FILM VIEWERS AND FILM READERS (Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A001800120088-4
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
1
Document Creation Date:
December 28, 2016
Document Release Date:
June 4, 2001
Sequence Number:
88
Case Number:
Publication Date:
March 7, 1963
Content Type:
REQ
File:
Attachment | Size |
---|---|
CIA-RDP78B04747A001800120088-4.pdf | 62.39 KB |
Body:
Approved For Release 2001/08/13 : CIA-RDP78B04747A001800120088-4
Thurs.. , Mar 7, 1963
S
705-V Film Viewer
Delivery is ahead of the schedule quoted in the
contract status report of 10 Feb 63.
Total of 12 have been delivered (including contract
_ and 9 more will be ready for delivery within
the next two weeks. 5 ready now,. Requested permission
to St. Lotis.
Drastically behind schedule. No estimate available of
delivery. a us appears to be in about the fourth
month of a ten month program. They hope to have the
platen and drive mocked up for test by mid April but
that seems op imistio. They plan to use standard cabinet
component from 'Fiee viewer pro gram, modified to fit.
bring layout of control panel tb WDC end of
March for John R. Approval.
Will use Telecomputing Magnetic reading head type 15A
with 2000 counts per rev. No mechanical reset of
counter. Plan to use Nixie tube display of micron
count, resettable to zero on command.
V1111 use 22 F' Diam Graphmo ground to cool" toter
metering roller. Plan to try R0? film wrap for
teetering. Can increase to 180 by rework if needed.
Counter geared 10 rev to 1 roller rev giving 20,000
counts to 200 mm.
Loosely run developement program. No project plan,
no in-house written design directive, no close
coordination of electrical and mechanical design,
no error analysis to assure achievement of reading
accuracy. These things are not always needed but
in this case they would be highly desirable.
Design nearing completion, detail manufacturing drawings
being made. No b new parts made yet. Plan to
mock up vacuum metering roller for test in about
2 weeks, (seems Optimistic).
DECLASS REVIThW Kq ID001/08/13 : CIA-RDP78B04747A001800120088-4