KH-4 MISSION 1041 10-23 MAY 1967 MISSILE EDITION

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP99T01396R000100370001-2
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
188
Document Creation Date: 
December 28, 2016
Document Release Date: 
January 29, 2002
Sequence Number: 
1
Case Number: 
Publication Date: 
June 1, 1967
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP99T01396R000100370001-2.pdf11.51 MB
Body: 
5SARU i Alp ov lease 209402/27: CIAO 99T01396R00010037000 'j PHOTOGRAPHIC INTER-P,' INTERPRETATION EPOR `: KH-4 MISSION 1041 10 - 23 MAY 1967 MISSILE EDITION Declass Review by N I MA/DO D Approved ForTFf a5 jj2/27 : CIA-RDP99TO1396RO TCS-80337/67 JUNE 1967 COPY 21 190 PAGES GROUP I EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 This document contains Information affecting the national security of the United States within the meaning of the espionage laws U. S. Code Title 18, Sections 793 and 794. The law prohibits its transmission or the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized to receive Information in the designated control channels. Its security must be maintained in accordance with regulations pertaining toTALENT-KEYHOLE Control System. TARGET CATEGORIES 1. GUIDED MISSILES * A. ICBM Deployment B. IRBM and MRBM (including search areas) C. Research and Development (including space) D. Production Facilities (including test) E. Suspect Missile (Search area or undetermined activity) F. G. Naval Launched Missiles H. Anti-Missile Missile 1. SAM Sites J. Short Range Surface-to-surface Missiles K. Missile support/storage areas L. SAM Training Complexes 2. AIRCRAFT A. Long Range Bases B. Production Facilities (including R and D) C. Airfields 3. NUCLEAR ENERGY A. Test Area B. Production C. Stockpiles D. Research Institutes E. Suspect Activity 4. NAVAL ACTIVITY A. Operating Bases B. Production Yards C. Commercial Ports D. Locks and Canals 5. BIOLOGICAL/CHEMICAL WARFARE A. BW/CW Test Areas (including test) B. Production C. Storage D. Research Institutes E. Suspect Activity 6. ELECTRONICS A. Missile Tracking Facilities B. Electronics (general) 7. MILITARY A. Military Installations B. Special Areas C. D. Landing Beaches E. F. G. Tactical SSM Support Facilities 8. URBAN/INDUSTRIAL A. Complexes B. Industrial Plants C. Geodetic Control Points 9. OTHER A. Unidentified Installations * Digits in these numbers indicate specific target complexes. A suffix identifies in- dividual components within thecomplex. Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Handle Via CF(',9.~ ~ p' TALENT-KErA~pproved ForReleas2 Z90 C c 96R00010037000jC2S_6337/b7 Control System Only KH?4 MISSION 1041, 10-23 MAY 1967 TABLE OF CONTENTS PREFACE HIGHLIGHTS MISSILES INDEX OF TARGETS ATTACHMENTS Handle Via Approved For Release ~p0~Q~1 ff~.C1AUgRg9~TQa?96R00010037000 Control oHOLE nly HandALENT le Via .proved For Release'ZOOZOc l A=~DP9JT 1F 396R0001003700( g-80337!67 Control System Only KH-4 MISSION 1041.9 10-23 MAY 1967 THIS EDITION OF THE OAK SUPPLEMENT FOR MISSION 1041 REPORTS ON THE MISSILE COMOR TARGETS NOT INCLUDED IN THE OAK REPORTS. AIRCRAFT AND NAVAL TARGETS ARE REPORTED IN TCS-80338, MILITARY TARGETS IN TCS-80339, AND ALL OTHER TARGETS IN TCS-80340,670 THIS REPORT ALSO CONTAINS NON-COMDR TARGETS REFLECTING SIGNIFICANT CHANGE, TARGETS WITH SIGNIFICANT ORDER OF BATTLE (08) INFORMATION, AND TARGETS WHICH ARE NEWLY IDENTIFIED OR KNOWN BUT REPORTED FOR THE FIRST TIME BY NPIC. TARGETS ARE ARRANGED BY SUBJECT AND WITHIN EACH SUBJECT BY COMOR TARGET NUMBER. PREVIOUSLY REPORTED NON-COMOR TARGETS ARE LISTED UNDER THE APPROPRIATE SUBJECT AFTER THE LISTING OF COMOR TARGETS. NEWLY REPORTED TARGETS ARE DESIGNATED AS BONUS TARGETS AND ARE LISTED AFTER THE NON-COMOR TARGETS. LOCATIONS OF TARGETS IN THIS REPORT ARE INDICATED BY THE COUNTRY CODE AND THE COORDINATES. SELECTED PHOTOGRAPHIC REFERENCES FOR EACH TARGET FOLLOW THE DESCRIPTION OF THE TARGET. PASS NUMBERS, SUFFIXED WITH A FOR ASCENDING AND D FOR DESCENDING, ARE LISTED FIRST, FOLLOWED BY THE FRAME NUMBERS. SYMBOLS FOR CONDITIONS AFFECTING INTERPRETABILITY ARE C (CLEAR), SC (SCATTERED CLOUD COVER), HC (HEAVY CLOUD COVER), H (HAZE), CS (CLOUD SHADOW), S (SNOW), O (OBLIQUITY), SD (SEMI- DARKNESS), D (DARKNESS), GC (GROUND COVER), CF (CAMOUFLAGE), GR (GROUND RESOLUTION), AND SS (SMALL SCALE). INTERPRETABILITY OF THE PHOTOGRAPHY IS CATEGORIZED AS G (GOOD), F (FAIR), OR P (POOR). THE EXTENT OF PHOTOGRAPHIC COVERAGE IS DENOTED BY THE SYMBOLS T (TOTAL) OR PT (PARTIAL). THE MODE OF COVERAGE IS INDICATED BY ST (STEREO), PS (PARTIAL STEREO), OR NS (NON-STEREO). RECIPIENTS ARE CAUTIONED THAT THE INITIAL SCAN OF PHOTOGRAPHY IS ACCOMPLISHED IN A SHORT TIME AND PRIOR TO FINAL REFINEMENT OF EPHEMERIS DATA. CONSEQUENTLY9 FUTURE ANALYSIS MAY RESULT IN ADDITIONAL INFORMATION. MOREOVER, RECIPIENTS ARE CAUTIONED THAT THE IDENTIFICATION OF TARGETS IS BASED PRIMARILY ON PHOTOGRAPHY AND DOES NOT CONSTITUTE A FINISHED INTELLIGENCE JUDGMENT. Handle Via Approved For ReleassdPO~~ lkjjrC ASS99 3 96R000100370001?.EHT-KEYHOLE Control System Only Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Highlights Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Handle Via Te agT. CIA- 99'T TALENT -KEYHApproved For Releas 0 396R000100370OOlf2S_80337167 Control System Only KH-4 MISSION 1041, 1E--?23 MAY 1967 HIGHLIGHTS 1. NINETEEN OF THE 24 DEPLOYED ICBM COMPLEXES ARE OBSERVED UN THIS MISSION. TYPE III{ SINGLE SILO LAUNCH SITES ARE NEWLY IDENTIFIED AT 4 OF THE COMPLEXES. ONE PROBABLE AND 2 CONFIRMED SITES ARE AT YEDROVOO SITE 72K AT GLADKAYA FILLS OUT LAUNCH GROUP K., PROBABLE SITES 33K, 34K, AND 374-43K AT KOSTROMA COMPLETE A THIRD GROUP DESIGNATED LAUNCH GROUP K. PROBABLE SITES 43J AND 44J AT KOZLLSK INDICATE THE START OF A FOURTH GROUP DESIGNATED LAUNCH GROUP J. 2. THE TYRATAM MISSILE TEST CENTER IS ENTIRELY COVERED ON CLEAR PHOTOGRAPHY. A RAIL BED IS UNDER CONSTRUCTION BETWEEN LAUNCH COMPLEXES A AND J., AN L-SHAPED ELECTRONIC FACILITY IS UNDER CONSTRUCTION AT SIT 13 AND THE SERVICE TOWER AT PAD B1 HAS BEEN RECONSTRUCTED. 3. THE ENTIRE SHUANG-CHENG-?TZU MISSILE TEST CENTER RANGEHEAD IS COVERED ON PHOTOGRAPHY OF GENERALLY FAIR INTERPRETABILITY. NEW CONSTRUCTION ACTIVITY AND 5 TENT CAMPS ARE OBSERVED AT SSM TRAINING SITE 3, APPROXI- MATELY 70 NM NORTH OF THE MAIN SUPPORT BASE. CONTINUED ACTIVITY AT THE GROUND TARGET MARKER CONSISTS OF A TRIANGULAR PATTERN OF POSSIBLE. RADAR REFLECTORS POSITIONED IMMEDIATELY EAST OF THE MARKER. 4. AT THE KALININ PROBABLE LONG RANGE SAM COMPLEX, LAUNCH ND DOLLIES TWO POSITIONS ARE OCCUPIED IN THE TRACKING GUIDANCE FACILITY. ALL CONSTRUCTION IN THE LAUNCH AREAS APPEARS COMPLETE. 5. CONSTRUCTION CONTINUES AT MOSKVA ABM LAUNCH COMPLEX E21. AT TRIAD 1, BUILDINGS A AND C ARE IN THE MID-STAGE OF CONSTRUCTION. BUILDING B IS IN AN EARLY STAGE. 6. A PROBABLE LONG RANGE SAM COMPLEX IS NEWLY IDENTIFIED AT THREE LOCATIONS IN THE USSR. A FACILITY UNDER CONSTRUCTION 19 NM SW OF KIYEV CONSISTS OF 3 LAUNCH SITES, TRACKING/GUIDANCE FACILITY, AND A SUPPORT AREA. A FACILITY IN AN EARLY STAGE OF CONSTRUCTION 5.5 NM NNW OF NEYA CONSISTS OF A TRACKING/GUIDANCE FACILITY, A SUPPORT AREA, AND A LAUNCH AREA MAIN ROAD. A FACILITY UNDER CONSTRUCTION 20 NM NE OF CHELYABINSK CONSISTS OF 3 LAUNCH SITES, A TRACKING/GUIDANCE FACILITY WITH 3 RADAR POSITIONS, A MISSILE-HANDLING FACILITY, AND A SUPPORT AREA. Handle Via Approved For Relea Z00~~,~( 7T c J~-RRP~9j 1396R000100370001AaHT-KEYHOLE ''Ilttll~~~~tt (. ESS K rr Control System Only Handle V -KEY ia TOP 1 T ~~ ~ ~~~F TALENT Syst% nrloved For Release 200 C 9 0139680001003700a 2 Coontntrol rol Systemr~y T5-$337!6? KH-4 MISSION 1041? 10-23 MAY 1967 7. MODIFICATION OR RENOVATION OF MISSILE-READY BUILDINGS IS UNDERWAY AT LAUNCH POSITIONS A-1, A-4, AND A-6 AND AT EACH LAUNCH POSITION AT SITES E3 AND C AT THE LENINGRAD SW PROBABLE LONG RANGE SAM COMPLEX. 8. CONSIDERABLE ACTIVITY CONTINUES AT SHAN-TAN SAM TRAINING AREAS A AND B IN CHINA. AN INCREASE OF 20-30 TENTS IS OBSERVED IN AREA B THIS SUPPLEMENT REPORTS ON 487 COMOR TARGETS AND 4 BONUS TARGETS. 4 Handle Via Approved For ReleasTOPO~E rRIIFCnfSS9 I~P96R00010037010ntro System Only Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Missiles Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Handle Via TO2 ff202FT: Cft RI I~~ TA,LEHT-KEYHIt% ~iproved For Release 0 J~ ~c P~tJ`'~ 1396R0001003700CVG%_6 0 337/67 Control System Only KH-4 MISSION 1:0410 10-23 MAY 1967 THE ENTIRE CENTER AND SEARCH AREA ARE COVERED ON PHOTOGRAPHY OF GOOD-TO-FAIR INTERPRETABILITY. HOWEVER, SCATTERED CLOUD COVER AND HAZE PRECLUDE DETAILED INTERPRETATION OF SOME PORTIONS OF THE COMPLEX. A NEW RAIL SPUR IS UNDER CONSTRUCTION TO THE LARGE NEW MISSILE ASSEMBLY BUILDING 13EHIND SITE 2. ACTIVITY BEHIND THE EAST PAD AT SITE 9 INDICATES THE POSSIBLE CONSTRUCTION OF A SECOND GANTRY. A POSSIBLE CRANE AND CONSTRUCTION MATERIAL ARE OBSERVED JUST EAST OF THE GANTRY RAILS? THERE IS ACTIVITY ON THE SOUTHERN PAD AT SITE 13. A NEW SINGLE SILO, DESIGNATED LAUNCH SITE 23, IS 25X1 D IDENTIFIED AT 63-OON 041-3:3E. I T CAN BE NEGATED 25X1D ND IS FIRST OBSERVED ON T NO OTHER SIGNIFICANT ACTIVITY DR MISSILE-ASSOCIATED FACILITIES OBSERVED IN CLOUD-FREE PORTIONS OF THE 50-NM SEARCH AREA. 25X1 D 25X1A Handle Via Approved For Relea 0g 3 T C1 fl IRO 96R00010037000j& T-KEYHOLE Control System Only 25X1 D Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Handle Via T9pF('2flrW- PR"~ 'rAI.EHT-KErAlpProved For Release b0 ~j~/ C F99 'f`d 96R00010037000I1A_80337/67 Control System Only KH-4 MISSION 1041, 10?-23 MAY 1967 25X1A FACILITY, THE RAIL--TO-ROAD TRANSFER POINT OVERED ON P SITE 2 CAN BE IDENTIFIED ONLY'. NO SIGNIF OBSERVED. NO NEW MISSILES OR MISSILE-RELATED ACTIVITY OBSERVED IN CLOUD-FREE PORTIONS OF THE WESTERN 50 PERCENT OF THE 50-NM SEARCH AREA. l Handle Via Approved For Relea dQO2/0e ff - CjAa ff W Q 00370001FAENT-Control KE cyst mYHOLE Only Haedle Via (gyp ('(~F7T('FCC ~I f F ~rALEHT-KEYAggproved For Releas19g021g21TCUix5 '99'IYJ 96R000100370001-2 Control System Only TCS-80337/67 KH-4 MISSION 1041,v 10-23 MAY 1967 25X1A SITE 9 IS THE ONLY COMPONENT OF THE COMPLEX OBSERVED AND IT CAN BE IDENTIFIED ONLY. NO NEW MISSILE-RELATED ACTIVITY OBSERVED IN CLOUD-FREE PORTIONS OF THE ENTIRE SEARCH AREA. NO NEW ICBM OR ABM/LONG RANGE SAM FACILITIES IDENTIFIED WITHIN THE PORTION OF THE '.50-NM SEARCH AREA COVERED ON PHOTOGRAPHY. ANALYSIS OF THE SERVICE TOWER AND SHADOW AT PAD A-1 ON DIFFERENT PASSES INDICATES A CONFIGURATION NOT PREVIOUSLY OBSERVED. THE PAD IS UNCHANGED BUT THE TOWER APPEARS TO HAVE LESS BULK THAN USUAL AND THE APPARENT SHADOW IS VERY SLENDER., THREE EXPLANATIONS OF THIS ARE CONSIDERED EQUALLY POSSIBLE -- THAT THIS IS AN ILLUSION CAUSED BY THE SMALL SCALE OF THE PHOTOGRAPHY, THAT THE MAJOR PORTION OF THE TOWER HAS BEEN RETRACTED DOWNWARD TO A POSITION NOT PREVIOUSLY OBSERVED, OR THAT THE SERVICE TOWER HAS BEEN MODIFIED. THE RECENTLY CONSTRUCTED LARGE BUILDING IN THE COMPLEX SUPPORT FACILITY IS NOW REFERRED TO AS THE SPACECRAFT FACILITY. A RAIL BED IS UNDER CONSTRUCTION CONNECTING THE SPACECRAFT FACILITY WITH THE GROUP OF BUILDINGS BEING CONSTRUCTED NE OF THE MAB AT COMPLEX J. AT LAUNCH PADS A2 AND A39 NO SIGNIFICANT CHANGE IS OBSERVED. 8 Handle Via Approved For Releajdrp2 C t~K9WU~~96R000100370001TR Y O E ~ System Only handle Via TOP ~IEOSA~TCfA- RU FF TALENT-KEY roved For Release 200 R 99 0 1396R00010037000~1 _60337,07 Control System my 25X1 D 25X1A 25X1 D 25X1 D SITE B1 ?-- WER HAS BEEN RECONSTRUCTED ON PAD B1. SEVERAL VEHICLES/PIECES OF EQUIPMENT ARE PARKED ON THE RAIL SPUR TO THE REAR OF THE PAD AND A LONG VEHICLE/PIECE OF EQUIPMENT IS TO THE REAR OF THE READY BUIL N THE OF THE EAST LEG OF THE RAIL WISHBONE. I LONG VEHICLE/PIECE OF EQUIPMENT AND AT LEAST 2 SMALLER, LIGHT-TONED VEHICLES/PIECES OF EQUIPMENT ARE ADJACENT TO THE PAD. SITE B2 -- SEVERAL SMALL VEHICLES/PIECES OF EQUIPMENT ARE WITHIN THE AREA. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D THE PREVIOUSLY REPORTED POSSIBLE RAIL SPUR UNDER CONSTRUCTION IN THE VICINITY OF PAD C2 CAN NOW BE CONFIRMED. AN UNDETERMINED NUMBER OF VEHICLES/PIECES OF EQUIPMENT IS IN THE SW CORNER OF THE LAUNCH AREA. 25X1 D 25X1 D .0 Handle Via Approved For ReleasTOPO / TC S9T6F 96R0001003700Cont System Y Only Handle Via TOP ~5M?~1 4~1~UFF TALENT-KEYJ proved For Release 200 C 9 01396R000100370001-22 Control System Only TLS-80337/67 KH-4 MISSION 1 41 , 10-23 MAY 1967 25X1A ONE LONG VEHICLE/PIECE OF EQUIPMENT AND 2 SHORT VEHICLES/PIECES OF EQUIPMILNT ARE NEAR THE El READY iim AND SEVERAL OTHERS ARE PARKED WITHIN THE NO NEW CONSTRUCTION, CHANGES IN FACILITIES, PREVIOUSLY UNREPORTED FEATURES OBSERVED NO NEW CONSTRUCTION CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TYURATAM LAUNCH COMPLEX G UR 4604N 06255E G1-G2 SEVERAL POSSIBLE RAIL CARS ARE NEAR THE SITE ?::NTRANCE. THE MISSILE/COMPONENT FREQUENTLY OBSERVED IS JUST FORWARD OF THE G1 READY BUILDING. DITCHING, POSSIBLY CONTAINING CONDUIT, HAS BEEN DUG FROM A POINT FORWARD OF G2-A TOWARD THE EAST FENCE LINE. GANTRIES ARE IN THEIR USUAL POSITION TO THE REAR OF THE PADS. G3-G4 -- GANTRIES ARE TO THE. REAR OF THE PADS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. G5--G6 -- SEVERAL LONG VEHICLES/PIECES OF EQUIPMENT ARE UN PAD G5 AND AT LEAST 1 IS ON PAD G6. AT LEAST 5 POSSIBLE LIGHT-TONED MISSILE COMPONENTS ARE ALONG THE SOUTH FENCE LINE. THE GANTRY IS AT THE END OF ITS TRACKS. REVETTED STORAGE AREA --- A BROAD AREA OF EARTH GRADING IS JUST WEST OF AND ADJACENT TO THE STORAGE AREA. A LONG RECTANGULAR BUILDING HAS BEEN CONSTRUCTED IN THE PREVIOUSLYREPORTED EXCAVATION WEST OF THE STEAMPLANT NORTH OF THE STORAGE AREA. I.n Handle Via Approved For ReleasT6f9Rk C S9 Ti3Ff96R000100370001T1LENT-KEYHOLE Control System Only I1ndle Via 1An SyYproved For Releasl`2b021g217 TC1A'R17~99'IVi 96R000100370001-2 Control ol System Only TCS-80337/67 I; KH-4 MISSION 1041, 10-23 MAY 1967 25X9 25X1 D COMPLEX SUPPORT FACILITY -- CONSTRUCTION CONTINUES IN THE NEW AREA OF ACTIVITY WEST OF THE ADMINISTRATION/HOUSING AND TECHNICAL SUPPORT AREA. 25X1A 25X1 D NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TYURATAM LAUNCH GROUP I (SITES 11-139 17) UR 4555N 76326E 25X1 D SITE 11 -- A POSSIBLE LONG VEHICLE P EC OF PM IS ON THE APRON NORTH OF THE SILO NO SIGNIFICANT CHANGE OBSERVED. SITE 12 -- ANOTHER SMALL, PROBABLE STRUCTURE HAS BEEN ADDED BETWEEN THE SILO EXCAVATION AND THE RECTANGULAR BUILDING AT TO?If SITE ENTRANCE. NO SIGNS OF SILO HEADWORKS ARE OBSERVED. 25X1D SITE 13 -- PART 3 OF THE OAK SUPPLEMENT CABLE ERRONEOUSLY REPORTED AN L---SHAPED ELECTRONIC FACILITY UNDER CONSTRUCTION. SILO HEADWORKS ARE STILL NOT OBSERVED. A POSSIBLE STRUCTURE IS LOCATED AT THE EDGE OF THE EXCAVATION, SE OF THE CORING. SITE 17 THE SOUTH SILO APPEARS TO BE PARTIALLY BACKF ILLED. 25X1 D 11 Handle Via Approved For Releas~ 0 p,~~,C1gL Control H@?~9~TQ~?96R000100370001f sy System -KEYHOLE only Handle Via TALENT.KEYHAmproved For ReleaIP20Q tU7/'1'YT CI AY01396R00010037000Ir2c_or 21--, Control System Only KH-4 MISSION 1043., 10-23 MAY 1967 25X1A TYURATAM LAUNCH GROUP I (SITES 15, 16) UR 4559N 06333E SITE 16 -- A RECTANGULAR :IMAGE, POSSIBLY DITCHES OR FOOTINGS, IS OBSERVED IN THE BOTTOM OF THE SILO EXCAVATION. A STRUCTURE IS UNDER CONSTRUCTION BETWEEN THE SILO EXCAVATION AND THE BUILDING AT THE SITE ENTRANCE. DITCHING EXTENDS GENERALLY EASTWARD FOR A SHORT DISTANCE. SIMILAR CONSTRUCTION HAS RECENTLY BEEN OBSERVED AT SITES 12, 13, AND 1.7. SIDES OF THE ERECTOR/SERVICE TOWER FORWARD OF PAD J1 ARE BEING CONSTRUCTED UPWARD, PARTICULARLY ON THE SIDE PRESENTLY FARTHEST FROM THE PAD. THE NEARLY SQUARE BUILDING FORWARD OF PAD J2 NOW HAS A LOW CIRCULAR STRUCTURE ON TOP OF IT. TWO BUILDINGS ARE UNDER CONSTRUCTION IN THE PREVIOUSLY REPORTED LARGE EXCAVATIONS LOCATED SE OF PAD J2 AND OFF THE END OF THE ARCUATE CONDUIT FORWARD OF J2. AN EXCAVATION HAS BEEN DUG NE OF PAD JI JUST INSIDE THE FORWARD FENCE LINE. .THREE BLOCK-LIKE STRUCTURES, SIMILAR TO THOSE AT PAD J1, HAVE BEEN CONSTRUCTED ON TOP OF THE BLAST DEFLECTOR AT PAD J2, ONE ON EACH SIDE OF THE NW FLUME AND ONE ON THE SOUTH SIDE OF THE NE FLUME. CONSTRUCTION CONTINUES ON THE NEW BUILDINGS LOCATED BETWEEN THE MAB AND THE LAUNCH AREA. THE NEW ROAD SERVING THIS AREA NOW JOINS THE ROAD TO THE LAUNCH AREA AND A DITCH HAS BEEN DUG GENERALLY PARALLEL TO THIS NEW ROAD WHICH PROBABLY WILL .PROVIDE UTILITIES TO THE AREA 12 ~2~(~7 ~.I ~9 ~3 Handle Via Approved For Releatb~00~2 Q CT IA~l~CJJPKjQ11 96R00010037000TIMaHT-KEYHOLE ''II ~t Control System Only Handle Via TOP ~rT:-9~ H TALENT andle -KEYHpI{bproved For Release 0 3968000100370001-2 Control System Only TCS?80337/67 KH-4 MISSION 1041, 10?23 MAY 1967 OF CONSTRUCTION. A RAIL BED IS UNDER CONSTRUCTION CONNECTING THIS AREA OF CONSTRUCTION WITH THE NEW LARGE BUILDING, NOW REFERRED TO AS THE SPACECRAFT FACILITY, AT COMPLEX A. A RAIL SPUR HAS ALSO BEEN CONSTRUCTED ALONG THE WEST SIDE OF THE: MAB, CONNECTING THE RAILS ON THE GANTRY TRACK FOUNDATIONS WITH A WYE SOUTH OF THE MAB. THE LAST OF THE MULTISTORY MASONRY BUILDINGS UNDER CONSTRUCTION IN THE ADMINISTRATION/HOUSING AND TECHNICAL SUPPORT AREA APPEARS COMPLETE. THE PROBABLE CONTROL BUILDING NORTH OF THE MAB HAS BEEN BACKFILLED AND EARTH MOUNDED. 25X1A TYURATAM LAUNCH GROUP K (SITE K.1-K2) UR 4601N 06303E AT LEAST 6 VEHICLES/PIECES, OF EQUIPMENT ARE IN THE VICINITY OF SITE K2. NO NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TYURATAM LAUNCH GROUP K (SITE K3) UR 4604N 06256E SEVERAL SMALL VEHICLES/PIECES OF EQUIPMENT ARE PARKED AT VARIOUS POINTS ALONG THE SOUTH FENCE LINE. THE APRON IN THE VICINITY OF THE SILO HAS A CLUTTERED, POSSIBLY DISRUPTED APPEARANCE. 13 Handle Via Approved For Releay0 0QA: to 4 PJpp396R00010037000Tf$HT-KEYHOLE Control System Only Handle Via TALENT KEYA 1proved For Releasig0021tr2/7`7`TCTft'Fg~999`0~t96R000100370001 TES-88337/6'T Control System Only KH-4 MISSION 1041, 10-23 MAY 1967 25X1A A VEHICLE/PIECE OF EQUIPMENT IS LOCATED ON THE APRON NEAR THE SILO AT SITES L2, L3, L7, L8, AND L9. NO SIGNIFICANT CHANGE IS OBSERVED AT ANY OTHER SITE IN LAUNCH GROUP L. 25X1A CONSTRUCTION CONTINUES ON THE SILO HEADWORKS, WHICH NOW APPEAR TO HAVE A LENGTH/WIDTH RATIO CONSIDERABLY HIGHER THAN THE 65 X 60-FT DIMENSIONS REPORTED PREVIOUSLY. THE HEADWORKS NOW APPEARS TO HAVE 3 SECTIONS OR COMPARTMENTS APPROXIMATELY EQUAL IN SIZE. NO OTHER .14 Handle Via Approved For Releas?dfP~ttkItC}49f~19WQO?96R00010037000NT- EY OL etrof System Only Handle Via ru p~ ~~ TALENT-KEytroved For Releasl O~ArYP2p~~TCFA'-kg9JT-U1;96R000100370001-2 Control System Only TC 5-80337167 KH-4 MISSION 10419 10--23 MAY 1967 25X1A TYURATAM LAUNCH GROUP M (SITE M2) UR 460ON 06301E SILO HEADWORKS9 SIMILAR TO THOSE AT SITE M1, ARE UNDER CONSTRUCTION IN THE SILO EXCAVATION AND A SITE ACCESS ROAD HAS BEEN CONSTRUCTED WHICH RESEMBLES A TYPICAL T-SHAPED TYPE IIID ACCESS ROAD. THE NEWLY CONSTRUCTED ROAD WHICH BY-PASSES THE SITE HAS BEEN EXTENDED A SHORT DISTANCE, BUT NO SIGNIFICANT NEW CONSTRUCTION ACTIVITY IS OBSERVED NEAR ITS PRESENT TERMINUS. THE POSSIBLE SILO HEADWORKS PREVIOUSLY REPORTED UNDER CONSTRUCTION CAN NOW BE CONFIRMED. TYURATAM LAUNCH GROUP N (SITE Ni) UR 4602N 06303E NO MISSILES9 MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TYURATAM LAUNCH GROUP N (SITE N2-N3) UR 4604N 06257E NO MISSILES9 MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED.. 15 Handle Via Approved For Releasp~ ?9/ 7 tCjL~-,F S~9!,TdfP6R00010037000ntr System only Handle Via lDPOU2F&I T &N&%cJiYf~?396R000100370001 T,ALEHT-KEy~proved For Relea TES-80337/67 Control System Only KH-4 MISSION 1041, 10-23 MAY 1967 25X1A ALL 6 LAUNCH SITES, THE COMPLEX SUPPORT FACILITY, AND THE RAIL-TO-ROAD TRANSFER POINT ARE OBSERVED. POSSIBLE VEHICULAR ACTIVITY IS OBSERVED ON THE LEFT PAD AND ON LAUNCH SITE 4. NO OTHER INEW MISSILES OR MISSILE-ASSOCIATED ACTIVITY OBSERVED IN THE CLOUD-FREE PORTIONS OF THE WESTERN TWO-THIRDS OF THE 50-NM SEARCH AREA. Handle Via Approved For Releases-2~00~/D~12.7T ClA-~E~,L~PVUQ.'1,396R000100370001 Control aNT.KEY Only Handle Via SP? O~i rT (~i~i-T~[.71F'~ TALENT-KEYIIAI~Bproved For Relea 0 3968000100370001-2 Control System Only TCS-80337/67 KH-4 MISSION 1041, 10-23 MAY 1.967 25X1A SVOBODNYY ICBM COMPLEX UR 5146N 12806E NO NEW MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED IN THE SOUTHERN 10 PERCENT OF: THE 50-NM SEARCH AREA COVERED ON CLOUD-FREE PHOTOGRAPHY. THE ENTIRE ICBM COMPLEX IS CLOUD COVERED. DROVYANAYA ICBM COMPLEX UR 5131N 11300E A TYPE I1ID SITE, DESIGNATED SITE 59K, IS NEWLY IDENTIFIED AT 51-27N 113-24E. THE SITE IS FIRST SEEN AND CAN BE NEGATED ON IT IS IN THE MID-STAGE OF UCTION. THE ENTIRE SEARCH AREA IS COVERED ON PHOTOGRAPHY. NO OTHER NEW MISSILE FACILITIES ARE OBSERVED. ALL 51 TYPE IIID LAUNCH SITES, THE 6 SS-? LAUNCH SITES, THE COMPLEX SUPPORT FACILITY, AND THE RAIL-TO-ROAD TRANSFER POINT ARE INTERPRETABLE. NO SIGNIFICANT ACTIVITY OBSERVED. CONSTRUCTION STATUS AND DETAILED DATA FOR INTERPRETABLE TYPE IIID LAUNCH SITES ARE AS FOLLOWS -- LAUNCH GROUP G -- ALL 10 SITES (7-14, 169 AND 18) ARE COMPLETE AND INTERPRETABLE. LAUNCH GROUP H ALL 10 SITES (15, 19-269 AND 28) ARE COMPLETE AND INTERPRETABLE. LAUNCH GROUP I -- EIGHT OF THE 10 SITES (29-34, 37, AND 40) ARE COMPLETE. SITES 35 AND 36 ARE IN A LATE STAGE OF CONSTRUCTION. LAUNCH GROUP J -- SITES 389 39, 43, 44, 47, AND 50 ARE IN A LATE STAGE OF CONSTRUCTION. SITES 42, 45, 46, AND 48 ARE IN THE MID-STAGE OF CONSTRUCTION. LAUNCH GROUP K -- ALL SITES 149 AND 51-59) ARE IN THE MID-STAGE OF CONSTRUCTION.. PROBABLE SITE 58 CAN NOW BE CONFIRMED. TRANSFER POINT SITE -- SITE 41X IS IN A LATE STAGE OF CONSTRUCTION. 17 Handle Via Approved For ReleIV 02L0?~(,271 GLq,QP Ta1396R00010037000TNt2HT-KEYHOLE JJttllf~~tt [,I1CJJ Control System Only Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Next 1 Page(s) In Document Exempt Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Handle Via P S CRE CHESS R~ F TALENT-KEY,f~roved For Release 00~/~27~T CfA=F~DP99TD1'396R00010037000?S-80337/61 Control System Only KH-4 MISSION 1041.9 10-23 MAY 1967 25X1 D 25X1A 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D KOSTROMA ICBM COMPLEX UR 5746N 04101E SEVEN SS-7 LAUNCH SITES (SITES 1-7), 30 TYPE IIID LAUNCH SITES (INCLUDING 9 PROBABLE NEWLY IDENTIFIED SITES), THE COMPLEX SUPPORT FACILITY, AND THE RAIL-TO-ROAD TRANSFER POINT ARE INTERPRETABLE. THE PROBABLE NEWLY IDENTIFIED TYPE IIID LAUNCH SITES ARE -- SITE 33 AT 57-47N 041-24E,, SITE 34 AT 57-44N 041-12E, SITE 37 AT 57-40N 041-03E,r PROBABLE CONTROL SITE 38 AT 57-39N 041-10E, SITE 39 AT 57--38N 041-17E, SITE 40 AT 57-36N 041-26E, SITE 41 All 57-35N 041-10E, SITE 42 AT 57-32N 041-11E, AND SITE 43 AT 57-32N 041-17E. SITES 41, AND 43 CAN ALL BE NEGATED ND WERE FIRST SEEN BE NEGATED AND SITE 42 CAN BE AND IS FIRST SEEN SITES 33 AND 34 ARE IN THE - THE STAGES OF CONSTRUCTION OF SITES 37-43 ARE UNDETERMINED. NO OTHER SIGNIFICANT ACTIVITY IS OBSERVED. CONSTRUCTION STATUS AND DETAILED DATA FOR INTERPRETABLE TYPE IIID LAUNCH SITES ARE AS FOLLOWS -- Handle Via Approved For ReleasT ff Rf j&:TCbfg~y ffT_ 6R00010037000112EEH I -KEYHOLE Control System Only Handle Via PZ 0~1 & c . J Y07 TALENT-KEYH~Aipproved For ReleaS 0 3968000100370001-2 Control System Only TCS-80337/67 KH-4 MISSION 104.11 10-23 MAY 1967 LAUNCH GROUP I -- ALL 10 SITES ARE INTERPRETABLE. SITES 9, 10, 21-24, 269 30, AND 31 ARE ALL IN LATE STAGES OF CONSTRUCTION. SITE 33 IS IN THE MID-STAGE OF CONSTRUCTION. LAUNCH GROUP J -- ALL 10 SITES ARE INTERPRETABLE. SITES 12-19, 289 AND 32 ARE ALL IN THE MID-STAGE OF CONSTRUCTION. LAUNCH GROUP K -- ALL 10 SITES ARE INTERPRETABLE. SITES 34-36 ARE IN THE MID-STAGE OF CONSTRUCTION. PROBABLE SITES 37-43 ARE IN UNDETERMINED STAGES OF CONSTRUCTION. 21 Handle Via Approved For Relea 0g T Tf[L 9JjQj 96R000100370001stENT-KEYHO1E TW RE 1~"JJ Control System Only Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Next 1 Page(s) In Document Exempt Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Handle Via PZ , T ('u ~d 4gf Tn~I.EHT-KErHli~pproved For ReleaI0 396R00010037000"5_80337/67- Control System Only KH--4 MISSION 1041.9 10-23 MAY 1967 25X1A THE ENTIRE SEARCH AREA IS COVERED ON PHOTOGRAPHY. NO NEW MISSILES OR MISSILE-ASSOCIATED ACTIVITY OBSERVED IN CLOUD-FREE AREAS. ALL 3 LAUNCH AREAS, THE RAIL-TO-ROAD TRANSFER POINT, AND THE COMPLEX SUPPORT FACILITY ARE INTERPRETABLE. NO SIGNIFICANT ACTIVITY OBSERVED. Handle Via Approved For Relea =112M 7T: c A,E;gPE9,T?1,396R00010037000IMaNT-KEYHOLE tt'' ))~~tt((,,Il~E Control System Only Handle Via TOP SECRET CHESS RUFF TALENT-KEYHA oved For Release 2002/02/27 : CIA-RDP99TO1396R0001003700011 22 Control System my TCS-80337/67 KH-4 MISSION 1041, 10-23 MAY 1967 25X1A SHA DRINSK ICBM COMPLEX UR 5607N 06339E THE ENTIRE SEARCH AREA IS COVERED ON PHOTOGRAPHY WITH SCATTERED-TO-HEAVY CLOUD COVER. HOWEVER, THE COMPLEX IS NOT OBSERVED. NO NEW MISSILE FACILITIES OBSERVED. ALL COMPONENTS OF THE COMPLEX ARE COVERED ON PHOTOGRAPHY. NO SIGNIFICANT ACTIVITY OBSERVED AT THE COMPLEX SUPPORT FACILITY OR THE RAIL-TO-ROAD TRANSFER POINT. NO NEW MISSILE FACILITIES OBSERVED IN CLOUD-FREE PORTIONS OF THE: SEARCH AREA,. THE 41 KNOWN TYPE IIID LAUNCH SITES, 5 TYPE II LAUNCH SITES, 1 TYPE IIIA LAUNCH SITE, THE COMPLEX SUPPORT FACILITY, AND THE RAIL-TO--ROAD TRANSFER POINT ARE OBSERVED. NO SIGNIFICANT ACTIVITY OBSERVED. CONSTRUCTION STATUS AND DETAILED DATA FOR INTERPRETABLE TYPE IIID LAUNCH SITES -- LAUNCH GROUP G -- ALL 10 SITES (7,11-13,15,18-20,23, AND 35) ARE COMPLETE AND INTERPRETABLE. LAUNCH GROUP H -- ALL 10 SITES (29-34,36,40,42, AND 59) ARE COMPLETE AND INTERPRETABLE. LAUNCH GROUP J -- ALL 10 SITES (45-49,51,52,57,58, AND 61) ARE COMPLETE AND INTERPRETABLE. LAUNCH GROUP I -- NINE OF THE 10 SITES ARE COMPLETE. NINE SITES (8,10,16,17,22,25,38,41, AND 43) ARE 2'.5 Handle Via Approved For Relea 0 c ft396R00010037000i4 NT-KEYHOLE Contr. System Only Handle Via TOP SECRET CHESS RUFF T KEVH ?~.oved For Release 2002/02/27 : CIA-RDP99TO1396R00010037000t-$-80337/67 Control rol System n y KH-4 MISSION 1041. a 10-23 MAY 1967 COMPLETE AND INTERPRETABLE. SITE 39 WAS IN A LATE STAGE OF CONSTRUCTION. ITS CURRENT CONSTRUCTION STATUS IS UNDETERMINED. NO NEW MISSILES OR MISSILE-RELATED ACTIVITY OBSERVED IN CLOUD-FREE PORTIONS OF THE 50-NM SEARCH AREA. 25X1 D 26 Handle Via G7TCf TFf396R00010037000TIA I NT-KEYHOLE Approved For ReleaTf)f00qftW Control System Only Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Next 1 Page(s) In Document Exempt Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Handle Via TOP ~SF~ T. TALENT- KEYHroved For Release 0 !PIff396ROOO 100370 00 Control System Opnly TLS-80337/6'f KH-4 MISSION 1041, 10-23 MAY 1967 25X1A THE 6 KNOWN TYPE II LAUNCH SITES, THE COMPLEX SUPPORT FACILITY, THE RAIL-TO-ROAD TRANSFER POINT, AND THE HARDENED COMMUNICATION FACILITY ARE OBSERVED. NO SIGNIFICANT ACTIVITY IS OBSERVED. NO NEW MISSILES OR MISSILE-RELATED ACTIVITY OBSERVED IN CLOUD-FREE PORTIONS OF THE 50-NM SEARCH AREA. 29 Handle Via Approved For Relea 0W T Q I-t 9RT r96R00010037000JAYNT-KEYHOLE Control System Only Handle Via TOP c PrT. - ' t'4 TAIEHT-KEYHA Pproved For Release 0 396800010037000 fE S-80337/6't Control System Only KH-4 MISSION 1041, 10-23 MAY 1967 25X1A THE WESTERN ONE-THIRD OF THE SEARCH AREA IS COVERED ON PHOTOGRAPHY. NO NEW MISSILE FACILITIES ARE OBSERVED IN CLOUD-FREE AREAS. SS-7 LAUNCH SITES AD TRANSFER POINT ARE INTERPRETABLE. THIS THE COMP X UPP R TOTAL INCLUDES SITES 39-44, NEWLY IDENTIFIED ON THIS MISSION, AND 11 SITES (45--55) NEWLY IDENTIFIED ON HESS 17 NEW SITES CONFIRM THE 4 TYPE IIID LAUNCH GROUPS AT YEDROVO ICBM COMPLEX. THE 6 NEW SITES IDENTIFIED ON THIS MISSION, SITE 39 AT 57-52N 033-52E, SITE 40 AT 57-50N 033-54E, SITE 41 AT 57-47N 033-52E, SITE 42 AT 57-51N 034-08E, SITE 43 AT 57-47N 034-08E, AND SITE 44 AT 57-44N 033-58E, ARE ALL IN LAUNCH GROUP L, AND IN UNDETERMINED STAGES OF CONSTRUCTION. ALL CAN BE NEGATED AND ARE FIRST SEEN ^ -COMPLEX. NO OTHER NEW 0 SIGNIFICANT ACTIVITY IS MISSILE FACILITIES ARE OBSERVED IN THE INTERPRETABLE PORTIONS OF THE 50-NM SEARCH AREA. CONSTRUCTION STATUS AND DETAILED DATA FOR TYPE IIID LAUNCH SITES ARE AS FOLLOWS -- LAUNCH GROUP I -- ALL 10 :SITES ARE IN UNDETERMINED STAGES OF CONSTRUCTION. AS REPORTED IN THE OAK FOR THE L-SHAPED ELECTRONIC FACILITY AT SITE D. LAUNCH GROUP J -- 9 SITES (279 28, AND 30-36) ARE IN UNDETERMINED STAGES OF CONSTRUCTION. THE LACK OF PROGRESS ON THE L-SHAPED ELECTRONIC FACILITY AT CONTROL SITE 27 INDICATES THAT THE L WILL: NOT BE COMPLETED, ALTHOUGH THE CONTROL BUNKER IS VISIBLE. THE APPARENT ABANDONMENT OF THIS L PARALLELS THE SITUATION AT SITE 11, AND AT OTHER SINGLE SILO COMPLEXES (OLOVYANNAYA SITES 55 AND 60 AND IMENI GASTELLO SITE 17). 3 , Handle Via Approved For Releatbip~~lg7r~grFP9~Tp~396R00010037000TMtZHT-KEYHOLE //``~:ll..r~E~,CC 1IlICEJJJJ UUrrrr Control System Only Handle Via TALENT.KEY)Ikproved For Relealdq00'29/2YT 06QP9'9 396R000100370001-2 Control System Only TCS-80337/6.1 KH?4 MISSION 1041, 10-23 MAY 1967 BEEN IDENTIFIED, THEY ARE ALL IN UNDETERMINED STAGES OF CONSTRUCTION. LAUNCH GROUP L -- ALL 10 SITES ARE IN AN UNDETERMINED STAGES OF CONSTRUCTION. TRANSFER POINT SITE -- POSSIBLE SITE 55X IS IN AN UNDETERMINED STAGE OF CONSTRUCTION. Handle Via Approved For ReleaST&P Q 3, ST Qf f96R00010037000ntr~ol System O.ly Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Next 1 Page(s) In Document Exempt Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Handle Via P 0`' rA (.'TA --RL71'99Tt TALENT-KEYHi~proved For Relea 0 396R00010037000t.L25_80337/67 Control System Only KH-4 MISSION 10419 10--23 MAY 11967 25X1A THE 61 TYPE IIID LAUNCH SITES, THE 3 SS-7 LAUNCH SITES, THE COMPLEX SUPPORT FACILITY, AND THE RAIL-TO-ROAD TRANSFER POINT ARE INTERPRETABLE. THIS TOTAL INCLUDES 1 NEWLY IDENTIFIED TYPE IIID LAUNCH SITE, DESIGNATED 72K, AT 56-36N 092-59E, WHICH IS CONFIRMED AND IN A LATE STAGE OF CONSTRUCTION. IT CAN BE NEGAT AND IS FIRST SEE NCH SITES IN LAUNCH GROUPS I AND . POSSIBLE LAUNCH SITES 664 69, AND 71 AND PROBABLE LAUNCH SITE 70 ARE NOW CONFIRMED. DETAILED DATA AND CONSTRUCTION STATUS FOR TYPE IIID LAUNCH SITES ARE AS FOLLOWS -- LAUNCH GROUP F -- ALL SITES ARE COMPLETE. NO SIGNIFICANT ACTIVITY OBSERVED. LAUNCH GROUP G -- ALL SITES ARE COMPLETE. NO SIGNIFICANT ACTIVITY OBSERVED. LAUNCH GROUP H -- ALL SITES ARE COMPLETE. NO SIGNIFICANT ACTIVITY OBSERVED. LAUNCH GROUP I -- ALL SITES ARE NOW COMPLETE. NO SIGNIFICANT ACTIVITY OBSERVED. LAUNCH GROUP J -- ALL SITES ARE NOW COMPLETE. NO SIGNIFICANT ACTIVITY OBSERVED. LAUNCH GROUP K -- EIGHT SITES ARE NOW IN A LATE STAGE OF CONSTRUCTION. SITE 60 IS IN AN UNDETERMINED STAGE AND SITE 63 IS IN THE MID-STAGE OF CONSTRUCTION. LAUNCH SITE 59X IS IN AN UNDETERMINED STAGE OF CONSTRUCTION. Handle Via Approved For Relea 2p421q2~27T CJAJ QP$9 j 396R00010037000NaNT-KEYHOLE CC ))~~~=ll..~~tt CHESS I(U Control System Only Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Next 1 Page(s) In Document Exempt Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Handle Via TALENT ('QF'lT: AE-&~ ~Fg`~'~ -KErHApproved For Relea~(~~ ~~ii OcFA"~/~)~]'~AZQP 396R0001003700~t-J_60337167 Control System Only 25X1A TWENTY-EIGHT OF THE 43 KNOWN SITES, THE COMPLEX SUPPORT FACILITY9 AND THE RAIL-TO-ROAD TRANSFER POINT ARE INTERPRETABLE. NO NEW MISSILE OR ABM/PROBABLE LONG RANGE SAM FACILITIES ARE OBSERVED IN THE SOUTHERN 75 PERCENT OF THE SEARCH AREA COVERED ON PHOTOGRAPHY. NO SIGNIFICANT ACTIVITY OBSERVED. INTERPRETABLE. LAUNCH GROUP B INTERPRETABLE. LAUNCH GROUP C THREE SITES 112, 13, AND 15) ARE INTERPRETABLE. LAUNCH GROUP D -- SITE 21 IS IN A LATE STAGE OF CONSTRUCTION. SITES 20 AND 22 ARE IN AN UNDETERMINED STAGE OF CONSTRUCTION. LAUNCH GROUP E -- SITES 26? 28, 29, 30, AND 31 ARE IN THE MID-STAGE OF CONSTRUCTION. 37 Handle Via Approved For Release 2002/02/27: CIA-RDP99T01396R00010037000jkLaNT-KEYHOLE TOP SECRET CHESS RUFF Control System Only Handle Via TALENT-KI:yHfipproved For ReleaIP OWRIT: 6f4W994Ef396R000100370001-2 Centro) System Only TCS-80337/67 KH-4 MISSION 104I., 10-23 MAY :1967 LAUNCH GROUP F -- SITE 34 IS IN THE MID-STAGE OF CONSTRUCTION. SITE 36 IS IN AN EARLY STAGE OF CONSTRUCTION. LAUNCH GROUP G -- SITES 36, 40, AND 41 ARE IN AN EARLY STAGE OF CONSTRUCTION. SITE 42 IS IN THE MID-STAGE OF CONSTRUCTION. TRANSFER POINT SITE -- SITE 19X IS IN THE MID-STAGE OF CONSTRUCTION. 313 Handle Via Approved For Relear, 00??eL2,7T COQ-ff~9k jQ 396R000100370001 oINT-K System Only Handle Via p F('R~ ('~FC~ (~'IFF 1rAEEHT.KEYfgbproved For Releass9b0~b'21~''l'~rCIJ~' P'99'I'b'I396R000100370001-2 Control System Only T C S- 8 0 3 3 7/ 6 7 KH-4 MISSION 1041, 10-23 MAY 1967 25X1A NOVOSIBIRSK ICBM COMPLEX UR 5515N 08259E THE COMPLEX IS CLOUD COVERED OR NOT COVERED. NO NEW MISSILES OR MISSILE-RELATED ACTIVITY OBSERVED IN CLOUD-FREE PORTIONS OF THE WESTERN ONE-THIRD OF THE 50-NM SEARCH AREA. KOZELSK ICBM COMPLEX UR 5356N 03549E THIRTY-THREE KNOWN TYPE HID LAUNCH SITES, ALL 5 SS-8 LAUNCH SITES, THE COMPLEX SUPPORT FACILITY, AND THE RAIL-TO-ROAD TRANSFER POINT ARE INTERPRETABLE. THIS INCLUDES 2 NEWLY IDENTIFIED TYPE IIID SITES, 43J AT 54-03N 035-45E AND 44J AT 54-?09N 035-47E. BOTH SITE ARE FIRST SEEN ON THIS MISSION AND CAN BE NEGATED HEY ARE IN EARLY STAGES O "PF"WERWIS NOT CONSIDERED A VALID SITE AND IS DELETED FROM NPIC LISTINGS. NO OTHER SIGNIFICANT ACTIVITY OBSERVED. CONSTRUCTION STATUS AND DETAILED DATA FOR TYPE IIID LAUNCH SITES UNDER CONSTRUCTION -- 39 Handle Via Approved For Releases FP R %A I Co -2 0 212ZTC&-t~g9~TQ?396R0001003700011-ro~l System Only Haedle Via P $ [RE [HES$ ~(JFF TALENT-KEYAgj roved For Release~00Z/~272TTCfARIII799TD'1396R000100370001f2S-80337/67 Control System Only KH-4 MISSION 1041, 10-23 MAY 1967 LAUNCH GROUP G -- ALL 10 SITES ARE INTERPRETABLE. SITES 7, 8, 10-12, 259 AND 26 ARE IN LATE STAGES OF CONSTRUCTION. SITES 99 22, AND 23 ARE IN THE MID-STAGE OF CONSTRUCTION. LAUNCH GROUP H -- ALL 10 SITES ARE INTERPRETABLE. SITES 28 AND 29 ARE IN LATE STAGES OF CONSTRUCTION AND SITES 15-209 30, AND 39 ARE IN THE MID-STAGE OF CONSTRUCTION. LAUNCH GROUP I -- NINE OF THE 10 SITES ARE INTERPRETABLE. SITES 32-35, 37, 38, 40, 41, AND 45 ARE IN THE MID-STAGE OF CONSTRUCTION. SITE 36 CAN BE IDENTIFIED ONLY. LAUNCH GROUP J -- LAUNCH SITES 43 AND 44 APPEAR TO BE IN EARLY STAGES OF CONSTRUCTION AND SITE 47 IS IN THE MID-STAGE OF CONSTRUCTION. 40 Handle Via Approved For Releastdfp~t$kItCIA..tpg99pO?96R00010037000T Y LE Control System On Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Next 1 Page(s) In Document Exempt Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Handle Via TOP SECRET CHESS RUFF TALENT-KEYHR~ roved For Release 2002/02/27 : CIA-RDP99T01396R000100370001 Control System Opnly I-eS-8t337/b7 25X1A ALL 81 TYPE 1110 LAUNCH SITES, THE 3 TYPE IIIA LAUNCH SITES, THE COMPLEX SUPPORT FACILITY, AND THE RAIL-TO-ROAD TRANSFER POINT ARE INTERPRETABLE. A MODERATELY LOW LEVEL OF ACTIVITY IS OBSERVED AT THE COMPLEX SUPPORT FACILITY. NO SIGNIFICANT ACTIVITY IS OBSERVED AT THE TYPE IIIA LAUNCH SITES (1-3) OR THE TRANSFER POINT SITE. NO NEW MISSILE-RELATED ACTIVITY OBSERVED IN CLOUD-FREE PORTIONS OF THE ENTIRE SEARCH AREA. CONSTRUCTION STATUS AND DETAILED DATA FOR TYPE IIID LAUNCH SITES -- LAUNCH GROUP D -- ALL 10 SITES (4-13) ARE COVERED. NO SIGNIFICANT ACTIVITY OBSERVED. LAUNCH GROUP E -- ALL 10 SITES (14-23) ARE COVERED. NO SIGNIFICANT ACTIVITY OBSERVED. LAUNCH GROUP F -- ALL 10 SITES (35-44) ARE COVERED. LAUNCH SITES 37,399 AND 41 ARE NOW COMPLETE, BRINGING TO 8 THE NUMBER OF SITES COMPLETE IN THIS GROUP. SITES 43 AND 44 ARE IN LATE STAGES OF CONSTRUCTION. LAUNCH GROUP G -- ALL 10 SITES (25-34) ARE COVERED. NO SIGNIFICANT ACTIVITY OBSERVED. LAUNCH GROUP H -- ALL 10 SITES (45-52, 57, AND 58) ARE COVERED. LAUNCH SITE 49 IS NOW COMPLETE AND SITE 46 WAS PREVIOUSLY REPORTED AS COMPLETE. THE OTHER 8 SITES ARE IN LATE STAGES OF CONSTRUCTION. LAUNCH GROUP I -- ALL 10 SITES (55956,59,78, AND 81-86) ARE COVERED. SITE 55 IS NOW COMPLETE. HOWEVER, CONSTRUCTION CONTINUES ON THE CONTROL FACILITY. SITES 56, 59, 78, 81, 829 AND 84 ARE IN LATE STAGES OF CONSTRUCTION. SITES 839 85, AND 86 ARE IN THE MID-STAGE OF CONSTRUCTION. 43 Handle Via Approved For Relea c T . TAfff SRO 96R000100370C00~& 1NT-KEYHOLE ontra System Only Handle Via ftroved For Release~DOZ/~2/2TTCfi4=RDP99TOF 96R000100370001-2 Control System Only TCS-80337167' KH-4 MISSION 10419 10-23 MAY 1967 LAUNCH GROUP J -- ALL 10 SITES (60-62, 64, 65, AND 73-77) ARE COVERED. SITE 65 IS IN THE LATE STAGE OF CONSTRUCTION AND THE OTHER, 9 ARE IN THE MID-STAGE OF CONSTRUCTION. LAUNCH GROUP K -- ALL 10 SITES (63, 66-72, 79, AND 80) ARE COVERED, SITES 63 (NOW CONFIRMED AS THE CONTROL SITE) AND 71 ARE IN THE LATE STAGE OF CONSTRUCTION. THE OTHER 8 SITES ARE IN THE MID-STAGE OF CONSTRUCTION. TRANSFER POINT SITE -- SITE 24X IS IN THE MID-STAGE OF CONSTRUCTION. 44 g~'pa~g Handle Via Approved For Releas 6 ~0 f ~~C~ TCU rr_ 6R000100370001 1,4EHT-KEYHOLE Control System only Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Next 2 Page(s) In Document Exempt Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Handle Via 290 z_'7 19.r ruCCC ~~ rpLENT-KEYlll~roved For Releas 0 C 968000100370001-2 Control System Only TCS-80337/67 KH-4 MISSION 1041n 10-23 MAY 1967 25X1A ZHANGIZ-TOBE ICBM COMPLEX UR 4912N 08109E TEN OF THE KNOWN 25 TYPE IIIC LAUNCH SITES AND THE COMPLEX SUPPORT FACILITY ARE INTERPRETABLE. FOURTEEN LAUNCH SITES AND THE RAIL-TO-ROAD TRANSFER POINT CAN BE IDENTIFIED ONLY. NO OTHER SIGNIFICANT ACTIVITY IS OBSERVED. NO NEW MISSILE ACTIVITY OBSERVED WITHIN CLOUD-FREE PORTIONS OF THE 50-NM SEARCH AREA. CONSTRUCTION STATUS AND DETAILED DATA FOR INTERPRETABLE TYPE IIIC LAUNCH SITES ARE AS FOLLOWS -- LAUNCH GROUP A -- ALL 6 SITES ARE COMPLETE. FIVE SITES 1-3, 5, AND 6 ARE INTERPRETABLE. LAUNCH GROUP B -- ALL 6 SITES ARE COMPLETE. FOUR SITES (7 AND 9-11) ARE INTERPRETABLE. LAUNCH GROUP C -- SITE 18 IS IN THE MID-STAGE OF CONSTRUCTION. 48 Handle Via Approved For Release-2-00 i.C RDP9A]Aa?96R000100370001 12EHr-KEYHOLE Tarr ttl(., tt ~p Control System Only Handle Via TOP SECRET CHESS RUFF TALENT SE sH roved For Release 2002/02/27 : CIA-RDP99T01396R0001003700011.~5 Control st n -80337167 KH-4 MISSION 10411, 10-23 MAY 1.967 25X1 A ALL 37 TYPE IIIC LAUNCH SITES, THE COMPLEX SUPPORT FACILITY, AND THE RAIL-TO-ROAD TRANSFER POINT ARE INTERPRETABLE. LAUNCH SITE 31 CAN NOW BE CONFIRMED AS THE CONTROL SITE FOR LAUNCH GROUP E AND LAUNCH SITE 37 IS NOW IDENTIFIED AS THE CONTROL SITE FOR LAUNCH GROUP F. CONSIDERABLE ACTIVITY IS OBSERVED IN THE DISTRIBUTION POINT OF THE COMPLEX SUPPORT FACILITY. HOWEVER, THE QUANTITY OF MATERIALS IS PROBABLY FOR EXISTING SITES STILL UNDER CONSTRUCTION. NO SIGNIFICANT ACTIVITY IS OBSERVED IN THE TRANSFER POINT. UNIDENTIFIED SCARRING AND TRACK ACTIVITY EAST OF LAUNCH GROUP F MAY INDICATE A SEVENTH LAUNCH GROUP. HOWEVER, NO NEW VED HE LOUD-FREE DETAILED DATA FOR INTERPRETABLE LAUNCH SITES IN COMPLETED LAUNCH GROUPS IS AS FOLLOWS ?-- LAUNCH GROUP A -- ALL 6 SITES (1-4, 6, AND 7) ARE INTERPRETABLE. NO SIGNIFICANT ACTIVITY OBSERVED. LAUNCH GROUP B -- ALL 6 SITES (8-13) ARE INTERPRETABLE. NO SIGNIFICANT ACTIVITY OBSERVED. CONSTRUCTION STATUS AND DETAILED DATA FOR INTERPRETABLE LAUNCH SITES IN LAUNCH GROUPS STILL UNDER CONSTRUCTION ARE AS FOLLOWS LAUNCH GROUP C -- ALL 6 SITES (14-19) ARE INTERPRETABLE AND IN A LATE STAGE OF CONSTRUCTION. CONSTRUCTION CONTINUES ON THE L-SHAPED ELECTRONIC FACILITY AT CONTROL SITE 15. THE CONTROL BUNKER IS BACKFILLED AND THE TANK EXCAVATION REMAINS OPEN. NO OTHER SIGNIFICANT ACTIVITY OBSERVED. LAUNCH GROUP D ALL 6 SITES (21-26) ARE INTERPRETABLE AND IN THE MID-STAGE OF CONSTRUCTION. A SILO LINER IS IS ON THE RECTANGULAR MOUND AT SITE 25. THE CONTROL BUNKER AT SITE 21 REMAINS UNCOVERED. NO OTHER SIGNIFICANT ACTIVITY OBSERVED. LAUNCH GROUP E ALL 6 SITES (28-32 AND 34) ARE INTERPRETABLE. ALL SITES ARE IN THE MID-STAGE OF CONSTRUCTION. AN EXCAVATION FOR THE CONTROL BUNKER ENABLES CONFIRMATION OF SITE 31 AS THE CONTROL SITE. NO OTHER SIGNIFICANT ACTIVITY OBSERVED. 49 Handle Via Approved For ReleaT f)f0 pt396R00010037000~Ik NT-KEYHOLE Contr. System only Handle Via TOP SECRET CHESS RUFF TALENT-KEY roved For Release 2002/02/27 : CIA-R P99T01396R00010037000t4S_80337/67 Control System my KH-4 MISSION 1041 v 10--23 MAY 1967 LAUNCH GROUP F -- ALL 6 SITES (35-40) ARE INTERPRETABLE. ALL SITES ARE IN AN EARLY STAGE OF CONSTRUCTION. LAUNCH SITE 40 CAN NOW BE CONFIRMED. AN EXCAVATION FOR THE CONTROL BUNKER CONFIRMS SITE 37 AS THE CONTROL SITE. NO OTHER SIGNIFICANT ACTIVITY OBSERVED. TRANSFER POINT SITE -- LAUNCH SITE 33X IS INTERPRETABLE AND IN THE MID-STAGE OF CONSTRUCTION0 NO SIGNIFICANT ACTIVITY OBSERVED. Handle Via T ENT KEYHCILE Approved For ReleasTOPO~R/i&,fC 139 T(uF 96R0001003700Contr 2E ' System only 25X1 D L Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Handle Via 10~ l & W: ~~E S 1t TALENT-KEYHR roved For Release 0 P 1396R00010037000t2S-80337167 Control System Only KH-4 MISSION 1041, 10-23 MAY 1967 25X1A THE 50-NM SEARCH AREA IS COVERED ON PHOTOGRAPHY. NO NEW MISSILE FACILITIES ARE OBSERVED WITHIN THE CLOUD-FREE PORTIONS. ELEVEN OF THE 19 LAUNCH SITES AND THE RAIL-TO-ROAD TRANSFER POINT ARE IDENTIFIED ONLY. THE REMAINING 8 LAUNCH SITES AND THE COMPLEX SUPPORT FACILITY ARE NOT OBSERVED. ALL 29 LAUNCH SITES, THE COMPLEX SUPPORT FACILITY (CSF), AND THE RAIL-TO-ROAD TRANSFER POINT ARE INTERPRETABLE. THE ANTENNA SILO POSITIONS FOR THE ELECTRONICS FACILITY AT SITE 14C ARE VISIBLE. HOWEVER, NO DITCHING IS PRESENT BETWEEN THESE POSITIONS AND THE CONTROL BUNKER. NO SIGNIFICANT ACTIVITY IS OBSERVED AT THE TRANSFER POINT AND ONLY A MINOR LEVEL OF ACTIVITY IS OBSERVED AT THE COMPLEX SUPPORT FACILITY. THE ENTIRE SEARCH AREA IS COVERED ON PHOTOGRAPHY WITH SCATTERED CLOUD COVER. NO NEW MISSILE-RELATED ACTIVITY OBSERVED IN CLOUD-FREE PORTIONS. DETAILED DATA FOR INTERPRETABLE TYPE IIIC LAUNCH SITES IN COMPLETED LAUNCH GROUPS IS AS FOLLOWS -- LAUNCH GROUP A -- ALL 6 SITES (1-6) ARE INTERPRETABLE. NO SIGNIFICANT ACTIVITY OBSERVED. LAUNCH GROUP B -- ALL 6 SITES (7, 8, AND 10-13) ARE INTERPRETABLE. NO SIGNIFICANT ACTIVITY OBSERVED. CONSTRUCTION STATUS AND DETAILED DATA FOR TYPE IIIC LAUNCH SITES IN LAUNCH GROUPS UNDER CONSTRUCTION ARE AS FOLLOWS LAUNCH GROUP C -- ALL 6 SITES (14, 15, AND 18-21) ARE INTERPRETABLE. LAUNCH SITE 18 IS IN A LATE STAGE OF CONSTRUCTION. THE OTHER SITES ARE IN THE MID-STAGE OF CONSTRUCTION. THE ELECTRONICS FACILITY AT SITE 14C IS SIMILAR TO THE ONE OBSERVED AT OLOVYANNAYA SITE 60J. Handle Via Approved For Relea Og 7 CSI 9RW96R00010037000JakENT-KETHOLE Control System Only Handle Via TT pp ;;II ((''~~~~ (('' FFCCCC`RbP TALENT -KEY HA pproved For ReleaIP20U2' (T2' T. C1 A111' FF396R000100370001-2 Control System Only TCS-80337/67 KH-4 MISSION 104:1 Q 10-23 MAY 1967 LAUNCH GROUP D -- ALL 6 SITES (24-26 AND 28-30) ARE INTERPRETABLE AND IN THE MID-STAGE OF CONSTRUCTION. NO SIGNIFICANT ACTIVITY OBSERVED. LAUNCH GROUP E -- ONLY 4 SITES (31, 32, 34, AND 36) ARE PRESENTLY ASSOCIATED WITH THIS GROUP. THEY ARE ALL INTERPRETABLE AND IN EARLY STAGES OF CONSTRUCTION. NO SIGNIFICANT ACTIVITY OBSERVED. TRANSFER POINT -- LAUNCH SITE 27X IS INTERPRETABLE AND IN THE MID-STAGE OF CONSTRUCTION. NO SIGNIFICANT ACTIVITY OBSERVED. l~ 153~,q~F~ppg~~p~.3 Handle Via Approved For Releatbfp~?,-llitf tt1tJJ KUI'r 96R00010037000TP1IZNT KEYHOLE 11'' t/!l~l.~C Control System Only 25X1 D Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Handle Via np M T lQuCeC ~ TALENT -KEftiproved For Releasl7Q0 C t 96R000100370001- S-80337/611 25X1A IMENI GASTELLO ICBM COMPLEX UR 5106N 06618E TWELVE OF THE TYPE IIIC LAUNCH SITES ARE INTERPRETABLE. THE REMAINING 13 SITES, THE COMPLEX SUPPORT FACILITY, AND THE RAIL-TO-ROAD TRANSFER POINT ARE OBSERVED BUT CAN BE IDENTIFIED ONLY. NO SIGNIFICANT ACTIVITY. OBSERVED. NO NEW MISSILES OR MISSILE-RELATED ACTIVITY OBSERVED IN CLOUD-FREE PORTIONS OF THE 50-NM SEARCH AREA. CONSTRUCTION STATUS AND DETAILED DATA FOR INTERPRETABLE TYPE IIIC LAUNCH SITES ARE AS FOLLOWS ?-- LAUNCH GROUP A -- ALL 6 SITES ARE COMPLETE. SITES 2, 39 AND 5 ARE INTERPRETABLE. LAUNCH GROUP B -- ALL 6 SITES ARE COMPLETE. SITES 8, 11, AND 12 ARE INTERPRETABLE. LAUNCH GROUP C -- SITES 13 AND 14 ARE COMPLETE. SITE 18 IS IN A LATE STAGE OF CONSTRUCTION. LAUNCH GROUP D -- SITES 1S' AND 23 ARE :[N THE MID-STAGE OF CONSTRUCTION. SITE 24 IS IN AN UNDETERMINED STAGE OF CONSTRUCTION. 5 5 Approved For Release 2002/02/27: CIA-RDP99TO1396RO0010037000 Handle Via ENT-KEYHOLE TOP SECRET CHESS RUFF Control System only Handle Via T Z~ ~ Y ~u ~ RI' 1 TALENT-KEY 1 troved For Release 0 I /2 C d~ 99' b1ISR000100370001-2 Control System Only TCS-80337/6+1 KH-4 MISSION 1041, 10-23 MAY 1967 25X1A SEVENTY-EIGHT TYPE IIID SINGLE SILO LAUNCH SITES, THE COMPLEX SUPPORT FACILITY, AND THE RAIL-TO-ROAD TRANSFER POINT ARE PARTIALLY INTERPRETABLE. APPROXIMATELY 1.5 NM ESE OF LAUNCH SITE 98, AN UNIDENTIFIED SCAR PATTERN IS OBSERVED IN A WOODED AREA. THE CLEARINGS OR SCARS POSSIBLY HAVE AN ELECTRONIC SIGNIFICANCE. ALL OF THE SEARCH AREA IS COVERED ON PHOTOGRAPHY AND NO NEW MISSILE FACILITIES ARE OBSERVED. DETAILED DATA FOR TYPE IIID LAUNCH SITES IN COMPLETED LAUNCH GROUPS IS AS FOLLOWS -- GROUP A 8 OF THE 10 LAUNCH SITES (2 AND 5-11) ARE INTERPRETABLE. NO SIGNIFICANT ACTIVITY IS OBSERVED. GROUP B -- 6 OF THE 10 LAUNCH SITES (12-14,. 17, 29, AND 30) ARE INTERPRETABLE. NO SIGNIFICANT ACTIVITY IS OBSERVED. GROUP C -- ALL 10 LAUNCH SITES (20, 229 24-28, 32, 44, AND 57) ARE INTERPRETABLE. NO SIGNIFICANT ACTIVITY IS OBSERVED. GROUP D - ALL 10 LAUNCH SITES (36-42, 54, 72, AND 73) ARE INTERPRETABLE. NO SIGNIFICANT ACTIVITY IS OBSERVED. CONSTRUCTION STATUS AND DETAILED DATA FOR TYPE IIID SITES IN LAUNCH GROUPS STILL UNDER CONSTRUCTION ARE AS FOLLOWS -- Handle Via Approved For ReleasTMO f :[CW1CUr:96R000100370001T,EHT-KEYHOLE Control System Only Handle Via M fj 0Sy ,T ~i~-r , J~~~ TALENT-KEVHA6proved For Release 396 R000100370001OS 337f67 Control System Only KH-4 MISSION 1041, 1.01-n23 MAY 1967 GROUP E -- 8 OF THE 10 SITES ARE INTERPRETABLE. SITES 77, 80, 103, AND 122 REMAIN IN THE MID-STAGE OF CONSTRUCTION. SITES 47, 76, 100, AND 1.20 ARE IN AN UNDETERMINED STAGE OF CONSTRUCTION. GROUP F -- 5 OF THE 10 SITES ARE INTERPRETABLE. SITES 51, 61, AND 62 ARE COMPLETE. SITES 58 AND 90 ARE IN AN UNDETERMINED STAGE OF CONSTRUCTION. GROUP G 7 OF THE 10 SITES ARE INTERPRETABLE. SITES 71., 75, 88, 92, AND 98 ARE IN A LATE STAGE OF CONSTRUCTION. SITE 137 IS IN THE MID-STAGE OF CONSTRUCTION. CONSTRUCTION. SITE 67 IS IN AN UNDETERMINED STAGE OF GROUP H -- 4 OF THE 10 SITES ARE INTERPRETABLE. SITES 96 AND 119 ARE IN THE MID-STAGE OF CONSTRUCTION. SITES 101 AND 129 ARE IN AN UNDETERMINED STAGE OF CONSTRUCTION. GROUP I -- 6 OF THE 9 SITES ARE INTERPRETABLE. SITES 869 91, AND 136 ARE IN THE MID-STAGE OF CONSTRUCTION. SITES 749 84, AND 85 ARE IN AN UNDETERMINED STAGE OF CONSTRUCTION GROUP J -- 5 OF THE 10 SITES ARE INTERPRETABLE. SITES 109, 1119 115, AND 123 ARE IN AN UNDETERMINED STAGE OF CONSTRUCTION. GROUP K -- 6 OF THE 10 SITES ARE INTERPRETABLE. SITES 1249 1349 AND 139-141 ARE IN THE MID-STAGE OF CONSTRUCTION. SITE 132 IS IN AN UNDETERMINED STAGE OF CONSTRUCTION. TRANSFER SITE 35 (X) IS COMPLETE. NO SIGNIFICANT ACTIVITY IS OBSERVED. CONSTRUCTION STATUS AND DETAILED DATA FOR TYPE IID SITES WITH GROUP ASSOCIATION UNDETERMINED ARE AS FOLLOWS -- LAUNCH SITE 142 IS INTERPRETABLE, BUT IS IN AN UNDETERMINED STAGE OF CONSTRUCTION. LAUNCH SITE 131 REMAINS IN THE MID-STAGE OF CONSTRUCTION. 57 Handle Via Approved For Relea& Q0 T CI~y,~ZL1P9g ffr96R00010037000JAMENT KEYHOLE ~I VVIP' JCCII.. 1 11CJJ R f'r Control System Only Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Next 2 Page(s) In Document Exempt Approved For Release 2002/02/27 : CIA-RDP99TO1396R000100370001-2 Handle Via 7AIENT-KEYproved For Releas1gg0?KFf TCh4!XBP9&U96R000100370001-2 Control System Only TCS-80337/67' KH-4 MISSION 1041.1 10-23 MAY 1967 25X1A AKHTYRKAMRBM LAUNCH SITE I UR 5016N 03449E OBJECTS MAY BE ON 1 OR 2 OF THE LAUNCH POSITIONS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR b 1 Handle Via Approved For Release 2002/02/27 :CIA-RDP99T01396R000100370001IENT-KEYHOLE TOP SECREI CHESS RUFF Control System Only Handle Via A* roved For Release 2DOZ/U/~TTCI"A=RdP99TO1 968000100370001-2 Control System Only TCS-80337/67 KH-4 MISSION 1041, 10-23 MAY 1967 PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1A AKHTYRKA MRBM LAUNCH SITE 2 UR 5022N 03457E OBJECTS MAY BE ON 1 OR 2 OF THE LAUNCH PADS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. AKHTYRKA FIXED FIELD MRBM SITE UR 5019N 03451E ONE OR MORE OF THE LAUNCH POSITIONS MAY BE OCCUPIED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. SOFIYE-ALEKSEYEVSKOYE MRBM LAUNCH SITE UR 4415N 13122E A POSSIBLE ERECTOR IS IN POSITION ON EACH LAUNCH PAD. NO NEW CONSTRUCTION, CHANGES IN FACILITIES9 OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. BARANO-ORENBURGSKOYE MRBM LAUNCH SITE UR 4420N 13130E TWO PIECES OF EQUIPMENT ARE ON THE NE LAUNCH PAD. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. +52 Handle Via Approved For Releasyff~RfRfb ff ITj3tf96R000100370001I~LEHT-KEYHOLE Control System Only Handle Via br-T TALENT Acl &p~ YKKEYH~AJliproved For Relea 0 396R000100370001-2 Control System Only TCS-80337/67 KH-4 MISSION 1041, 10-23 MAY 1967 25X1A SOFIYE-ALEKSEYEVSKOYE FIXED FLD MRBM SITE UR 4411N 13124E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NOVOGEORGIYEVKA FIXED FIELD MRBM SITE UR 4409N 13125E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. OLEVSK MRBM LAUNCH SITE 1 UR 5108N 02759E POSSIBLE ERECTORS ARE OBSERVED ON 2 PADS. UNIDENTIFIED EQUIPMENT IS OBSERVED ON 1 PAD. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. OLEVSK MRBM LAUNCH SITE 2 UR 5110N 02803E ERECTORS ARE OBSERVED ON 4 PADS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. RUDNYA ZLOTINSKAYA MRBM LAUNCH SITE UR 5103N 02807E NO MISSILES. MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 6-3 Handle Via Approved For Relea 0?~~ ~T Q 9RTp96R00010037000j EHT-KEYHOLE Control System Only Handle Via P C 99: ~N ~aFCt b F~ TALENT -KEYH>A~iproved For Relea 0 `~ 396R000100370001 Control System Only T S-80337/6-F KH-4 MISSION 1041, 10-23 MAY 1967 25X1A NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. ONLY THE LAUNCH AREA IS VISIBLE. EACH LAUNCH PAD IS OCCUPIED BY A POSSIBLE ERECTOR. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. A POSSIBLE ERECTOR IS POSITIONED ON EACH LAUNCH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 64 Handle Via Approved For Release-20 ?O D T CJ~ PyU 1396R000100370001AaNT-KEYHOLE rr ~~tta (.I~CESS rrrr Control System Only Handle Via TOP SECRET CHESS RUFF TALENT KEY %4rpved For Release 2002/02/27 : CIA-RDP99T01396R00010037000f-C2S_8 337/67 Control Sys e n y KH-4 MISSION 1041, 10-23 MAY 11967 25X1 A BRODY MRBM LAUNCH SITE 1 UR 5006N 02512E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. BRODY MRBM LAUNCH SITE 2 UR 5012N 02505E UNIDENTIFIED EQUIPMENT IS OBSERVED ON ALL 4 LAUNCH PADS. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. BERESTECHKO MRBM LAUNCH SITE UR 5020N 02505E ALL 4 LAUNCH PADS ARE OCCUPIED BY POSSIBLE ERECTORS. ADDITIONAL UNIDENTIFIED EQUIPMENT IS VISIBLE ON THE NW LAUNCI PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. YAZLOVCHIK FIXED FIELD MRBM SITE UR 5005N 02501E NO MISSILES9 MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. STANISLAVCHIK FIXED FIELD MRBM SITE UR 5006N 02456E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 65 Handle Via T ENT-KEYHOLE Approved For ReleasTW2 RR :[C on System Only Handle Via ?roved For Release02~OZ/ /~T Cfi4- TALENT-KEY W99 1 c96R000100370001T2S-80337/6.1 Control System Only KH-4 MISSION 104:1, 10-23 MAY 1967 25X1A ERECTORS OCCUPY EACH PAD. FUEL AND OXIDIZER TRAILERS ARE OBSERVED IN THE FUEL AND OXIDIZER AREAS. NO NEW CONSTRUCTION9 CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. DERAZHNYA MRBM LAUNCH SITE 2 UR 4926N 02728E PROBABLE ERECTORS OCCUPY EACH PAD. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES9 MISSILE-RELATED EQUIPMENTS NEW CONSTRUCTION9 CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 66 Handle Via Approved For Releas app(o-~~~ g~~p?6R000100370001 Tf1EHT-KEYHOLE C7TC[., ~~ Rl7r Control System Only Handle Via ?gAE rg-W TALENT-KErAlproved For Re1eas2 Z00 ~/ C 96R000100370001-2 Control System Only TCS-80337/67 KH-4 MISSION 1841, 10-23 MAY 1967 25X1A LETICHEV FIXED FIELD MRBM SITE 2 UR 4925N 02744E NO MISSILES, MISSILE-RELATED EQUIPMENTS NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. DISNA MRBM LAUNCH SITE UR 5535N 02816E ERECTORS ARE OBSERVED ON ALL 4 PADS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. ZELKI MRBM LAUNCH SITE UR 5535N 02824E ERECTORS ARE OBSERVED ON ALL 4 PADS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. BORKOVICHI MRBM LAUNCH SITE UR 5541N 02827E ERECTORS ARE OBSERVED ON ALL 4 PADS. NO NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. DERNOVICHI FIXED FIELD MRBM SITE UR 5547N 02819E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED,. 67 Handle Via Approved For Relea (JP0~peff~.C1AHg~g9~TQO096R00010037000 Control r EN1-K[r only Handle Via TOP SECRET CHESS RUFF TALENT?KEYH oved For Release 2002/02/27 : CIA-RDP99TO1396R00010037000tl25-80337 /67 Control System uy KH-4 MISSION 1041, 10-23 MAY 1967 25X1D 25X1A NO MISSILESv MISSILE-RELATED EQUIPMENT,; NEW CONSTRUCTION9 CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D NO MISSILES, MISSILE-RELATED EQUIPMENT* NEW CONSTRUCTION, CHANGES IN FACILITIES9 OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D EACH PAD IS OCCUPIED BY A POSSIBLE ERECTOR. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D POSSIBLE ERECTORS OCCUPY EACH LAUNCH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D A PROBABLE ERECTOR OCCUPIES EACH LAUNCH PAD. AN ERECTED MISSILE IS VISIBLE ON THE NW PAD. NO NEW CONSTRUCTION, CHANGES IN FACILITIES9 OR 158 Handle Via Approved For Relea ff c T TAfIff 9RQfi96R000100370pOt~ oTSystem-KEYHOLE yst mY Only Handle Via TOP ~5y 1T - -' J l f TALENT -KEY HpmOnpproved For Release 0 396R0001003700011-2 Control Systely TCS?80337/67 KH-4 MISSION 1041, 10-23 MAY 1967 25X1A FOUR LAUNCH PADS ANO PART OF THE SUPPORT AREA ARE VISIBLE. UNIDENTIFIED EQUIPMENT OCCUPIES EACH LAUNCH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. RUDA YAVORSKAYA FIXED FIELD MRBM SITE 2 UR 5323N 02512E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. RUDA YAVORSKAYA FIXED FIELD MRBM SITE 3 UR 5323N 02513E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. BEREZOVKA FIXED FIELD MRBM SITE UR 5342N 02530E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 69 Handle Via Approved For Relea O~ T (I~ 9~Uf 96R00010037000j& EHT-KEYHOLE Control System Only Ilandle Via T% 1r U TALENT-KEYAO roved For Releas e 0zr C 9 96R000100370001-2 Control System Only TCS-80337/61' KH--4 MISSION 1043.9 10?23 MAY 1967 25X1A BORKHOV MRBM LAUNCH SITE 1 UR 5218N 03042E POSSIBLE ERECTORS ARE POSITIONED ON EACH PAD. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. POSSIBLE ERECTORS ARE POSITIONED ON EACH PAD. TRAILERS ARE OBSERVED IN THE PROPELLANT AREA. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT,, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENTS NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 70 Handle Via Approved For Relea I dQO Wfi.I.CJA;M9M96R00010037000ntrolESys em Only -KHOLE Handle Via Tgt Mfg" ~ R96 oved For Release 0 C R000100370007~- TALENT?KEIAAqi~rnly (Control System O KHaa4 MISSION 1041., 10-23 MAY 1967 NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D 25X9 25X9 25X1 D GRESK MRBM LAUNCH SITE 1 UR 5314N 02742E 25X1D OSSIBLE ERECTORS OCCUPY 2 PADS. POSSIBLE ERECTORS OCCUPY ALL 4 PADS. NO NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D GRESK MRBM LAUNCH SITE 2 UR 5316N 02740E 25X1D A POSSIBLE ERECTOR OCCUPIES 1 PAD AND UN DENTIFIED EQUIPMENT OCCUPIES ANOTHER PAD. 25X1D A POSSIBLE MISSILE EXERCISE IS UNDERWAY ON THE NE PAD AND ERECTORS OCCUPY THE OTHER 3 PADS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D URECHYE MRBM LAUNCH SITE UR 5311N 02758E 25X1D POSSIBLE EQUIPMENT IS OBSERVED ON ALL 4 PADS. PROBABLE ERECTORS OCCUPY 2 PADS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR Handle Via 25X1A Approved ForReleasr0 ~,2/,ff1?C,,J~~?1p99 Tq,a~396R000100370001t42 ENT KEYH Only Handle Via 1fbproved For Release TALENT-KEY qDOZlIIZ TTCfA=RD~99T01396RO00100370001QS-80337/67 Control System Only KH=-4 MISSION 10419 i0?23 MAY 1967 25X1A UNIDENTIFIED EQUIPMENT OCCUPIES EACH LAUNCH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTIONQ CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. PROBABLE ERECTORS OCCUPY EACH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENTI NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. Handle Via Approved For Release TUP 2 00370001FQENT-KEYHOLE Control System Only Handle ia TALENTVKEYApproved For Releasl`2b021g~g1cw-x g99'I' , 96R000100370001-2 Control System Only TCS-80337/67 KH-4 MISSION 10419 10-23 MAY 1967 25X1A GVARDEYSK MRBM LAUNCH SITE 2 UR 5445N 02109E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. VYSOKOYE FIXED FIELD MRBM SITE UR 5444N 02133E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. IECAVA MRBM LAUNCH SITE 1 UR 5635N 02404 POSSIBLE ERECTORS ARE OBSERVED ON ALL LAUNCH PADS. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. IECAVA MRBM LAUNCH SITE UR 5639N 02407E A POSSIBLE ERECTOR IS POSITIONED ON EACH LAUNCH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. IECAVA MRBM LAUNCH SITE 3 UR 5633N 02420E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 73 Handle Via Approved For ReleasT2GD ftft:IC6fff SO-KEYHOLE u Control System Only Handle Via KEyAgoproved For ReleasI`200Y/Eg1 TCc -ABP99` &996R000100370001f ,S-80337 /67 Control System Only KH-4 MISSION 1041, 10-23 MAY 1967 25X1A NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. A POSSIBLE VEHICLE IS POSITIONED ON EACH OF THE 2 NORTHERN LAUNCH POSITIONS, NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. A POSSIBLE MISSILE ERECTOR OCCUPIES EACH LAUNCH POSITION. POSSIBLE FUEL/OXIDIZER TRAILERS ARE IN THE FUELING POSITIONS. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. A POSSIBLE ERECTOR OCCUPIES THE LAUNCH POSITION. FUEL/OXIDIZER TRAILERS ARE IN THE FUELING AND OXIDIZER AREAS. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. Handle Via Approved For Relea dQO Q?,/ ~rCIACH S -HP9-U~~96R00010037000ntrol SystKEYHOLE Only Handle Via TOP T 9 'W~~~ TALENT-KEYHApproved For Release 0 3968000100370001-2 Control System Only TCS-80337/67 KH-4 MISSION 1041, 10-23 MAY 1967 25X1D 25X1A DUNAYEVTSY MRBM LAUNCH SITE UR 4855N 02659E NO MISSILES9 MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D VINKOVTSY FIXED FIELD MRBM SITE UR 4856N 02711E NO MISSILES9 MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D KIVERTSY MRBM LAUNCH SITE 1 UR 5.053N 02530E UNIDENTIFIED EQUIPMENT IS POSITIONED ON EACH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D KIVERTSY MRBM LAUNCH SITE 2 UR 5056N 02536E A POSSIBLE ERECTOR IS POSITIONED ON EACH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D TROSTYANETS MRBM LAUNCH SITE UR 5058N 02539E A POSSIBLE ERECTOR IS POSITIONED ON EACH PAD. NO MISSILES OBSERVED. 75 Handle Via Approved For ReleatfQ~1~27.f ~,k-qP9 c I396R000100370001AUNT-KEYHOLE ))II::l1,, ESS t(Ur" Control System Only Handle Via T'O~ CFF'~: ~(AuFCC R~ ~t~ TALENT-KEYHApproved For Release 0 j' ` 7P9tJ1- 396800010037000 - S-81 337167 Control System Only KH-4 MISSION 1041., 10-23 MAY 1967 NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1A NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. ALL LAUNCH PADS ARE OCCUPIED BY ERECTORS. TRAILERS ARE OBSERVED IN THE PROPELLANT STORAGE AREA. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. ERECTORS ARE OBSERVED ON ALL LAUNCH PADS. SIX TRAILERS ARE OBSERVED IN THE PROPELLANT STORAGE AREA. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES9 MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. Handle Via Approved For ReleaT2AQ2ffi?~,?,7~T GJAE;gPg,9j 1396R000100370001AUNT-KEYHOLE 1' ))~1Ctll..FFCCtt 4F~ESS K rr Control System Only Handle Via se 2 1i2TO~Lr: HF , JI~g~ TALENT-KEVIproved For Release 0 A- 396R000100370001-2 Control System Only TCS-8.0337/67 KH-4 MISSION 10419 10-23 MAY 1967 25X1A NO MISSILES, MISSILE-RELATED EQUIPMENTS NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. AN ERECTED MISSILE IS ON THE NW PAD. MISSILE EXERCISES ARE IN PROGRESS ON 2 OTHER PADS. THE FOURTH PAD IS OCCUPIED BY AN ERECTOR. FUEL AND OXIDIZER TRAILERS ARE PRESENT IN THE FUEL AND OXIDIZER AREAS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. KOROSTEN MRBM LAUNCH SITE 2 UR 5052N 02831E EACH PAD IS OCCUPIED BY AN ERECTOR. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. LITKI FIXED FIELD MRBM SITE I UR 5101N 02827E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. YEMILCHINO FIXED FIELD MRBM SITE 1 UR 5052N 02753E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 77 Handle Via Approved For Relea 0JRff j Q 1- Ski IP96R00010037000TA NT-KEYHOLE Control System Only Handle Via TALENT-KEYWproved For ReleaTe 0QIi!VAT & ATl f396R000100370001fgS-gFl337I6 +I Control System Only KH-4 MISSION 1041, 10-23 MAY 1967 25X1A NO MISSILES9 MISSILE-RELATED EQUIPMENTS NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. ALL PADS ARE OCCUPIED BY ERECTORS AND A MISSILE EXERCISE IS UNDERWAY ON THE SOUTHERNMOST PAD. SIX OXIDIZER TRAILERS ARE OBSERVED IN THE OXIDIZER AREA. NO NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. THREE PADS ARE OCCUPIED BY ERECTORS AND UNIDENTIFIED EQUIPMENT IS OBSERVED IN THE FUEL/OXIDIZER AREA. A LARGE RECTANGULAR CLEARING IS OBSERVED IN THE WOODED AREA SOUTH OF THE SUPPORT FACILITY. A POSSIBLE ERECTOR OCCUPIES EACH LAUNCH PAD AND FUEL/OXIDIZER TRAILERS ARE OBSERVED IN THE PROPELLANT AREA. 7B Handle Via Approved For Relea"(2 ffI2.7T TA4MP9~U( V96R00010037000tRENT System only Handle Via TALENT -KEyHlapproved For ReleaSZ0 0 11-7T: W 3968000100370001-2 95U~ Control System Only TCS-80337/67 KHm4 MISSION 10419 10-23 MAY 1967 25X1A NO MISSILES, MISSILE-RELATED EQUIPMENT9 NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. A POSSIBLE MISSILE ERECTOR IS ON EACH LAUNCH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. A POSSIBLE ERECTOR IS ON EACH LAUNCH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. AN UNIDENTIFIED STRUCTURE AND A NEW ROAD SERVING THE STRUCTURE ARE LOCATED ON THE EAST EDGE OF THE LAUNCH SITE. NO MISSILES OR MISSILE-RELATED EQUIPMENT IDENTIFIED. A POSSIBLE ERECTOR IS VISIBLE ON EACH PAD AND ADDITIONAL EQUIPMENT IS ON ONE PAD. 79 Handle Via JAIN NT Approved For Releatle,2pQ2ff12.7T CJA,k~C1P99UQ~396R00010037000t oll System only Handle Via AV&roved For Release2 TALENT-KEY DOZ/II2"/ T CIA=&DP99TOI1396R000100370001I-CS-80337/61' Control System Only KH-4 MISSION 1041, 10-23 MAY 1967 NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1A THREE NEW CLEARINGS ARE OBSERVED, 2 EAST OF THE ACCESS ROAD AND 1 WEST9 GIVING THE SITE A CIRCULAR APPEARANCE. NO MISSILES OR MISSILE-RELATED EQUIPMENT VISIBLE. ALL 4 LAUNCH POSITIONS ARE OCCUPIED. POSSIBLE VEHICLES/PIECES OF EQUIPMENT ARE LOCATED IN THE LAUNCH AREA. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. KROLEVETS IRBM LAUNCH SITE 2 UR 5140N 03331E ALL 4 LAUNCH POSITIONS ARE OCCUPIED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. BEREZA IRBM LAUNCH SITE UR 5143N 03344E BOTH LAUNCH POSITIONS ARE OCCUPIED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. +30 Handle Via Approved For ReleastdQO2Jp2./2 tC)4jlf~19kff0 ?96R00010037000nt~ro~l SENT ystem -KEYHOLE Handle Via d TALENT-KE ~2DOZ/iJZ/~TrCfA=RDP99 1 c96R000100370001.~J5_80337/67 flnroved For Release Y}nm Pnn}rnl Cucl~ KH-4 MISSION 1041, 10-23 MAY 1967 25X1A NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENTS NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENTS NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. A PROBABLE ERECTOR IS OBSERVED ON EACH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 81, Handle Via Approved For ReleasTdfp~tt :TC S9 T(Otf96R000100370001I LENT-KEYHOLE Control System Only Handle Via 1'ALENT?KE11JA*~roved For Release300Z19T1.CfA-RDP99T01~96R000100370001rgS_80337/6 -' Control System Only KHf4 MISSION 1041' 10-23 MAY 1967 25X1A A PROBABLE ERECTOR IS OBSERVED ON EACH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES9 MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. UNIDENTIFIED EQUIPMENT IS VISIBLE ON ALL 4 LAUNCH PADS. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. UNIDENTIFIED EQUIPMENT IS VISIBLE ON ALL 4 LAUNCH PADS. NO MISSILES OBSERVED. NO NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES9 MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. Approved For ReleasT Handle Via " f CIHMICUrT"6R0001003700C-ont of System Only Handle Via TOP SECRET CHESS RUFF TALENT-KEY roved For Release 2002/02/27 : CIA-R P99TO1396R00010037000 Control System my _$-80337/6'1 KH-4 MISSION 10411, 10-23 MAY 1967 25X1A GOROKHOV FIXED FIELD MRBM SITE UR 5035N 02448E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. SHATSK FIXED FIELD MRBM SITE I UR 5327N 02748E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. KUROZHIPSKAYA MRBM LAUNCH SITE UR 4431N 04000E PROBABLE ERECTORS OCCUPY EACH PAD. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. SHIRVANSKAYA MRBM LAUNCH SITE UR 4425N 03953E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. TULSKAYA FIXED FIELD MRBM SITE UR 4431N 04014E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 83 Handle Via T LENT-KEYHOLE Approved For ReleasTor2 /, :IC9 8F96R00010037000ntrl System Only Handle Via TOP a g T . ~ , E I P 1I TALENT-KEYHAPproved For Release 0 396R00010037000 i'S_80337/67 Control System Only KH-4 MISSION 1041, 10?23 MAY 1967 25X1A NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. BLE ERECTORS ARE POSITIONED ON ALL 4 PADS JWAND 3 OCCUPIED BY UNIDENTI EQUIPMENT NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. LE ERECTORS ARE POSITIONED ON ALL 4 PADS = "WALL 4 PADS ARE OCCUPIED AND SEVERAL POSSIBLE VEHICLES/PIECES OF EQUIPMENT ARE OBSERVED IN THE TECHNICAL SECTION NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES9 MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED.. 84 Handle Via Approved For Relea 0~ T TAf ff ~91T 96R000100370POt of System Only Hiafldle Via For Release'20077I ! CT -R'DP99 ruFl1 96R00010037000 TALENT-KEYiAO proved 1'1'JS-80 337/b'T Control System Only 2 5X1A KH-4 MISSION 1041, 10-23 MAY 1967 NO MISSILES9 MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE?RELATEO EQUIPMENT, NEW CONSTRUCTION9 CHANGES IN FFACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. A POSSIBLE ERECTOR IS POSITIONED ON EACH LAUNCH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES9 MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 85 Handle Via Approved For Release 2002/02/27: CIA-RDP99T01396R000100370001ryENT.KEYHOLE TOP SfCREI CHESS RUM- Control System Only Handle KE TOP / J F~1 UFF~ TALENT-ETJ (proved For Release 200 CT-&A;9 01 96R000100370001TZS-80337/6"f Control System Only KH-4 MISSION 1041, 10-23 MAY 1967 25X1A NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY. UNREPORTED FEATURES OBSERVED. SHEPETOVKA FIXED FIELD MRBM SITE UR 5012N 02658E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT. NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 86 Approved For ReleasT ff ~ tkj jrCbjl ISS9WTj f f96R000100370001I#ENT-KEYHOLE r Control System Only TOP SfCRFT CHFSS RIIFF TALENT?KEY roved For Release 2002/02/27 : CIA- 9 01396R000100370001 Control Syste my TS-8033:7/67 KH-4 MISSION 1041, '?10-23 MAY 1967 . 25X1A PAPLAKA.MRBM LAUNCH SITE 2 UR 5625N 02116E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES,: OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. IVANOVO MRBM LAUNCH SITE UR 521.0N 02541E A POSSIBLE ERECTOR OCCUPIES EACH . LAUNCHPAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, `CHANGES' IN FACILITIES, OR PREVIOUSLY-UNREPORTED FEATURES OBSERVED. MOTOL MRBMLAUNCH SITE UR 5212N 02544E APOSSIBLE ERECTOR OCCUPIES EACH LAUNCH PAD. UNIDENTIFIED EQUIPMENT IS OBSERVED ON THE SOUTHERNMOST PAD.., NO. MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY.UNREPORTED FEATURES OBSERVED. LYCHKOVTSY FIXED FIELD.MRBM SITE UR 5215N 02521E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES,.OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. POLOTSKMRBM LAUNCH SITE 1 . UR 5522.N 02844E NO MISSILES, MISSILE-RELATEDEQUIPMENT,NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED0 87 Handle Via Approved For Releas TPp / ~g 'pt6R0001003700COlllLENT?KEYHOLE Vf ~Ci,JUf Control System Only Handle via ftf,roved For Releasigb021'bZ/7't'TCTA=o~99T0~396R000100370001 TALENT-KEY TtS_80337l67 ... I. KH-4 MISSION 1041, 10-23 MAY 1967 25X1 A NO MISSILES9 MISSILE-RELATED EQUIPMENT# NEW CONSTRUCTIONS CHANGES. IN FACILITIES: OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. PLISSA;FIXED FIELD:MRBM.SITE 1 UR 5512N 02802E NO MISSILES,. MISSILE-RELATED? EQUIPMENT, .NEW CONSTRUCTION, CHANGES ( IN FACILITIES, OR PREVIOUSLY UNREPORTED .FEA 1~URES OBSERVED. PLISSA:FIXED FIELD MRBM SITE 2 . UR 5511N 02754E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES.OBSERVED. POSTAVY MRBM !LAUNCH SITE 1 ERECTORS ARE OBSERVED ON ALL 4 PADS. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION9CHANGES IN FACILITIES,, OR PREVIOUSLY UNREPORTED..FEATURES:. OBSERVED. KOZYANY MRBM LAUNCH SITE UR 5520N 02651E ERECTORS.ARE.OBSERVED ON ALL 4 PADS. NO NEW CONST:RUCTION# CHANGES IN FACILITIES, OR PREVIOUSLY:UNREPORTED.FEATURES OBSERVED. Handle Via Approved For ReleasfdQ021A212ZTC1J#t~p99 Tpa1 96R0001003700onttiooli Sys em Only Handle Via ~~pp CC ~'uuFF TALENT-KEyApproved For ReleaslOAo7Acg~Tt 'A'R;;9 1 96R00010037000 S_103 Control System Only KH-4 :MISSION 1041, 10-23 MAY 1967 POSTAVY MRBM LAUNCH SITE 2 UR 5506N 02700E THE LEFT REAR SILO IS EITHER OPEN OR THE STRUCTURE HAS BEEN REMOVED FROMTHE SILO COVER AND;PLACED TO THE:REAR OF THE COVER. NO MISSILES, MISSILE-RELATED EQUIPMENT, OR NEW CONSTRUCTION OBSERVED. BOGATOYE FIXED FIELD MRBM SITE UR 5457N 02628E NO MISSILES9 MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED. FEATURES.OBSERVED. KOBYLNIK FIXED FIELD.MRBM SITE . UR 5456N 02637E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. PRUZHANY MRBM LAUNCH SITE 1 UR 523ON 02408E A .PROBABLE ERECTOR OCCUPIES EACH LAUNCH PAD. NO MISSILES OBSERVED.... NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY : UNREPORTEDFEATURES OBSERVED. PRUZHANY MRBM.LAUNCH SITE 2 UR 5233N 02406E A PROBABLE ERECTOR OCCUPIES EACH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, PREVIOUSLY UNREPORTED FEATURES OBSERVED. 7/67 25X1A 89 Handle Via Approved For Relea doO fffi-,C 11-1 1 Co agg9~-Uff6R00010037000nt~rol System Only Handle Via TALENT KEyltproved For ReleasN 02CA9fTCQ-W99"AU96R00010037000 1!`g5-80337 Control System Only KH-4 MISSION 1041, 10-23 MAY 1967 $TRIGOVO FIXED FIELD MRBM SITE UR 5223N 02414E NO MISSILES, MISSILE-RELATED EQUIPMENT,?=NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. SHCHERCHEVO FIXED FIELD MRBM SITE UR 5223N 02410E NO MISSILES, MISSILE-RELATED:EQUIPMENT, NEW CONSTRUCTION,CH(ANN^GESQIN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. UR 5226N 02419E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. SIMUNA MRBM LAUNCH SITE 1 UR 5908N,02626E ERECTORS ARE OBSERVED ON ALL 4 PADS. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES.OBSERVEO. VAIKE MAARJA MRBM LAUNCH SITE UR 5911N 02620E ERECTORS ARE OBSERVED ON ALL 4 PAD. NO NEW CONSTRUCTIONS CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 67 25X1A Handle Via Approved For RelealdpOgfeif T C~Hg~g9WU 096R0001003700Control System 01fiQ NT KEYOniE Handle Via TO~ ~ ~W: ~M~-~~PA4t~396ROO010037000IT?-S-80337/6-r TALENT-KEYH?4~proved For Release 0 ~1 Control System only K9-1 25X1 A -tt MISSION 10419 10-23 MAY 1967 TAMSALU FIXED FIELD MRBM SITE UR 5908N 02609E NO MISSILES,MISSILE-RELATED EQUIPMENT* NEW CONSTRUCTION, CHANGES IN FACILITIES,.OR PREVIOUSLY.. UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENTS NEW CONSTRUCTION, CHANGES IN FACILITIES, ORPREVIOUSLY UNREPORTED FEATURES OBSERVED. TAPA FIXED FIELD MRBM,.SITE UR 5916N 02603E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY: UNREPORTED FEATURES OBSERVED. RISTI:MRBMLAUNCH SITE 1 UR 5904N 02404E PROBABLE ERECTORS ARE PQSITIONED ON AT LEAST :2 PADS. NO NEW CONSTRUCTION,'CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. RISTI MRBM LAUNCH SITE 2 UR 5907N 02406E APOSSIBLE ERECTOR IS POSITIONED ON AT LEAST I PAD. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 91 Handle Via Approved For Relea 20171210. ~qP a 1396R00010037000IAIZNT-KEYHOLE r 'I:(,rctT t~~ rr Control System Only Handle Via TALENT-KEYHproved For ReleaM0?2792127 : ft`P99T0~396R000100370001r-S-80337/67' Control System Only KH-4 ?MISSION 1041, 10-23 MAY .1967 25X1A NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D A PROBABLE ERECTOR OCCUPIES EACH LAUNCH PAD. A NEW ATHLETIC FIELD IS VISIBLE NW OF THE SUPPORT?AREA0 NO MISSILES OBSERVED. 25X9 25X1 D KRUPAMRBMLAUNCH SITE 2 UR 5249N 02445E A PROBABLE ERECTOR OCCUPIES EACH LAUNCH PAD. A NEW ATHLETIC FIELD IS OBSERVED EAST OF'THE SUPPORT AREAO NO MISSILES.OBSERVED0 25X1 D ?r.,,, SHCHITNO FIXED FIELD MRBM SITE 2 UR 5241N 02457E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D 92 Handle Via Approved For Relea ~ OQ O (?Jr CIA- $,9dQ1,396R0001003700011 i2NT.KEYHOLE ~~tt((,,~~~~ CH K rr Control System Only Handle Via T0~ C T ~ 99T TALENT?KEYHTproved For Release 0 396R000100370001 Control System Only ~S-8~J337~'6T KH-4 MISSION 1041, 10-23 MAY 1967 25X1A KARA-BABAU IRBM LAUNCH SITE 1 UR 4431N 07746E NO MISSILES, MISSILE-RELATED EQUIPMENT* NEW CONSTRUCTION9 CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. KARA-BABAUIRBM LAUNCH SITE 2 UR 4430N 07759E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES.OBSERVED. KARA-BABAUIRBM LAUNCH SITE 3 UR 4431N07741E NO MISSILES,MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY. UNREPORTED FEATURES OBSERVED. SALANTAI MRBM.LAUNCH SITE 1 UR 5559N 02138E A POSSIBLE ERECTOR IS POSITIONED ON EACH LAUNCH PAD. NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGESIN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. A MISSILE ERECTOR IS POSITIONED ON EACH LAUNCH PAD. A WHITE STRIP HAS BEEN PAINTED DOWN.THE CENTER OF THE NORTHERNMOST READY .BUILDING AND OF ANOTHER BUILDING IN THE WARHEAD AREA. ..NO MISSILES OBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 93 Handle Via Approved For Relea cftWT ~I~ ' j V96R000100370001tLENT.KEYHOLE Control System Only Handle via roved For Releas-'2' TALENT-KEY 007Ibci TGTA'k1359 W 96R00010037000 1(-@S_g 37/67' Control System Only KH-4 MISSION 10412 10-23 MA Y .1967 25X1A NO MISSILES,MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NOMISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION2 CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVEDQ ALSEDZIAI FIXED FIELD MRBM SITE NO MISSIL?S, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT. NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO MISSILES9 1MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. Handle Via Approved For Releasiff Q'mftjCMST yf 96R00010037000ntrrooli System Only Handle Via TALENT KEy proved For Releass`2b02'Ibc TCg-R?599"1`b 96R00010037000 Ws-a0337/67 YII1 V1 ,,CONSTRUCTION CONTINUES IN THE WESTERNMOST CORNER OF THE AREA... NO OTHER NEW CONSTRUCTION, CHANGES IN FACILITIES, MISSILES,-MISSILE COMPONENTS9:ORLARGE RAILCARS ARE OBSERVED. 119 Handle Via Approved For Releajt c r ~I~ PSkat-P96R000100370001tNT-KEYHOLE CJJ r Control System Only Handle Via SP2 02'/29T: CTA- 9rU1 ,2 TALENT-KEYH&pproved For Relea 00~"1r 3968000100370001TCS_80337/67 Control System Only KH-4 `MISSION 1041, .10-23 MAY .:1967 25X1A MOSKVA GUIDED .MISSILE PLANT 82 UR 5550N 03727E THE PREVIOUSLY REPORTED BUILDING CONSTRUCTION IS CONTINUING. A SECOND WORKING BAY IS BEING ERECTED. NO MISSILES, MISSILE EQUIPMENT, MR LARGE RAIL CARS OBSERVED. MOSKVA MSL f, SPACE DEV CTR KALININGRAD 88 UR 5555N 03748E CONSTRUCTION ACTIVITY; CONTINUES IN THE SOUTHERN AREA OF THE CENTER. ONE BUILDING APPEARS COMPLETE AND 2ARE STILL UNDER CONSTRUCTION. GROUND SCARRING ' IS INDICATIVE OF=FURTHER DEVELOPMENT. NO MISSILES, MISSILE COMPONENTS,. OR LARGE RAIL CARS OBSERVED. ZAGORSK ROCKET `ENG TEST 'FAC KRASNOZAVODSK UR 5625N 03810E ONLY=THE?-POSSIBLE.NEW=TEST SITE IN THE EASTERN PORTION OF-THE FACILITY IS VISIBLE. THIS S I T EA P P E A R ST OB E BASICALLY COMPLETE. NO INDICATIONS OF TEST:ACTIVITY ARE OBSERVED. NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. KURUMOCH ROCKET ENGINE TEST FACILITY UR 5332N 04951E SCARRING FROM TESTtACTIVITY.IS VISIBLE AT TEST'STANDS 1 AND 2. 120 Handle Via Approved For ReleaQO~CC(0~~ C,l(,iICJJR9~Tr?1,396R00010037000TAQENT-KEYHOLE ~W t~ll~r I, UI"r Control System Only Handle Via pp CC~~~~pp ~~uu CCCC pp~~ ~~ TALENT -KEY4(IQproved For Releasj OOPI92/2TCfA!BP99~F096R000100370001AS-80337!67 KH-4 :MISSION 10419' 10-23 MAY .19:67 , PERM ARMAMENT PLANT 172 UR 5802N 05618E NO MISSILES,MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. GORKIY ARMT PLT'NOVOYE SORMOVO/STALIN 92 UR 5620N 04354E NO NEW CONSTAUCTION,?'CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO'VEHICLES, WEAPONS, OR EQUIPMENT OBSERVED. MOSKVA"AIRCRAFT PLANT:DOLGOPRUDNAYA 464 UR 5555N 03731E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY. UNREPORTED FEATURES OBSERVED. KRASNOYARSK ARMS: PLANT VOROSHILOV 4 UR 560ON 09259E NOLARGE RAIL CARS OBSERVED. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED DUE TO. SMALL SCALE. NO'NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. KRASNOYARSK.EXPLOS S:; PROPELLANTS' PLANT 58.0 UR 5602N 09303E NONEW CONSTRUCTION, LARGE RAIL CARS, OR MISSILE COMPONENTS; VISIBLE DUE TO SMALL SCALE. 25X1A 121 Handle Via Approved For Release 002/02/27: CIA-RDP99TO1396R000100370001ENT-KEYHOLE TOP SECRET CHESS RUFF Control System Only TALE Via IP C~T~yp~ W p~JFF TALENT KEYHw~pproved For Relea 0 99`I'OT396R000100370001-2 Control System Only TCS-80337/67 KH-4MISSION :1041, 10-23 MAY 1967 25X1A KRASNOYARSK ROCKET ENGINE TEST .FACILITY UR 5606N 09325E THE NEW POSSIBLE PROPELLANT UNLOADING BUILDING SE OF THE POSSIBLE FUELS PROCESSING/FABRICATION FACILITY HAS BEEN COMPLETED. APPARENT DITCHING IS OBSERVED IN THE SE CORNER OF_THE FACILITY. NO MISSILES, MISSILE-RELATED EQUIPMENT, OR SIGNS OF TEST ACTIVITY OBSERVED DUE TO SMALL SCALE. KUYBYSHEV AIRFRAME PLANT STALIN 1 UR 5313N 05017E NO MISSILES, MISSILE COMPONENTSs OR LARGE RAIL CARS OBSERVED. NO NEW CONSTRUCTIONv:CHANGESIN FACILITIES* OR PREVIOUSLY UNREPORTED"FEATURES OBSERVED. OMSK'ARCRAFT ENGINEPLANT'BARANOVA 29 UR 5457N 07325E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION,' CHANGES IN FACILITfESt OR PREVIOUSLY: UNREPORTED FEATURES OBSERVED. OMSK'ROCKET ENGINE TEST FAC GORNAYA BITIVAUR 5525N 07316E CONSTRUCTION CONTINUES. NO'MISSILES OR EVIDENCE OF RECENT FIRINGS DISCERNIBLE. . 122 Handle Via Approved For Relea 2A42, .7T CJA.RnPU?1396RO0010037000IAaNT-KEYHOLE I' )ICt~ll~{C~ t,liESS rr Control System Only Handle Via SPY O'T (I WQIf TALENT?KEYHt~proved For Relea 0 ~~p9~q3968000100370001- /~S-80337167 ___ n_I._ - _C KH-4 MISSION 1041,110-23 MAY. 1967 25X1A DARK STAINS IN THE SUMP OF TEST:.STAND 1 .:AND ATONE OF THE TEST :CELL BUILDINGS ARE' INDICATIVE OF CONTINUING TEST ACTIVITY. A FAINT. MARK 'ON THE EMBANKMENT AT .THE END OF 'THE DIFFUSER FOR TEST.STAND 2 IS PROBABLY :CAUSED BY TESTING. NO MISSILES* 'MISSILE-RELATED EQUIPMENT, 'NEW CONSTRUCTION, 'CHANGES` IN -FACILITIES, OR PREVIOUSLY, UNREPORTED FEATURES_OBSERVED.. ZAPOROZHYE.AIRCRAFT-ENGINE=PLANT478 UR 4749N 03511.E NO MISSILES, MISSILE--RELATEO EQUIPMENT, NEW CONSTRUCTION, `CHANGES IN FACILITIES, OR PREVIOUSLY: UNREPORTED FEATURES OBSERVED. KAZAN AIRCRAFT =ENGINE) PLANT16 UR 555I:N 04986E NO ROCKET ENGINE TEST FACILITIES'CAN BE'IQENTIFIE.0. NO NEW CONSTRUCTION, CHANGES IN FACILITIES,-`:OR . PREVIOUSLY =UNREPORTED FEATURES 'OBSERVED. RYBINSK AIRCRAFT :ENGINE' PLANT 36 UR 5803N ,03848E NO MISSILES,: =MISSILE -RELATED EQUIPMENT, -NEW CONSTRUCTION, `CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORT:D.FEATURES.OBSERVED. 123 Handle Via Approved For Release-20 0(02 ff , c & fpf 9(J r~T,Q.V96R00010037000IAaNT-KEYHOLE W t Kt ~,? t~ Control System Only Handle Via TALENT - T~100~2 I JWi ~FPI'- 99W1 96R000100370001-2 KEYl~proved For Relea Control System Only TCS-80337167 KH-4MI.SSION 1041,:10-23 MAY :1967 25X1A PEI-CHING GM?DEV PROD CTR CHANG-HSIN-TIEN CH .3950N 11608E RECENT TEST ACTIVITY:IS INDICATED BY DARK EFFLUENT IN THE SUMP FOR TEST STAND NO 3 AND EFFLUENT STAINS IN THE SUMP FOR.TEST"STAND NO 2. NO MISSILES,'MI.SSILE-RELATED EQUIPMENT,NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES: OBSERVED. PERM ROCKET ENGINE TESTFACILITY UR 580ON 05634E STAINS IN THE SUMP :FOR TEST STAND NO 1 ..INDICATE RECENT TEST ACTIVITY.: TEST$TAND NO 2 AND. THE. LARGE HIGH-BAY POSSIBLE-FABRICATION BUILDING IN THE CENTER OF THE FACILITY APPEAR COMPLETE. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. KUYBYSHEV EXPMT AC.ENG~PLT KR GLINKA 2 UR 5321N 05013E CONSTRUCTION CONTINUES. NO MISSILES, MISSILE COMPONENTS, OR LARGE RAIL CARS OBSERVED. MOSKVA:GUIDED MISSILE PLANT 67 UR 5545N 03752E NO MISSILES, MISSILE-RELATED EQUIPMENT,.~:NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. MOSKVA "GUIDED MISSILE RED PLANT KHI.MKI -301 UR: 5553N 03725E IN THE PLANT AREA, THE BUILDING-'PREVIOUSLY ;REPORTED TO BE UNDER CONSTRUCTION APPEARS COMPLETE. NO. SIGNIFICANT 124 Handle Via Approved For Release 2002/02/27: CIA-RDP99T01396R0001003700OIA&ENT-KEYHOLE TOP SECRET CHESS RUFF Control System Only TALENT -KEYHAq@proved For Re1eafe'2002tO2/27': CTA-`RDP99TO1396R00010037000WS-80337/67 KH-4 MISSION 1041, 10-23 MAY .1961 CHANGE IS APPARENT IN THE TEST AREA. NO MISSILES, MISSILE-RELATED EQUIPMENT,# NEW. CONSTRUCT ION,CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1A THE FACILITY CONSISTS OF A HORIZONTAL TEST AREA, A PROBABLE TEST AREA, A PROBABLE WEAPONS TEST`AREA,.A MISSILE TEST TRACK, AND SUPPORT AREAS. ONE NEW BUILDING IS OBSERVED UNDER CONSTRUCTION IN THE HORIZONTALTEST.'AREAO BLAST MARKS ARE OBSERVED IN BOTH THE HORIZONTAL TEST AREA AND THE SMALL SEPARATELY: SECURED PROBABLE TEST`AREA NEAR THE CENTER OF THE FACILITY. A NEW UNIDENTIFIED AREA UNDER CONSTRUCTION ON-THE EXTREME NNE EDGE OF THE FACILITY CONTAINS APPROXIMATELY 3 BUILDINGS AND A GOOD ROAD NETWORK. A NEWLY; IDENTIFIED SMALL POSSIBLE TEST TRACK IS.OBSERVED NORTH OF THE ORIGINAL TEST.TRACK. PERM AIRCRAFT ENGINE:PLANT STALIN 19 UR 5759N 05615E NO MISSILES:MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR. PREVIOUSLY UNREPORTED FEATURES OBSERVED. 125 Handle Via Approved For Relea O c- 9~T 1~e396R00010037000TApENT-KEYHOLE Control System Only ('TFCC~11~ Handle Via TALENT-KErA~Lproved For Releas1ZU0CF CwF7TJp'g9'I`Q 96R000100370001- Control System Only T S-80337/67: KH-4 `MISSION 1041,10-23 MAY .1967 25X1A BIYSK ROCKET MOTOR TEST FACILITY. UR 5229N 08507E APOSSIBLE NEW TEST POSITION MAY BE UNDER CONSTRUCTION ADJACENT 'TO THE SMALLER OF THE 2 TEST CELLS. THREE OF THE 4 LARGE STORAGE-TYPE.BUILDINGS ADJACENT TO THE . OFFSET BUILDINGS. HAVE BEEN COMPLETED. AT..THE ISOLATED TEST POSITION,THE TEST BUILDING/BLOCK AND UNIDENTIFIED OBJECTS.ARE VISIBLE AND A POSSIBLE BLAST MARK IS APPARENT.ON THE PAD:IN FRONT OF.THE TEST POSITION. NO IDENTIFIABLE MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. PERM ROCKET MOTOR TEST 3 FAC I l I TY DISCOLORATION OF :THE BLAST DEFLECTOR AT THE LARGE HORIZONTAL TEST CELL WAY INDICATES RECENT TEST ACTIVITY. NO.MISSILES9 MISSILE-RELATED EQUIPMENT* NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES.OBSERVED. KAMENSK-SHAKTINSKIYRKT MOTOR TEST.FAC UR 4819N 04016E NO: INDICATORS OF 'TEST =ACTIVITY OBSERVED. NO MISSILES,MISSILE--RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, 'OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. THE N/S :LEGS OF-THE INTERFEROMETER APPARENTLY ARE BEING DOUBLED IN LENGTH. A PREPARED CIRCULAR AREA HAS BEEN ADDED TO THE TERMINUS OF THE LEGS. THE NORTHERN. STRUCTURE APPEARS SLIGHTLY RAISED.: ADOME-SHAPED ENVIRONMENTAL STRUCTURE HAS BEEN CONSTRUCTED ADJACENT 126 Handle Via Approved For Releasf,2Q0~?21ziTCL41T~VWV~ 96R000100370001tr$Sys System Only Handle Via TOP O7T. EFA1+~~ - t pproved For Release 0 396800010037000 S_81r 337/6 TAIENT-KEY em Qnly 7 Control Syst H-4 MISSION 1041,10-23 MAY 1967. TO THE EASTERN SIDE OF THE SOUTHERN LEG. 25X1 D 25X11 , 25X1A ZELENOGORSK POSSIBLE STATIC TESTFACILITY UR 6013N 02943E THE LEVEL.OF ACTIVITY IS UNDETERMINED. NO NEW CONSTRUCTION,- CHANGES? IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. PEI-.CHING AIRFRAME.PL.ANT CH 3948N 11625E O8 -!4 :PROBABLE COOT, '1 CAB, AND 5 LIGHT STRAIGHT--WING- THE LEVEL OF ACTIVITY AND THE PRESENCE OF LONG RAIL CARS OR TRANSPORTERS CANNOT BE'DETERMINED NO NEW CONSTRUCTION OR- CHANGES IN FACILITIES OBSERVED. 25X1 D PAO-TOU,TANK.PLANT 617 CH 404ON 18955E NO EXTRA LONG RAIL CARS OR TRANSPORTERS OBSERVED. THE LEVEL OF PLANT -ACTIVITY IS UNDETERMINED. NO MISSILES, MISSILE-RELATED EQUIPMENT,-NEW CONSTRUCTION, CHANGES IN FACILITIES,' OR PREVIOUSLY UNREPORTED. FEATURES OBSERVED. . 25X1 D 25X6 127 Handle Via Approved For Relea c 'r TAfff IRO 96R000100370001t ENT-KEYHOLE Control System Only Handle Via TOO AC AT TALENT -KEY Hpproved For Release 0 396R000100370001-2~ ~i~ 1'O Control System Only TLS-80337/6-t KH-4 MISSION 1041, ' 10-23 MAY 1967 25X1A FAUSTOVO ROCKET ENGINE TEST FACILITY UR 5528N 03830E Na :SIGNS _OF RECENT TEST ACTIVITYOBSERVED. NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO NEW SIGNIFICANT CHANGES, CONSTRUCTION: MISSILE-RELATED EQUIPMENT, OR EVIDENCE OF`REGENT TESTING..OBSERVED DUE TO SMALL SCALE. IVANKOVO:GUIDED MISSILE PLANT UR 5645N 03707E A NEW.WORKSHOPHAS BEEN CONSTRUCTED NORTH OF :THE PREVIOUSLY REPORTED U-SHAPED ADMINISTRATION-TYPE BUILDING. NOOTHER CHANGES OBSERVED. NO MISSILES OR MISSILE COMPONENTS DISCERNIBLE DUE . TO SMALL SCALE. ONLY THE.. WESTERN 5 PERCENT "OF THE 50-NM SEARCH AREA IS COVERED ON PHOTOGRAPHY. NOSSM 4CTIVITY.OR OTHER UNREPORTED MISSILE FACILITIES ARE OBSERVED. EAST-NORTHEAST FROLOVO. FACILITY WAS FORMERLY REPORTED AS FROLOVO UNIDENTIFIED ACTIVITY. RAIL-SERVED. PROBABLY SECURED AREA CONTAINS 1 LARGE STORAGE/INDUSTRIAL-TYPE BUILDING, SEVERAL SMALL BUUILDINGS, AND `A PROBABLE OPEN STORAGE AREA BETWEEN FROLOVO AND THE FACILITY. THE AREA HAS AN INDUSTRIAL 128 Handle Via Approved For Relea4 r TIAfPVU~' 96R00010037000114NT-KEYHOLE LGJJJJ Control System Only Handle Via TOP SECRET CHESS RUFF TALENT-KEY roved For Release 2002/02/27 : CIA-RDP99T01396R000100370001 Control Syste my AS-8033.7167 KH-4MTSSION 1041,10-23 MAY 1967 25X1A YASASHNAYA TASHLA PROS MSL ASSOCIATED.FAC UR 5352N 04826E NO MISSILES,MISSILE-RELATED .EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. NO EVIDENCE OF CONSTRUCTION OR SURVEYING.RELEVANT.TO SSM ACTIVITY OBSERVED. APPROXIMATELY 40; PERCENT OF THE SOUTHERN HALF1OF.:THE SEARCH AREA IS CLOUD COVERED. TSANG-SHANE PROBABLE CD POSITIONS CH 3724N 11956E NO EVIDENCE OF CRUISE-MISSILE ACTIVITY OBSERVED. NO SIGNIFICANT CHANGE OBSERVED. NO VEHICLES, WEAPONS, OR EQUIPMENT'OBSERVED. THE 59-NM SEARCH AREA IS COMPLETELY COVERED ON PHOTOGRAPHY WITH APPROXIMATELY:50;.PERCENT.SCATTERED CLOUD COVER. NO NEW SAM ACT IVITYOBSERVED. 129 Handle Via Tff Rt-1c~. f 8 rr T ENT KEYHOLy Approved For Releas 6R0001003700 ontrol System Only Handle PO0OTT: 9R--f~D'P W'! -KEY Hftpproved For Relea 396R00010037000-?CS- Control System Only KH-4MISSION 1041,"10-23 MAY 1967 HSING-LUNG-CHUANG SAM SEARCH AREA CH 3655N 10051E THE NORTHERN 40 PERCENT OFTHE SEARCH AREA IS COVERED ON PHOTOGRAPHY WITH 60 PERCENT CLOUD COVER. NO SAM OR SAM-RELATED INSTALLATION/EQUIPMENT:OBSERVED-IN CLOUD-FREE AREAS. TAT-IYUAN SAM ;SEARCH AREA CH 3759N 1I.232E THE WESTERN 15 PERCENTOF"THE 50-NM SEARCH AREA IS COVERED.ON PHOTOGRAPHY. NO 'SAM ACTIVITY OBSERVED. KUYBYSHEV ABMIPROB.LR SAM SEARCH AREA; UR 5313N 05014E NO ABM OR PROBABLE LONG RANGE SAM ACTIVITY CAN BE IDENTIFIED IN CLOUD-FREE AREAS. MINSK ABM/PROS LR SAM SEARCH AREA UR 5353N 02734E THE ENTIRE SEARCH AREA IS COVERED:ON::PHOTOGRAPHY WITH PARTAL: CLOUD COVER. NO ABM/PROBABLE LONG RANGE SAM COMPLEXES OBSERVED: IN CLOUD-FREE. AREAS. THE WESTERN .80 PERCENT?OF THE SEARCH AREA IS COVERED ON PHOTOGRAPHY WITH 5 PERCENT CLOUD COVER. NO :ABM OR PROBABLE LONG RANGE SAM ACTIVITY OBSERVED. 25X1A 130 Handle Via Approved For Release 2002/02/27: CIA-RDP99T01396R000100370001AREHT.KEYHOLE TOP SECRET CHESS RUFF Control System Only Handle Via e 0 27 9: ~I- . Mf TALENT SEC T -KEY~IVi~iroved For Release 0 C 968000100370001-2 Control System Only TCS-80337/67 KH-4 'MISSION 1041,10-23 MAY 1967 25X1A CHELYABINSK PROB LR SAM LAUNCH COMPLEX 20 NM NE OF.CHELYABINSK. THE COMPLEX IS ORIENTED ON AN AZIMUTH AND CONSISTS OF :3 LAUNCH SITES -- A T FACILITY WITH 3 RADAR POSITIONS, .A MISSILE-HANDLING FACILITY, AND A SUPPORT AREA, ALL :UNDER CONSTRUCTION. REVIEW OF.EARLIER PHOTOGRAP THE COMPLEX WAS NOT:PRES NT AND WAS FIRST'SEEN (SEE ATTACHMENT) IVANO FRANKOVSK ABM/PROB LR SAM SRCH AREA UR 4906N 02456E APPROXIMATELY ? 5 PERCENT QF :.THE NORTHERN EDGE OF THE SEARCH AREA IS COVERED. NO ABM/PROBABLE LONG RANGE SAM ACTIVITY :OBSERVED. IN CLOUD-FREE AREAS. KOMAROV SUSPECT MISSILE SEARCH AREA ZALARI SUSPECT ICBM :COMPLEX AND ITS =FUNCTION REMAINS U CONSTRUCTION HAS OCCURRED,THE RATE.OF CONSTRUCTION IS NOT AS RAPID AS THAT AT ICBM COMPLEXES. NO EVIDENCE I S OBSERVED TO INDICATE THAT :THIS IS A MISSILE-RELATED FACILITY. 131 Handle Via Approved For Relea ,2A021D2/2~TC1,Ifr gIlTle96RO001003700011-1gENT-KEYHOLE SW Jtl, %A I OF Control System Only Handle Via TALENT?KEYJ b roved For ReleaseqD0/U~gTTCr -RDP99TOF1~96R000100370001-2 . Control System Only TCS-80337!67. KH-4 :MISSION 1041, 10-23 MAY :1987 25X1A KOMAROVSKIY SUSPECT MISSILE SEARCH THE SEARCH AREA IS 95 PERCENT CLOUD FREE AND 10 PERCENT CLOUD FREE ACTIVITY OBSERVED. KHARKOV; ABM SEARCH THE ENTIRE SEARCH AREA IS COVERED ON ?.PHOTOGRAPHY WITH WEATHER RANGING FROM CLEAR TO .HEAVY CLOUD COVER. NO MOSKVA-TYPE ABM. ACTIVITY :OBSERVED IN CLOUD-FREE AREAS. DONETSK ABM SEARCH UR 48.0ON O3747E NO MOSKVA-TYPE ABM ACTIVITY OBSERVED. SVERDLOVSK :ABM ,SEARCH UR 5650N 06030E NO MOSKVA-TYPE ABM' ACTIVITY OBSERVED. ROSTOVABM/PROB LONG RANGE SAM SEARCH UR 4714N 03942E WPM, THE WESTERN THREE QUARTERS OF :.THE SEARCH RED ON PHOTOGRAPHY.. 132 Handle Via Approved For R e l e a s T d r p f lft C l 9 Ti3tf96R000100370001IJLENT-KEYHOLE Control System Only Handle Via Tpfc o%g7T c ~ ~T0 TALENT-KEY roved For Release 00 9 396R000100370001-2 Control System Only TCS-80337/67 KH-4 MISSION 1041,. ?10-23 MAY ,1967 THE ENTIRE SEARCH AREA-IS COVERED ON PHOTOGRAPHY WITH APPROXIMATELY 90 PERCENT CLOUD COVER. THE WESTERN HALF ? OF ::THE SEARCH AREA I S COVERED ON PHOTOGRAPHY WITH HEAVY ' CLOUD COVER. NO ABM/PROBABLE LONG RANGE SAM ACTIVITY OBSERVED IN CLOUD-FREE AREAS. 25X1A NORDVIK HEN HOUSE SEARCH UR 7402N 11132E THE ENTIRE 50-NM SEARCH AREA IS CO.VERED.ON PHOTOGRAPHY. ONLY 'APPROXIMATELY 50 PERCENT OF THE AREA IS OBSERVED DUE TO HAZE AND BLOWING'SNOW. NO HEN HOUSE CONSTRUCTION ACTIVITY IS OBSERVED. KRASNOVODSK ABM/PROB LONG RANGE SAM SRCH UR 400ON 053000E NO ABMIPROBABLE LONG RANGE SAM:COMPLEXES OBSERVED. DNEPROPETR.OVSK ABM SEARCH UR 4828N 03502E NO MOSKVA-TYPE ABM ACTIVITY: IDENTIFIED IN CLOUD-FREE AREAS. KIYEV ABM SEARCH UR 5027N 03.0.30E NO MOSKVA-,TYPE ABM ACTIVITY OBSERVED. 133 Handle Via Approved For Releas~~~ TCMfMVeF 6R000100370 011T ENT-KEYHOLy trol System only Handle Via ~(Ip ZAZ TC:TA W TALENT-KE11>aq~rproved For Releas 0 fb t 11 a p9 1 968000100370001ics_a Control System Only KH-4 'MISSION 10419. 10-23 MAY 1967 GORKIIY ABM SEARCH 337/67 25X1A AMOERMA HEN HOUSE SEARCH UR 6945N 06139E THE EASTERN 80 PERCENT OF THE SEARCH AREA IS COVERED ON 95 PERCENT CLOUD-COVERED PHOTOGRAPHY. THE EASTERN HALF.OF.THE SEARCH AREA IS COVERED ON 75 PERCENT CLOUD-COVERED PHOTOGRAPHY. NO EVIDENCE OF , HEN HOUSE CONSTRUCTION ACTIVITY OBSERVED IN CLOUD-FREE AREAS. VORKUTA HEN HOUSE SEARCH UR 6730N 06400E NO EVIDENCE OF HEN HOUSE CONSTRUCTION ACTIVITY OBSERVED. NIKOLAYEVSKHENHOUSE SEARCH UR 5308N 14040E NO ACTIVITY RELATED TO HEN HOUSE CONSTRUCTION I OBSERVED. PETRUZAVOD K ABM/PROS LONG RANGE SAM SRCH UR 6150N 03418E NO 'ABM/PROBABLE LONG RANGE SAM LAUNCH COMPLEXES OBSERVED IN CLOUD-FREE AREAS. Handle Via Approved For ReleastdfptQtftlCtll fdf f96R00010037000nt roEi Syst Em Only Handle Via TOP JJ&Bg: ~IA99~0~ TALENT-KEYHPI~proved For Release 0 ~1 396R000100370001- CS-80337/67 Control System Only 25X1 A KH-4 MISSION 1041, ?10-23 MAY 167 25X1 D IVANOVO ABM/PROS LONG RANGE SAM SEARCH UR 570ON 04059E THE ENTIRE SEARCH AREA IS COVERED ON PHOTOGRAPHY WITH WEATHER CONDITIONS RANGING FROM HEAVY CLOUDS TO CLEAR. NO ABM/PROBABLE LONG RANGE SAM COMPLEXES OBSERVED IN CLOUD-FREE. AREAS. SOCHI-ABM/PROB?LONG RANGE SAM SEARCH UR 4335N 03945E NO ABM/PROBABLE LONG RANGE SAM COMPLEXES OBSERVED. 25X1 D 25X1 D KALININGRAD ABM/PROB.LONG RANGE SAM SEARCH UR 5445N 0203.0E THE EASTERN 60 PERCENT OF-:THE SEARCH AREA IS COVERED ON PHOTOGRAPHY WITH 1.0-20 PERCENT CLOUD COVER. NO ABM OR PROBABLE LONG RANGE SAM ACTIVITY OBSERVED. OLENEGORSKAMM/PROB LONG. RANGE SAM SEARCH UR 6808N 03318E THE ENTIRE SEARCH AREA IS COVERED ON PHOTOGRAPHY WITH APPROXIMATELY .60 PERCENT CLOUD COVER. NO ABM OR PROBABLE LONG RANGE SAM LAUNCH COMPLEXES OBSERVED. 25X1 D 25X1 D MUR.MANSK`'ABM/PROB LONG RANGE SAM SEARCH UR 6858N 03305E THE NORTHERN QUARTER OF THE SEARCH AREA IS RFFFIHOTOGRAPHY WITH HEAVY CLOUD. COVER. 25X1D THE ENTIRE SEARCH AREA IS COVERED ON ITH APPROXIMATELY 40PERCENT CLOUD COVER. NO ABM OR PROBABLE LONG RANGE SAM LAUNCH COMPLEXES OBSERVED. 135 Handle Via Approved For Relea 2A11?~:~~ J =_ LAL-P c 196R00010037000' NT-KEYHOLE 11'' )>~'_~ Control System Only Handle Via TALENT-KEYH&Pproved For ReleaIPE00f1- T- WH3PMFf396R000100370001-2 Control System Only TC5-833716 ~ KH-4 'MISSION 1041v:10-23 MAY 1967: 25X1A YAKUTSKHEN HOUSE SEARCH UR 6205N 12944E THE NORTHERN 90 ::PERCENT OF 'THE SEARCH AREA IS COVERED ON PHOTOGRAPHY WITH 20 :PERCENT CLOUD COVER. NO EVIDENCE OF ;HEN HOUSE CONSTRUCTION ACTIVITY OBSERVED. TIKSI HEN HOUSE SEARCH UR 7138N.12851E THE NORTHERN 95 PERCENT OF.THE SEARCH AREA IS COVERED ON PHOTOGRAPHY WITH 50PERCENT CLOUDCOVER. NO EVIDENCE OF HEN HOUSE CONSTRUCTION ACTIVITY OBSERVED'IN CLOUD-FREE AREAS. ODESSA PROS LONG RANGE SAM SEARCH UR 4629N 03044E NO LONG RANGE SAM ACTIVITY OBSERVED: IN CLOUD-FREE AREAS. NOVOROSSIYSK PROB LONG RANGE SAM SEARCH UR 4443N 03747E THE ENTIRE SEARCH AREA IS COVERED ON PHOTOGRAPHY WITH HEAVY CLOUD COVER. APPROXIMATELY 90 PERCENT OF THE SEARCH AREA: IS.COVERED ON CLOUD-FREE PHOTOGRAPHY. NO PROBABLE LONG RANGE SAM ACTIVITY OBSERVED. TUAPSE PROS LONG RANGE SAM SEARCH UR 4405N 03905E THE EASTERN HALF OF:THE SEARCH AREA IS CLOUD COVERED. NOPROBABLE LONG:RANGE SAM ACTIVITY OBSERVED IN THE 136 Handle Via Approved For Release 2002/02/27: CIA-RDP99T01396R000100370001A1aNT-KEYHOLE TOP SECRET CHESS RUFF Control System Only Handle Via pp roved For ReleaWROWRf : EW P 5396R000100370001- TALENT-KEYHUL'rpCS-80337/67 Control System Only KH-4 `MISSION 1041,. 1t-23 MAY 1967 WESTERN HALF OFTHE SEARCH AREA. 25X1 D ZAPOROZHYE PROS LONG RANGE SAM SEARCH UR 4750N 03508E NO PROBABLE LONG RANGE SAM ACTIVITY OBSERVED. 25X1 D 25X1 D 25X1 D SARATOV PROS LONG RANGE SAM SEARCH UR 5132N 04600E NO:PROBABLE LONG:RANGE SAM ACTIVITY: OBSERVED. KAMYSHIN PROS LONG RANGE SAM SEARCH UR 4208N 04140E THE ENTIRE SEARCH AREA IS COVERED WFRW HY WITH HEAVY CLOUD COVER. 25X1 D THE WESTERN HALF OF" HE SEARCH AREk' IS pop.= NO'. PROBABLE LONG RANGE SAM ACTIVITY :OBSERVED' IN CLOUD-FREE AREAS. 25X1 D 25X1 D POTI PROS LONG RANGE SAM SEARCH UR 4208N 041.40E THE ENTIRE 25-NM RADIUS SEARCH AREA-:IS COVERED ON PHOTOGRAPHY WITH APPROXIMATELY 20 PERCENT CLOUD COVER. NO=PROBABLE LONGRANGE SAM ACTIVITY OBSERVED:IIN CLOUD-FREE. AREAS. 25X1A 137 Handle Via Approved For Rele 0 0 7 : EA-RDP99TO1396R00010037000(~t?NT-KEYHOLE ~~ SC THESS RUFF Control System Only Handle Via T r u ALEN T-KEYHd~pproved For Relea5~~0 C~('QfT: 'A PQ~ 01 ~'~p 396R000100370001-2 Control System Only TCS-80337/67 KH-4 MISSION 1041, 10-23 MAY 1967 25X1A SEVERODVINSK NAVAL BASEAND SHIPYARD 402 UR 6434N.03949E 25X1D ?B :AT FITTING--OUT :QUAY MAIN YARD -- 1 PR .:B U-CLASS SUBMARINE, 1 UNIDENTIFIED LARGE SUBMARINE: I PROBABLE.N-CLASS SSN IN FLOATING DOCK PARALLEL?TQ THE QUAY, 1 UNIDENTIFIED SUBMARINE IN THE FLOATING DOCK=PERPENDICULAR TO THE QUAY, 3 RECTANGULAR SUPPORT.BARGES,3 UNIDENTIFIED PROBABLE AUXILIARIES, AND 5 UNIDENTIFIED SMALL CRAF'T. AT THE WEST =BASIN --:,I PROBABLE J=CLASS SSG, 1 TRANSPORTER DOCK* 20 UNIDENTIFIED SMALL VESSELS* AND 8 SMALL CRAFTON THE QUAY. AT THE NUCLEAR SUBMARINE SPECIAL SUPPORT FACILITY:-- 1 POSSIBLE:.H-CLASS..SSBN,,I ZEYA-CLASS YRSN, AND 1 RECTANGULAR SUPPORT BARGE. AT THE NAVAL. BASE PIERS-- 6 SMALL.VESSELS AND 1YAGT. AT THE YAGRY ISLAND REPAIR FACILITY -- 1.POSSIBLE H-CLASS SSBN9:' i POSSIBLE G-CLASS SS89 1_ UNIDENTIFIED SUBMARINE, AND.2 RECTANGULAR SUPPORT BARGES. IN THE WET : DOCK, AND 1 ,LARGE UNIDENTIFIED SUBMARINE, 2POSSIBLE G-CLASS SSB, 2 UNIDENTIFIED MEDIUM SUBMARINES, 1 BUSSARD-CLASS AKL, 1 APL,.1.YAGT,AND 2 .RECTANGULAR. SUPPORT BARGES AT THE QUAYS. AT THE EAST~QUAY.:-- 1 CATAMARAN-TYPE VESSEL :-2 PROBABLE AUXILIARIES, ' 1..:LARGE FLOATINGCRANE, AND 3 UNIDENTIFIED SMALL VESSELS. AT THE UNIDENTIFIED FACIL?TY...JUST.NORTH OF THE LAUNCH BASIN GATE. -- `1 .UNIDENTIFIED AUXILIARY. 25X1D HE MAIN LAUNCH.BASIN:IS FLOODED AND THE GATE AN UNIDENTIFIED VESSEL (NOT A.SUBMARINE) IS IN THE SW CORNER OF 'THE BASIN, TWO PROBABLE DE MEDITERRANEAN-MOORED IN THE WEST-BASIN ARE THE ONLY APPARENT 08 CHANGE. A NEW PIER IS UNDER CONSTRUCT?ON JUST NORTH OF THE MAIN LAUNCH BASIN GATE. 25X1 D 25X1A SEVEROMORSK?NAVAL MISSILE STORAGE UR 6905N 03330E NO NEW CONSTRUCTION,, CHANGES IN FACILITIES,OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 25X1 D 138 Handle Via Approved For Relea q''II En ~RUUrrr T to QP 1396R000100370001APT-KEYHOLE Control System Only Handle Via TALENT -KEY AVlproved For Releas'e`70Ac T &N$4A1ff396R000100370001 Control System Only-$433767 KH-4 MISSION 1041:, 10-23 MAY`1967 25X1A POSSIBLE DD. RDLOV-CLASS CL 6 DO, 3 PROBABLE DE: I P 4 . .... .... ASR, `AND. 4 UNIDENTIFI"ED' SURFACE VESSELS. NO 25X1A MOSKVA:ABM LAUNCH COMPLEX E33 UR 5620N 03648E NO SIGNIFICANT CHANGES OBSERVED IN CLOUD-FREE AREAS. MOSKVAABMLAUNCH COMPLEX E24 UR 5521N 03629E AT TRIAD 1, NO'CHANGE IS OBSERVED ON THE COMPLETED EXTERIORS OF THE BUILDINGS. CONSTRUCTION CONTINUES ON ALL 8 :LAUNCH POSITIONS. AT TRIAD 2, CONSTRUCTION ON THE RADOMES HAS NOT BEGUN, NOR I S THERE ANY INDICATION OF LAUNCH POSITION CONSTRUCTION. IN THE SUPPORT AREAv CONSTRUCTION CONTINUES ON THEMULTISTORY APARTMENT-TYPE BUILDINGS. NO MISSILES CAN BE IDENTIFIED WITHIN THE COMPLEX. MOSKVAABM LAUNCH COMPLEX E15 UR 5509N 03822E NO.RESUMPTION OF ACTIVITY IS DISCERNIBLE AT.THE COMPLEX. NO MISSILESCAN BE IDENTIFIED WITHIN THE COMPLEX. MOSKVA SAM SITE C30-1 UR 5556N 03655E NO MISSILES, MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 148 Handle Via Approved For ReleaMfM .J h qfP T t396R00010037000 NT-KEYHOLE ~~--JJJJ ~RUU Control System Only Handle Via TOP JJ~Bg: ~f, 5~ &411 TALENT-KEYHQk?proved For Release P 01396R000100370001-FCS_6 337/67 Control System Only KH-4 ,:MISSION 1041, 10-23 MAY 1967, 25X1 A MOSKVAABM LAUNCH COMPLEX E31 UR 5607N 03629E NO SUBSTANTIAL PROGRFSS IS fISCERNIBLE AT`THE COMPLEX 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D TIDOES NOT APPEAR THAT :GUN. A NEW RECTANGULAR FLAT-ROOFED BUILDING,PROBABLY BEGUN IS PARTIALLYCOMPLETED IN THE ON--SITE S R THE ENTRANCE TO THE COMPLEX. THE FENCE LINE ON THESE SIDE OF :THE LAUNCH AREA HAS BEEN RELOCATED TO ENCLOSE A LARGER AREA WITHIN THE DOUBLE-SECURED AREA OF THE COMPLEX. HEAVY CLOUDS OBSCURE THE=PORTION OF THE SUPPORT AREA CONTAINING THE MULTISTORY APARTMENT-TYPE BUILDINGS. NOCHANGE.IS DISCERNIBLE: IN THE CLOUD-FREE PORTIONS OF THE SUPPORT AREA. NO MISSILES CAN BE IDENTIFIED WITHIN THE COMPLEX. MOSKVA SAM SITE C28-1 UR 5549N 03652E NO MISSILES, MISSILE-RELATED EQUIPMENT. NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY: UNREPORTED FEATURES OBSERVED. MOSKVAABM LAUNCH COMPLEX E03 UR 5622N 03811E NO SIGNIFICANT CONSTRUCTION PROGRESS IS APP R h HE COMPLEX SINCE ITWAS LAST OBSERVED THERE IS NO ACTIVITY .; D DIC TE THAT CONSTRUCTION HAS.=COMMENCED. NO MISSILES OR MISSILE-RELATED EQUIPMENT CAN BE IDENTIFIED WITHIN THE COMPLEX. Handle Via Approved For Relea 0~ T ~1 9R9~T 396R000100370pO I NT-KEYHOLE ontrol"System Only Handle Via TALENT l(~p C~('g~ &C~ (~~ ~~ -KEV1~Qbproved For Releas 0 ~/ C [f 9~`I`~ 96R000100370001~C~~~~ Control System Only KH-4 MISSION 1041, 10-23 MAY 1967 MOSKVA :ABM LAUNCH COMPLEX E21 UR 5504N 03701E TRIAD 1 THE SUPERSTRUCTURES OF BUILDINGS A AND :C APPEAR TO BE IN THE MID-STAGE OF CONSTRUCTION- ERECTION OF THE SUPERSTRUCTURE FOR BUILDING B MAY HAVE BEGUN. TRIAD 2 -- SOME ACTIVITY IS EVIDENT IN THE CLEARINGS FOR BUILDINGS A AND C9 BUT ERECTION OF THE SUPERSTRUCTURES DOES NOT APPEAR TO.BE UNDERWAY. IN THE SUPPORT"AREA,4 MULTISTORY APARTMENT-TYPE BUILDINGS APPEAR TO BE COMPLETE AND CONSTRUCTION OF ANOTHER.HAS BEGUN. NO MISSILES CAN BE IDENTIFIED WITHIN THE COMPLEX. LENINGRAD PROB LR SAM'LCH CPLX SEARCH UR 5955N 03020E NO NEW OR PREVIOUSLY UNREPORTED AAM/SAM. LAUNCH OR ELECTRONIC FACILITIES OBSERVED IN CLOUD-FREE PORTIONS OF THE SEARCH AREA. LENINGRAD NE PROS LONG RANGE SAMLCH CPLX UR 604N 03043E NO SIGNIFICANTCHANGE IS DISCERNIBLE N THE VISIBLE PORTION AR EXCAVATIONS, NOT.PRESENT- ARE ALONG THE WESTERN EDGE OF THE ROAD LEADING FROM THE SUPPORT FACILITY TO THE LAUNCH AREA. ONE IS WITHIN THE LOOP ROAD SERVING THE DRIVE-THROUGH BUILDING. AT LEAST 4 OF THE 5 RADAR POSITIONS ARE OCCUPIED AT THE TRACKING/GUIDANCE FACILITY, NO MISSILES ARE IDENTIFIABLE AT THE COMPLEX. 37/67 25X1A 150 Handle Via IWE Approved For ReleaV0 WRTCJ~ g9-Uo096R00010037000ntrol System Y HOLE Only Handle Via TOP ~2f27rT 4AiRD 9I~FF TALENT -KEYINN4,roved For Release 200 C 9 1396R000100370001*5_ Control System my KH-4 MISSION 1041, 10-23 MAY 1967 LENINGRAD SW PROS LONG RANGE SAM LCH CPLX UR 5943N 02918E MODIFICATION OR RENOVATION OF MISSILE-READY BUILDINGS IS UNDERWAY AT LAUNCH POSITIONS A-1, A-4, AND A?6 AND AT EACH LAUNCH POSITION OF SITES B AND C. SMALL SCALE PHOTOGRAPHY PRECLUDES DETERMINING THE NATURE OF THIS ACTIVITY WHICH IS APPA'RENTLY:CONCENTRATEDON THE ROOFS OF TH B GS. SIMILAR ACTIVITY; OBSERVE' AT MISSILE-READY BUILDINGS OF POSITIONS B?-19 :E-1s E-2, E-39 E-4, AND E-5 WAS REPORTED AS CAMOUFLAGING. A NEW BUILDING IS UNDER CONSTRUCTION NEAR THE ENTRANCE TO THE COMPLEXv JUST WEST -OF THE BARRACKS AREA. AN EXTENSION IS UNDER CONSTRUCTION TO ,THE BUILDING SITUATED .ALONG THE LAUNCH AREA MAI SITE C. ADDITIONAL TREE CLEARANCE -IS OBSERVED BETWEEN THE TRACKING/GUIDANCE FACILITY AND THE LAUNCH AREA. NO MISSILES ARE IDENTIFIABLE AT=THE COMPLEX. BRATSK SUSPECT.ABM AREA NO ABM/PROBABLE LONG RANGE SAM COMPLEXES OBSERVED. TALLINN PROB LONG RANGE SAM LCH CPLX UR 5924N 02419E SIGNIFICANT CHANGE OBSERVED AN UNDETERMINED NUMBER OF VEHICLES/PIECES OF EQUIPMENT IS ON THE APRON SERVING THE 2.REVETTED MISSILE/MISSILE COMPONENT STORAGE BUILDINGS AT THE SW CORNER OF THE MISSILE HANDLING FACILITY. SMALL SCALE PRECLUDES: IDENTIFICATION OF MISSILES AT THE COMPLEX. NO SIGNIFICANT CHANGE OBSERVED AT THE AIR WARNING RADAR FACILITY OR AT'2 ASSOCIATED UNIDENTIFIED AREAS 3.5 NM SE OF THE LAUNCH COMPLEX. 0337/67 25X1A Handle Via Approved For ReleasTdrp ttf&~Cy @I~9 T(~f f96R000100370001tJLENT-KEYHOLE JJ ~.nLJJ Control System Only Handle Via PZ c T AW TALENT?KEYHAI~iproved For ReleaS 0 396R00010037000'LS_80337~~.I Control System Only KH-4 MISSION 1041, 10-23 MAY 1967 25X1A CHEREPOVETS PROS LONG RANGE SAM LCH CPLX UR 5906N 03810E TREE REMOVAL HAS OC' R D WITHIN LAUNCH SITE 8 A DITCH OBSERVED UNDER EXCAVATION EX VICINITY OF LAUNCH SITES B AND CvBY-PASSING THE TRACKING/GUIDANCE FACILITY9 AND TERMINATING NEAR A POWER LINE APPROXIMATELY 7,200 FT SOUTH OF THE LAUNCH AREAS NOW APPEARS COMPLETE. A POSSIBLE TRANSFORMER SUBSTATION IS LOCATED AT THE SOUTHERN TERMINUS OF THIS DITCH. NO.MISSILES ARE IDENTIFIABLE AT THE COMPLEX. THE AIR WARNING RADAR FACILITY 4 NM WNW OF THE LAUNCH COMPLEX IS OCCUPIED. LIEPAJA PROB LONG RANGE SAM LC:H CPLX UR 5633N 02110E NO SIGNIFICANT CHANGE OBSERVED AT THE COMPLEX EXCEPT THAT RADAR O U ONS OF THE TRACKING/GUIDANCE FACILITY. A PORTION OF THE MISSILE-HANDLING FACILITY I S CLOUD COVERED. NO SIGNIFICANT CHANGE OBSERVED AT THE AIR WARNING RADAR FACILITY 2 NM NE OF THE LAUNCH COMPLEX OR AT THE 2 UNIDENTIFIED AREAS ASSOCIATED WITH THE FACILITY. NIZHNYAYA.TURA PROS LR SAM LAUNCH CPLX UR 5847N 05953E NO MISSILES, MISSILE--RELATED EQUIPMENT, NEW CONSTRUCTIONS CHANGES IN FACILITI.ES,OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. 152 ~q~~}Qpg~~p Handle Via Approved For ReleaMfO 7r l,t'ICJJ I(U1' 396R00010037000IIA4NT?HEYHOLE Control System Only Handle Via TAIENT?KEYHA~pproved For ReleaS 0 '~b+p 396R000100370001*.5_$0337/bT Control System Only KH-4 'MISSION 1041, 10-23 MAY.1967 25X1 A KIMRY PROB LONG: RANGE SAM LCH CPLX UR 5646 03720E CLOUDS COVER SITE A PART -OFTHE TRACKING/GUIDANCE FACILITY, AND THE AIR WARNING SITE. NO CHANGES ARE OBSERVED IN CLOUD-FREE AREAS OF :THE COMPLEX - MURASHI PROB LONG RANGE SAM LCH CPLX UR 5927N 04849E SINCE PREVIOUS CLEAR COVERAGE -1 BUILDING CORRESPONDING E OF .: HE 2 MISSILEIMISSILE COMPONENT STORAGE BUILDINGS AT TALLINN AND 2 BUILDINGS CORRESPONDING TO THE CHECKOUT/ASSEMBLY BUILDINGS ALSO SEEN AT TALLINN ARE NEWLY.IDENTIFIED WITHIN THE MISSILE HANDLING FACILITY, NEW, UNIDENTIFIED ACTIVITY IS OBSERVED EAST AND ADJACENT TO THE ABOVE FACILITY. ONE NEW BUILDING IS OBSERVED WITHIN THE SUPPORT AREA. TWO OF THE 3 RADAR POSITIONS NOW APPEAR TO BE OCCUPIED. NO MISSILES OBSERVED. KALININ PROB LONG RANGE SAM LCH CPLX UR 5637N 03552E BUILDINGS HAVE BEEN REA, BRINGING TO 10 THE TOTAL OF BUILDINGS IN THIS AREA. TREES HAVE BEEN REMOVED AND AND 3 ADDITIONAL BUILDINGS=HAVE.BEEN CONSTRUCTED IN THE MISSILE-HANDLING FACILITY. ALL POSITIONS IN THE LAUNCH AREA ARE REVETTED AND ... CONSTRUCTION IN THIS AREA APPEARS TO BE VIRTUALLY COMPLETEo ALL LAUNCH POSITIONS AT SITES A AND C :ARE OCCUPIED BY LAUNCHERS AND DOLLIES. CABLE SCARS CAN BE IDENTIFIED AT. SITE A EXTENDING FROM THE CENTRAL-:CONTROL REVETMENT TO LAUNCH POSITIONS It 2, 3,.4, AND 6.. AT SITE C CABLE SCARS EXTEND FROM THE CENTRAL CONTROL REVETMENT TO ALL 6 LAUNCH POSITIONS. APPROXIMATELY 20 UNIDENTIFIED OBJECTS ARE BETWEEN SITES A AND B NEAR THE LAUNCH AREA MAIN ROAD. TWO OF THE 3 POSITIONS IN THE TRACK?INGIGUIDANCE FACILITY ARE OCCUPIED BY RADAR. NO MISSILES ARE DISCERNIBLE. Handle Via Approved For Relea~ fP 7T. bqPWafj396R000100370001AIINT-KEYHOLE Control System Only Handle Via TALENT-KEYHt#tipproved For Relea 0 396R0001003700015_$8337/E7 Control System Only KH-4 MISSION 10419 10-23 MAY 1967 BABAYEVO;PROB LONG RANGE SAM LCH CPLX UR 5933N 03520E NO MISSILES OR MISSILE-RELATED EQUIPMENT ARE OBSERVED AT THE COMPLEX. CONSTRUCTION CONTINUES ON THE 3 LAUNCH SITES WITH PROGRESS APPARENT ON THE LAUNCH POSITIONS AND TREE CLEARANCE APPARENT THE LAUNCH SITES AND 111t [KALKING/GUIDANCE FACILITY ARE IN THE MID-STAGE OF CONSTRUCTI ADDITIONAL BUILDINGS RLY STAGE OF CONSTRUCTION AND.NEW GRADED. AREAS AND TREE CLEARANCE ARE OBSERVED IN: THE SUPPORT' AREA. A BUILDING IS NEWLY OBSERVED UNDER CONSTRUCTION NORTH OF THE LAUNCH AREA MAIN ROAD BETWEEN SITES B AND Ce.. AN AREA CONSISTING OF A RECTANGULAR BUILDING AND GROUND SCARRING APPROXIMATELY 3 NM SE OF-THE LAUNCH COMPLEX MAY BE AN AIR WARNING RADAR FACILITY IN AN EARLY STAGE OF CONSTRUCTION. . FEODOSIYA P'ROB LONG RANGE SAM LCH CPLX UR 4509N 03543E NO APPARENT CHANGE:IS OBSERVED 0 CHANGEIS DISCERNIBLE THE HEAVILY CLOUD-COVERED AIR WARNING RADAR FACILITY. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. PLESETSK PROB LONG RANGE SAM LAUNCH CPLX UR 6312N 04109E THE COMPLEX REMAINS IN TH THE MOST SIGNIFICANT ITEM OBSERVED IS A SECURED9 POSSIBLE AIR WARNING RADAR FACILITY APPROXIMATELY.5 NM SOUTH OF THE COMPLEX. AT THE COMPLEX9 LAUNCH SITES A AND C APPEAR TO BE. IN A SLIGHTLY MORE ADVANCED STAGE OF CONSTRUCTION THAN SITE B SINCE RAILS/RAIL BEDS ARE DISCERNIBLE AT=LAUNCH POSITIONS A2 THROUGH A6 AND AT ALL LAUNCH POSITIONS AT 25X1A ~Ig C~P Handle Via Approved For Re1ea&a_2fl k2=J27 T lit CJJ Ug196R000100370001MZNT-KEYHOLE T UT ))~~t_M Control System Only Handle ia TALENTVKEYHAIpproved For ReleaIP?O )"1'0'2'/' T &0-`RbP99Y01396RO0010037000'f ZS-80331/61 Control System Only KH-4 MISSION 1041, 10-23 MAY 1967 SITE C. LAUNCH POINTS ARE OBSERVED AT SITE B AND RAIL BED CONSTRUCTION IS APPARENT AT ALL LAUNCH POSITIONS EXCEPT 85 WHERE NO RAIL BED CONSTRUCTION HAS BEGUN. AT EACH LAUNCH SITE, EACH LAUNCH POINT APPEARS TO BE CONNECTED BY CABLE TO THE CONTROL CENTER. NO APPARENT CHANGE: IS OBSERVED AT EITHER THE TRACKING/GUIDANCE FACILITY OR THE SUPPORT AREA. AT THE MISSILE-HANDLING FACILITY, ONE 120- X 80-FT BUILDING APPEARS EXTERNALLY :COMPLETE AND THE OTHER 120- X.80-FTBUILDING IS NEARING COMPLETION. A SMALLER BUILDING IS UNDER CONSTRUCTION ALONG THE MISSILE-HANDLINGSERVICE ROAD. A LARGE POSSIBLE BUILDING IS UNDER CONSTRUCTION BEHIND SITE B.. TWO UNIDENTIFIED STRUCTURES ARE LOCATED NEAR THE TRACKING/GUIDANCE FACILITY AND ARE CONNECTED BY :A TRACE CUT THROUGH THE WOODS. ONE STRUCTURE IS WITHIN THE COMPLEX SECURED 'AREA AND THE OTHER IS OUTSIDE THE FENCED AREA. 25X1A THE FOLLOWING CHANGES ARE OBSERVED ANOTHER BUILDING HAS BEEN CONSTRUCTED APPROXIMATELY.900 FT WEST OF LAUNCH SITE B :'ADJACENT TO THE BUILDING IDENTIFIED THE POSSIBLE TEMPORARY; SUPPORT FACILITIES BETWEEN LAUNCH SITES B AND C? THOUGHT.ITO HAVE BEEN TENTS, HAVE NOW BEEN REMOVED. AN UNDETERMINED NUMBER OF VEHICLES/PIECES OF EQUIPMENT; IS PARKED NW OF LAUNCH SITE B. HEAVY TRACK ACTIVITY IS OBSERVED WEST OF':THE LAUNCH AREA AND BETWEEN THE LAUNCH AREA AND TRACKING/GUIDANCE FACILITY. PILES OF MATERIAL, PROBABLY FOR ROAD SURFACING, ARE STORED ADJACENT TO THE.SERVICE ROAD NEAR THE CENTRAL. CONTROL = REVETMENT OF THE TRACKING/GUIDANCE FACILITY. NO MISSILES ARE.DISCERNIBLE0 Handle Via Approved For Relea 0~f02 T Tkfff 9JT.Qa'V396R00010037000TA2ENT?KEYHOLE U CE KKtt urr Control System Only Handle Via P (? T 9-`Ki7JWtf TAIEN T?KEYHUproved For Relea 0 396R000100370001T:tS-80337/6?7 Control System Only KH-4 MISSION 10411:10-23 MAY 1967 25X1A 25X1 D VOLGOGRADPROB LONG RANGE SAM LCH CPLX UR 4821N 04417E NO APPARENT CHANGE::.IS DISCERNIBLE AT THE COMPLEX OR THE AIR WARNING RADAR FACILITY. ANGARSK PROB LONG RANGE SAM LAUNCH CPLX UR 5242N 10402E CONSTRUCTION CONTINUES AT THE TRACKING/GUIDANCE FACILITY AND AIR WARNING FACILITY WITH NO SIGNIFICANT CHANGE OBSERVED. TWO MISSILE ASSEMBLY/CHECKOUT BUILDINGS.ARE NEWLY IDENTIFIED UNDER CONSTRUCTION AT THE MISSILE-HANDLING FACILITY WHILE AN AREA OF UNIDENTIFIED CONSTRUCTION ACTIVITY IS JUST :EAST OF THE FACILITY.. AT LEAST :7 BUILDINGS,:6 NEWLY IDENTIFIED, ARE UNDER CONSTRUCTION IN THE CLEARED AREA NE ?F LAUNCH SITE A.. AT LEAST3 ADDITIONAL BUILDINGS ARE ALSO NEWLY IDENTIFIED IN CLEARINGS ADJACENT TO THE SUPPORT AREA AT THE NORTHERN EDGE QF THE COMPLEX. TREE CLEARANCE'IS NOW UNDERWAY FROM LAUNCH SITE C TOWARD THE TRACKING/GUIDANCE FACILITY. NO MISSILES OR MISSILE-RELATED EQUIPMENT DISCERNIBLE. THE UNIDENTIFIED FACILITY 3.5 NM SOUTH OF THE PROBABLE LONG RANGE SAM COMPLEX AT 52--38-.50N 104-02-10E (REPORTED.IN CABLE CITE NPIC 0598 AS PROBABLY ASSOCIATED WITH THE AIR WARNING FACILITY) IS.NOW BELIEVED TO BE NOT SIMILAR TO THOSE UNIDENTIFIED AREAS SOMETIMES FOUND ASSOCIATED.WITH PLRS BACK NET/SIDE NET FACILITIES. THIS.UNIDENTIFIED FACILITY IS REPORTED SEPARATELY AS THE UST-BALE' UNIDENTIFIED FACILITY.(SEE BONUS 3, OTHER ACTIVITY).: 25X1 D KRASNOYARSK PROB LONG RANGE SAM LCH CPLX UR .5634N 09320E CONSTRUCTION OF BUILDINGS WITHIN THE SUPPORT AREA CONTINUES. AT LEAST 2 SMALL STRUCTURES ARE NEWLY IDENTIFIED ON THIS MISSION. REVETMENTS ARE NOW PROBABLY PRESENT AT LAUNCH POSITIONS A-3 AND C-3. ACCESS.AND SERVICE ROADS NOW APPEAR TO BE SURFACED EXCEPT AT LAUNCH POSITIONS A-3, 'C-4, AND AT LAUNCH SITE B. CONSTRUCTION OF .THE CENTRAL ETMENTS HAS 25X1D PROGRES~ED A POSSIBLE 25X1A Handle Via Approved For Relea (?WT to t1396R000100370001 NT?KEYHOLE toff ter Burr Control System Only Handle TAEENTVKEYH4Eproved For Releale"T002~0~{TA'-R49gF0396R000100370001f33T/fir Control System Only KH-4 MISSION 1041910-23 MAY ? 1967 BUILDING IS NEWLY IDENTIFIED UNDER CONSTRUCTION WITHIN THE MISSILE-HANDLING FACILITY AND ADJACENT TO A NEWLY IDENTIFIED LOOP ROAD LOCATED NORTH OF LAUNCH SITE S. CONSTRUCTION OF THE CENTRAL CONTROL AREA AT TH TRACKING/GUIDANCE FACILITY HAS PROGRESSED 25X1A TOMSK PROS LONG RANGE SAM LAUNCH COMPLEX UR 5636N 08433E CONSTRUCTION CONTINUES WITH 2 NEW STRUCTURES IDENTIFIED IN THE MISSILE-HANDLING FACILITY AND 1 WITHIN. THE PROBABLE SUPPORT AREA. RAIL BEDS APPEAR TO BE PRESENT AT THE LAUNCH POSITIONS AT SITES B AND C. AN L-SHAPED CLEARING IS NEWLY IDENTIFIED BETWEEN SITES B AND C. NO MISSILES OR MISSILE-RELATED EQUIPMENT OBSERVED. KOSTROMAPROS LONG RANGE SAM LCH CPLX UR 5813N 04138E THE COMPLEX IS IN A LATE STAGE OF CONSTRUCTION OCCUPANCY OF LAUNCH SITES CANNOT BE DETERMINED EACH LAUNCH POS U D BY A:LAUNCHER AND 2 DOLLIES, TWO OF THE 3 RADAR POSITIONS AT THE TRACKING/GUIDANCE FACILITY ARE OCCUPIED ON ALL PASSES, AND EQUIPMENT IS OBSERVED IN THE CONTROL CENTER. THE PREVIOUSLY IDENTIFIED FOUNDATION ADJACENT-TO THE MISSILE-HANDLING FACILITY MAY BE 2. CLOSELY SPACED FOUNDATIONS. A SHORT, ELEVATED ROAD EXTENDS: SITE A THROUGH.THE INNER FENCE AND TERMINATES.AT THE OUTER FENCE. TWO SMALL BUILDINGS ARE. DISCERNIBLE'IN.THE MISSILE-HANDLING FACILITY. MOST OF THE TREES HAVE BEEN CLEARED BETWEEN THE LAUNCH SITES AND THE TRACKING/GUIDANCE FACILITY. ANEW BUILDING IS UNDER CONSTRUCTION BETWEEN THE COMPLEX AND THE ADJACENT SA-2 SITE. NO MISSILES OBSERVED. 157 Handle Via Approved For Release-20 /,0~(,2ZT C,ik fff 9ib$V96R0001003700Control 01ARE System (Y Only Handle Via lq O~T CI'R-RDP99T0I TNLENT-KEYHO46proved For Relea 0 396R000100370001Tt, 5-80337/67 Control System Only KH-4 MISSION 1041, 10-23 MAY :1967 25X1 A SHARYA PROS LONG RANGE SAM LAUNCH CPLX UR 5826N 04530E CONSTRUCTION CONTINUES AT THE COMPLEX. ADDITIONAL ROADS ARE NOW DISCERNIBLE WITHIN THE COMPLEX AREA AND AT LEAST 2 BUILDINGS UNDER CONSTRUCTION ARE NEWLY IDENTIFIED WITHIN A RECTANGULAR: CLEARING WEST OF THE COMPLEX. NO MISSILES OR MISSILE-RELATED EQUIPMENT DISCERNIBLE. PAO-TOU SAM SITE A05-2 THE. SITE CONSISTS OF :6 REVETTED/FENCED OCCUPIED LAUNCH POSITIONS (5 OCCUPIED BY PROBABLE MISSILE TRANSPORTERS)O THE CENTRAL GUIDANCE AREA IS REVETTED/FENCED AND. OCCUPIED BY APPROXIMATELY 10.; PIECES OF EQUIPMENT0 SITE SUPPORT FACILITIES CONSIST OF APPROXIMATELY 15.BUILDINGS,'50 TENTS* AND AN UNDETERMINED NUMBER OF PROBABLE MISSILE TRANSPORTERS AND. OTHER.ASSOCIATED VEHICLES/PIECES OF EQUIPMENT. PEI-CHING'SAM SITE B19-2 CH 3939N 11623E SITE CONSISTS OF 6 REVETTED LAUNCH POSITIONS, A REVETTED CENTRAL GUIDANCE AREA, AND3 MISSILE-HOLD POSITIONS, ALL PROBABLY UNOCCUPIED. PEI--CHING SAM SITE B26-2 CH 3951N 11609E SITE IS PROBABLY UNOCCUPIED AND APPEARS TO BE DETERIORATING. PEI-CHING AM.SITE 835-2 CH 4009N 11618E SITE CONSISTS OF6 REVETTED LAUNCH. POSITIONS,A REVETTED CENTRAL GUIDANCE AREA, -AND 2 MISSILE-HOLD POSITIONS, ALL PROBABLYUNOCCUPIED. Handle Via Approved For Relea-jM 2EQ2fI~~LC:7T VA,F-q~P 41396R00010037000 NT-KEYHOLE ff ~~~ICC~~. E575 1tUrrtt'' Control System Only Handle Via TOP ag T. 0 b 4~P TALENT?KEYHnpproved For Release 0 396R000100370001ft S_80337/67 Control System Only VU-4 MISSION 1041,:10-23 MAY 1967 25X1D 25X1A SITE IS PROBABLY 'UNOCCUPIED AND APPEARS TO BE DETERIORATING. 25X1 D 25X1 D SHUANG-CHENG-TZU MTC SAM SITE A12-2 CH 41-06N 10020E NO MISSILES, MISSILE-RELATED EQUIPMENT* NEW CONSTRUCTION9:CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES .. OBSERVED. FEODOSIYA SAM SITE A16-2 25X1 D GLAZOVSAM SUPPORT FACILITY UR 5806N 05240E THE UKRAINA-TYPE REVETMENT -ADJACENT TO THE 'FACILITY:; IS OCCUPIED BY '5 VEHICLES/PIECES OF EQUIPMENT. NO MISSILES., MISSILE-RELATED EQUIPMENT, NEW CONSTRUCTION9CHANGES IN FACILITIES* :OR PREVIOUSLY UNREPORTED FEATURES. OBSERVED. 25X1 D NOVOROSSIYSK:SAMSUPPORT FACILITY UR 4440N 03746E NO MISSILES OR MISSILE-RELATED EQUIPMENT "OBSERVED. CONSTRUCTION OF THE UKRAINA-TYPE`REVETMENT IS COMPLETE AND IT IS.UNOCCUPIED. NO OTHER NEW FEATURES OBSERVED. 25X1 D 159 Handle Via Approved For Releay M 'T P Tf1396R00010037000TI&NT-KEYHOLE Control System Only Handle TALENTVKEYHOOproved For Relea~S~~052'1b977 :'1AEI~L7P'9'C'0~1396R00010037000 i5-- 33 /6 h Control System Only KH-4 MISSION 10411.10-23 MAY 1967: 25X1 A SEVERODVINSK SAM SITE B02-3 SITE CONTAINS 4 LAUNCH POSITIONS, OCCUPANCY UNDETERMINED* THE CENTRAL GUIDANCE AREA: IS POSSIBLY OCCUPIED.... NO NEW CONSTRUCTION, CHANGES IN FACILITIES, OR PREVIOUSLY UNREPORTED FEATURES OBSERVED. VOLKOVYSK SAM SITE 434-2 UR 5318N 2421E SITE IS.OF LINK CONFIGURATION AND CONTAINS 6 REVETTED LAUNCH POSITIONS, 3 PROBABLY OCCUPIED, 1,COVERED:`AND 2 OF UNDETERMINED OCCUPANCY. REVETTING AND OCCUPANCY OF THE CENTRAL GUIDANCEAREA ARE UNDETERMINED. THERE IS A LARGE REVETTED DRIVE-IN BUILDING WITH 2 POSSIBLE VEHICLE$..PARKED IN FRONT OF THE CENTRAL GUIDANCE AREA. THREE UNOCCUPIED REVETTEDMISSILE-HOLD POSITIONS AND 1 OTHER UNOCCUPIED REVETMENT ARE LOCATED THROUGHOUT ' THE SITE. ONE LARGE AND 10 SMALLER SUPPORT. BUILDINGS ARE IMMEDIATELY SE OF THE SITE. VOLKOVYSK SAM.. SITE B19-2 UR 5255N 02425E SITE CONTAINS 6 REVETTED LAUNCHPOSITIONSs 3 POSSIBLY OCCUPIED AND.3 OF UNDETERMINED OCCUPANCY.: NO SIGNIFICANT CHANGE OBSERVED. TING-HSING SAM SITE A13-2 CH 3914N 11549E THE 6 LAUNCH POSITIONS ARE UNOCCUPIED. THE CENTRAL GUIDANCE AREA CONTAINS NUMEROUS VEHICLES/PIECES OF EQUIPMENT :AND 2 OF THE 5 ADJACENT AIRCRAFT