SEARCH FOR SUSPECT NUCLEAR POWERED CHICOM PASSENGER VESSEL, TIENTSIN, T ANG-KU, CHINA COMPLEX

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05161A000900010066-8
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
20
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 6, 2003
Sequence Number: 
66
Case Number: 
Publication Date: 
April 1, 1966
Content Type: 
IR
File: 
AttachmentSize
PDF icon CIA-RDP78T05161A000900010066-8.pdf4.28 MB
Body: 
SEARCH-F-Ou-SU ECT WUCLEAR POWERED CH 0 COM PASSENGER VESSEL, T II ENTS ~ N, T'ANG-KU, OH 0 NA COMPLEX Declass Review by NIMA/DOD MAGERY ALYSIS O ISION CIA/PIR 67260 DATE APRIL 1966 -- i IMF SLR?RE U n A el Cr 17 Approved For Release 2003/03/04: CIA-RDP78TO5161A000900010066-8 25X1 Approved For Release 2003/03/04: CIA-RDP78TO5161A000900010066-8 Approved For Release 2003/03/04: CIA-RDP78TO5161A000900010066-8 r~vled For Release 2AQR ft CI - 0 25X1 SEARCH FOR SUSPECT NUCLEAR POWERED CHICOM PASSENGER VESSEL, TIENTSIN, T'ANG-K[I, CHINA COMPLEX 25X 25X1 Approved For Release 2TOP tE RIT d For Release 24q (p3 ftkCt 25X1 25X1 25X1 An analysis of recent hotography covering the Tientsin - T'ang- 25X1 Ku Complex (38-59N 117-44E has been performed for evidence of the reported construction of a large nuclear powered passenger ship. An article appearing in the January-February 1966 issue of Energie Nucleair stated that construction of a 20,000 GRT nuclear powered ship was begun at the Tientsin Shipyard during No evidence was revealed from this analysis to substantiate that 25X1 25X1 I The basic search effort was an attempt to locate a large vessel of this type under construction or fitting-out in the Tientsin area and to determine if a shipyard facility was available to build a ship having a LOA of 600 to 650 feet. In addition to not locating the suspect nuclear ship, no facility capable of building a unit this large was observed during the search. Of the numerous small facilities located along the Hai Ho between Tientsin and the sea, only three repair facilities (Hsin Kiang Shipyard, Figure 3; Ta-Ku Naval Base, Figure 4; and Hai Ho Conservancy Board Dockyard, Figure 5) can be considered significant. Of these, only the Hsin Kiang Shipyard possesses significnat re- pair and construction capabilities. Currently, a possible passenger ship having an approximate LOA of 400 feet is being built at the Hsin Kiang Shipyard. See annotation 3, Figure 3. ' Of interest is the fact that the Japanese presented to the 1958 International Conference on the Peaceful Uses of Atomic Energy, a design for a nuclear powered passenger ship that is nearly :identical to the design described in Energie Nucleair. Selected paragraphs from both articles are presented in Appendix I and II to illustrate the similarities in specifications and terminology. 25X1 Approved For Release 21i0M(RE1FkIRDP78T05161A000900010066-8 25X5 Approved For Release 2003/03/04: CIA-RDP78TO5161A000900010066-8 Approved For Release 2003/03/04: CIA-RDP78TO5161A000900010066-8 25X1 LOCATION : T'ANG-KU PORT' FACILITIES GEO COORDS: 38-59N 117-44E TOP SECRET CIA IMAGERY ANALYSIS DIVISION 25X1 25X1 A. Tiang-ku Port Facility This port facility is the principle seaport for Peiching and the surround- ing region. B. Hsin Kiang Shipyard. See detailed annotation, Figure 3. C. Hai Ho (river) lock east (length of lock approx 590'). D. Water level control gates. These gates are used to maintain navigable water depths for ocean going vessels on the river as far inland as Tientsin. 25X1 E. Hai Ho (river) lock west (length of lock approx 420'). 25X1 25X1 25X1 Appendix III contains selected photography of thel which was transferred to the Nationalist government in 1940 and subsequently captured by the Chinese Communists in 1949. This unit, apparently 'a stripped hull, was towed from Shanghai to T'ang-ku during mid-1965 and now appears to be undergoing a modest effort at being re- furbished. by the Communists) is presently moored just off the T'an.g- u or aci i y. Approved For Release 21NM VT-WRET (LOA approx 510'). 1 25X1 25X1 25X1 Approved For Release 2003/03/04: CIA-RDP78T05161A000900010066-8 TOP SECRET 25X1 25X1 CIA/FIR- 72 0 25X1 SHIPYARD : HSIN KIANG SHIPYARD LOCATION : T'ANG-KU, CHINA GEO COORDS: 39-OON 117-43E 1. 2. 3. 25X1 25X1 25X1 4. 25X1 A. B. C. D E. F. KEY TO VESSEL ANNOTATIONS ON FIGURE 3 Unidentified vessel at fitting-out wharf (LOA approx 360'). Two small unidentified vessels (LOA of each approx 100'). Possible passenger ship under construction (LOA approx 400'). 25X1 25X1 The building way that this vessel occupies was observed to be clear of all activity on Activity of an undetermined nature (probably the initial stages of construction on this vessel) could be seen on The shape of the hull could be discerned on showed that the superstructure was complete h Th identified as a possible passenger s p. i ld b l s e cou and that the vesse determination was based on the fact that a relatively short foredeck and a long block superstructure was visible. Little external construction a ears to have been undertaken during the period Two possible small barges alongside building way (not measured). 25X1 KEY TO FACILITY ANNOTATIONS ON FIGURE 3 Graving dock (length approx 360'). This dock appears to have caisson gates, a feature that is lacking on other graving docks in this area. Unoccupied building way (length approx 560'). Occupied building way (length approx 540'). 25X1 th a rox 520'). V-;4-+ t wharf (len g ing- ou pp Probable wharf under construction (length of completed portion as of Possible fabrication building. This three bay structure is evaluated as a fabrication building on the basis of its size and proximity to the building ways. NOTE: All measurements were made by the CIA/IAD project analyst. 25X1 t 1 1 I TOP SECRET p a lease X003/03/04 : CIA-RDP78TI, TOP SECRE rs q3f `mIes~e `2 TY BOUNDR aprove ` e 03/03/04 : CIA-RDP7811 1A00 TOP-SECRET IAI-HO CONSERVANCY BOARD DOCKYARD ; T'ANG-KU, CHINA 39-01N 117-37E 4&ppro . Fo ~se Approved UIA/PIE-b'(2bo 25X1 25X Approved For Release M/& MI For Release 20123/0~/A?R 25X1 ed For Release 2003/03/04: Cl - - F. 1- TOP' SECRET CIA PIR- 72 0 , CIA IMAGERY ANALYSIS DIVISION 25X1 APPENDIX I 1 FRENCH ARTICLE DISCUSSING "NEW CONSTRUCTION CHICOM NUCLEAR C PYR POWERED PASSENGER VESSEL" (CIRCA 1966) Extracts-from Energie Nucleair, January-February 1966 - pages 40-43. " Work on a first vessel of this type, that is a nuclear powered one which began in April 1964 at the Tientsin Shipyard, will shortly be fully completed. The vessel will soon be used in coastal shipping in the China Sea, especially between Tientsin and Shanghai. This ship will have a gross tonnage of 20,000 tons and will be able to trans- port 3,400 passengers at a cruising speed of 23.5 knots. It is a ship with sheltered bridge, bulbous bow and a cruiser stern. It has four complete decks. The hull is divided by 10 transversal water-tight bulkheads and includes three holds forward and two holds aft. The engine and reactor compartments are slightly aft.... The ship named Zan Than (Voice of the People), will have a main engine made up of two 22,000 HP turbines having two parallel sections connecting a 2- stage reducer by two shafts. The propellers are five-bladed and turn at a rate of 160 revolutions a minute. The reactor will be of the pressurized water type of 180 megawatts. The two main steam generators will be capable of 120 tons an hour. They, together with the auxiliary equipment of the reactor installation, will be housed in a pressure-tight; enclosure in order to protect the surrounding area of the reactor compartment from mechanical damage which could result from the projection of objects or against contamination by radioactive vapors or gas in case of a break in the high-pressure equipment.... The reactor core will consist of 98 fuel rods and 27 cruciform control rods. 1 It will be surrounded by 4 stainless steel concentric and cylindrical thermal shields. The core tank which, will contain the core will by cylindrical, with a hemispheric bottom and with. a top cover. The cooling water will penetrate at the bottom of this tank through four nozzles located in the middle. The reactor core will contain about 8,380 kilograms of 1.7% enriched uranium in the form of uranium oxide. This uranium fuel will be placed in capsule-form in a zirconium alloy tube, and each rod will be tested to avoid difficulties resulting from deformations and vibrations of the fuel pellets, and yet possessing the required nuclear and thermal characteristics. 1 6 25 1 Approved For Release T /c4 1i -RDP78T05161A000900010066-8 Ap ,r uv d For Release 2aa3ffi V1'Qa.RcltI 25X1 CIA PIR- 72 0 CPYRGH This ship will not include fuel replenishment installations because the Tien- tsin Nuclear Committee has felt that this is not a usual type of project; instead, this will be carried out in special installations equipped with all the necessary means. Nevertheless, the Committee has given great stress to obtaining the maximum of security and facility of refueling in the equiping and construction of the reactor installation.... The control of this reactor will consist in maintaining a constant average temperature; this principle will be the one best adapted to the conditions imposed on the reactor. The preliminary study carried out by the Tientsin Nuclear Committee on the dynamic characteristics of this reactor has shown that a great intrinsic stability could be counted on, and that its responce to load variations would very well sustain a comparison with conventional boilers. The committee also expected that sudden load variations (fluctu- ations from full load to no load) would occur for short periods while the vessel was getting under way or on its arrival in a port. In such cases, the quality of excess steam in the turbines circuit will be small; it will be discharged in the atmosphere when the steam will reach the pressure limit. According to the Committee, there is therefore no need to make provision for a discharge condenser...." 25X Approved For Release JA8/03F$ R 4 ed For Release T Q T&W CIA, IMAGERY ANALYSIS DIVISION 25X1 JAPANESE PROPOSAL FOR A NUCLEAR POWERED EMIGRANT PASSENGER VESSEL (CIRCA 1958) Extracts from session G-6 of the 1958 International Conference on the Peaceful Uses of Atomic Energy. A Nuclear Powered Emigrant Ship, by Seuchi Takeuchi, Takashi Okamura, and Sootoo Murakami. Of 20,100 tons gross, this nuclear powered emigrant ship would be a passenger,cargo vessel, to carry 2300 emigrants with a service speed of 23.5 knots. As shown in the general arrangement, the ship is a shade deck vessel with raked stem, bulbous bow and cruiser stern. There are four complete decks "A", "B", "C" and "D", Compass Bridge, Navigation Bridge Deck, Bridge Deck and Boat Deck. The hull sould be divided by 10 water-tight transverse bulk- heads, with three fore and two aft cargo holds. The engine and reactor rooms are located slightly aft. The main propulsion machinery is two sets of cross compound, double reduction geared steam turbines each of 22,000 shp. Compatible with this engine output and the ship's form, five-bladed propellers of 160 rpm are used. The reactor is of the pressurized water type with a thermal output of 180 MW, and the main steam generators are two sets each of 120 tons per hour capacity. These, with other associated reactor plant auxiliaries, are con- tained in a pressure-tight containment vessel to fully protect the areas adjacent to the reactor compartment from mechanical damage by the release of missiles (fragment of disintegrating rotors, etc), or from contamination of radioactive vapours or gas in case of a rupture in the high pressure equipment. The reactor core consists of.' 88 fuel assemblies and 17 cruciform control rods, and is surrounded by three concentric, cylindrical thermal shields of stain- less steel. The reactor pressure vessel containing the core, is a right cylindrical vessel with a hemispherical bottom and is enclosed by a top en- closure. The coolant enters the vessel through four inlet nozzles at the bottom, flows upward through the core and then is discharged through four outlet nozzles at the middle of the body. The reactor core contains about 7270 kilograms of uranium with an enrichment of 1.7% in the form of uranium oxide, and is designed to produce 1.55 x 1012 kcal of heat energy, which corresponds to 10,000 hr of full load operation, or an average fuel burn-up of 9200 Mwd per ton of uranium oxide. The initial nuclear and mechanical Approved For Release 2dWJb3&KRR- 21 25X1 Approv CIA/PIR-6T260 core design data is shown in tables 3 and 4. The uranium fuel is inserted in a zircalov tube in the form of pellets, and the fuel assembly is so de- signed as to avoid problems of fuel rod buckling or vibration, and arranged to satisfy. the nuclear and thermal characteristics. No refueling equipment has been considered in this design, because it is thought that refueling is not routine work and should be conducted at a special location where all the necessary facilities have been fully installed. However, in the arrangement and construction of the reactor plant, attention has been fully given to what is considered to be the most safe and easy re- fueling procedure. The control scheme of this reactor will be that of a constant average tempera- ture most appropriate for meeting the requirements of the reactor. A preliminary analysis of the dynamic characteristics of the reactor indicated that an adequate inherent stability can be expected, and that the response to load changes would compare quite well with conventional boilers. A sudden load change such as "full load" "no load" - "full load" can be expected to occur for short periods when arriving and departing. The excessive steam in the turbine cycle on such occasions will be small in quantity; it will be discharges into the atmosphere when the steam pressure rises over the limited value. Therefore, no dump condenser will be required...." 25X1 25 Approved For Release 1i ed For Release 2g dP3J,?t flt UE ( 4R UA-RDP78TO5161 A000900010066-8 TOP SECRET Approved For Release 2003/03/04: CIA-RDP78T05161A000900010066-8 25X1 APPENDIX III EX-BRT-_ SH CRUISER AURORA PHOTOGRAPHED MOORED IN HUANG-PU RIVER KIANGNAN SHIPYARD (31-12N 121-29E) SHANGHAI, CHINA. IMAGED THE CRUISER MOORED NEAR THE TANG-KU-PORT FACILITY QUAY. 25X1 25X1 FTa_TTP 6 PHOTOGRAPH OF BE-. FORE BEING DI TLED BY THE COMMUNIST CHINESE (CIA 25X1 I 25X1 I 25X1 I 25X1 I Approvefd For Release 25X1 25X ACIC US Air Target Chart, Series 200, Sheet M0381-7 HL, Scale 1:200,000, II Edition, November 1965 (SECRET 2 5X 25X 10 - 25X Approved For Release 2d (OR3 E R Z- DP78TO5161A000900010066-8 Qnn d For Release TQQP/%fta - - I CIA/PIR-67260 25X1 DOCUMENTS 25X1 US Navy Hydrographic Office - HO PUB 94, Coast of China, 6th Edition, 1959 (UNCLASSIFIED) Hydrographic Department, Lords Commissioners of the Admiralty, China Sea Pilot, Vol III, 1954 and Vol III Supplement 1963 (UNCLASSIFIED Proceeds of 1958 International Conference on the Peaceful Uses of Atomic Energy, Vol 8, Article 1319, pages 167-181, A Nuclear Powered Emigrant Ship by S. Takeuchi, T. Okamura and S. Murakami UNCLASSIFIED Energie Nucleair, January-February 1966, pages 40-43,"Nuclear Powered Coastal Vessel for Use Along the Chinese Coastal Area" (UNCLASSIFIED) 1 I Approved For Release ON?RE -RDP78TO5161A000900010066-8 Approved For ReleasIV3/ 18T051 61 A00090001 0066-8 Approved For ReleaseT20P03/SE T78TO5161A000900010066-8