. RECD ISS'D BAL Approved Fur Rel ease 2-0031 03104 -CM -Mul lic I Ualb-IAUU-12000 I 051-u Approved For Re ease 2003/ T3/04 CI? -RD 78 05161A001200010051-0 Dec. lchS SEC. LOCATION TSB 25X1 25X1 25X1 25X1 25X1 25X1 25X1 An analysis was made of seven selected aluminum plants in Communist China to detect evidence of new construction or changes in the level of activity. Six of these plants have undergone no change in facilities or operational status The following is a brief description of these six plants: The Cheng-chou Aluminum Plant, located at 34 45N - 113 35E, has two completed, but not operating pot rooms. The construction status on the third and fourth pot rooms remains much the same on overage as it was on coverage. The lack of activity on the I ved For Release 2f0Si ?R RDP78T05161A001200010051-0 coverage indicates that the plant is not operating. The Fu-shun Aluminum Plant, located at 41 52N - 123 49E, has eight pot rooms that were all operating on coverage. The facilities at the plant remain same on coverage as they were on coverage. The Ho-fei Aluminum Plant, located at 31 57N - 117 17E, has one completed pot room and a foundation for a second. 25X1 Imagery of evealed the construction status of the second pot room unchanged since imagery of The lack of activity and fumes in the area of the 25X1 comp eted pot room indicates that it is not operating. The Lan-chi Aluminum Plant, located at 29 14N - 119 26E, has one completed pot room. A second pot room was previously thought to be under construction at this plant, but upon further study this activity was identified as the initial 25X1 construction for a casting shed and a support building. The level of construction is unchanged from imagery tol imagery. The lack of fumes on 25X1 I Icoverage indicates the plant's one pot room is not in operation. Approved For Release A -1- am 25X 25X 25X 25X 25X 25X1 25X1 25X1 25X1 25X1 Approveq For Release 20pOP35EC fDP78T05161A001200010051-0 The Lan-chou Aluminum Plant, located at 36 08N - 103 36E, has two completed pot rooms. The plant, as imaged on coverage, appears inactive as no smoke is being emitted from the stack serving the pot rooms. 25X1 25X1 25X1 The Pao-to'u Aluminum Plant,located at 40 34N - 110 09E, has two completed pot rooms both of which were in operation on overa e. The facilities remain unchanged from The seventh selected Chinese aluminum plant, Kuei-yang Aluminum Plant, is located at 26 39N - 106 WE Ksee Figure 1). This plant has undergone considerable expansion sincel _j The two pot rooms that were in the early stages of construction at that title were observed as nearing completion on coverage (see Figure 4). A casting shed, a transformer yard, a steam plant, four alumina silos, an administration building, and several storage and support buildings have also been constructed during this time interval. An administration building and three support buildings remain under construction. The Kuei-yang Aluminum Plant is a part of a complex which contains an alumina plant and an aluminum fabrication facility (see Figure 2). The alumina plant was in the mid-stages of construction on coverage (see Figure 3). The identifiable features of this plant have been annotated on Figure 3. The aluminum fabrication facility consists of two completed rolling mills, one rolling mill in the early stages of construction, two storage buildings, and several support buildings (see Figure 5). The facilities in this area were not in operation on coverage. 25X1 25X1 25X 25X 25X -2- Approved For Release 2d OTh3 R/I~ 25X5 Approved For Release 2003/03/04: CIA-RDP78TO5161AO01200010051-0 Approved For Release 2003/03/04: CIA-RDP78TO5161AO01200010051-0 TOP S TOP SECRET 0 .D. 4. 5. 6. 7. 8. 9. 10. 12. 13. 14. TOP SECRET ORE UNLOADING CRUSHING AND SCREENING BUILDINGS LIME KILNS (2) ORE STORAGE DRYING KILNS (U/C) ORE STORAGE AUTOCLAVE BUILDING THICKENER TANKS PROBABLE FILTER BUILDING PRECIPITATORS (U/C) THERMAL POWER PLANT (U/C) SETTLING TKWoc~1IR~lease 200 !" :, CALCINING KILNS U C ALUMINA STORAGE AND SILOS PIR 75069 FIGURE 3 1. Pot rooms (2) 2. Rectifier building 3. Transformer yard 4. Switch house 5. Casting shed 6. Steam plant 7. Warehouses (2) 8. Alumina silorA ved For Relec 9. Spray pond 10. Administration building (U/C) TOP SECRET PIR 750 FIGURE 4 TOP SECRET a: Rolling mills (2) Rolling mill (U/C} Administrat#c0 1~pgp,9I S Possible fabrication building Storage buildings (2) 25X1 PIR 750625X FIGURE 5 KUEI-YANG FABRICATION FACILITY =I-YANG, CHINA 25X1 2641N- 1o6 4+0E I001200010051-0 ApprR ved For Release 2003/03/04: Cl T05161A001100 1005 - 25X1 TOP SECRET PIR - 75069 25X1 25X1 (Kuei-yang) U.S. Air Target Chart, Series 200, Sheet 0496-10HL, Scale 1:200,000, 2nd Edition, 15th RTS, October 1965 (SECRET) REQUIREMENT C-RR6-84,000 CIA/IAD PROJECT 30375-7 25X1 25X Approved For Release r/n 1 -RDP78T05161A001200010051-0 Approved For Release 2/ MOSE 05161AO01200010051-0 Approved For Release OQi03/0SEc-RDPTTO5161AO01200010051-0