CONTRACT(Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04747A001400040027-4
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 8, 2002
Sequence Number: 
27
Case Number: 
Publication Date: 
July 12, 1966
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B04747A001400040027-4.pdf103.87 KB
Body: 
Approved Fd~elease 0 78B047~14001400040027-4 C~ ~~ ~L duly l~, 1966 ontract ng car SubJect: Contract Gentlemen: #ncTosed $re three,.() copies Qfi the Mbnthly Status Report for sab~ect Contract, covering the period from l dune to 3Q Jung 1966. if there are any questions concernln,; the re~rt, please contact the undersigned, Very truly yours., 25X1A 25X1A Hager 25X1 A ontract m ~ stratTon JEH/~~ Enclosurest. 3 affi stated Declass Review by NIMA / DoD rskavr = ~ '~?G4,Up~C?,p'ROM AUTOir1Yi'TfC !-OWNc3lIAt~~t+1C w1~ ~.,~ ~?~4~ICAT~o1L ~- This document coirtaius information affecting the national defense of the Uxxited States within the meaxxing of tix: Yspionage I:aw~, Title 18, U.S.C., Sections 7S`3 and 794. The transmission or the revelation of its contents in any manner to an unauthorized ~"'~ ~ person is prohibited by law, Approved For 2 DP78B04747A001400040027-4 'Approved Felease 2002/06/17 TO: Customer DATE: 12 July 1966 SUBJECT: Monthly Contract Status Report #12 Advanced Liglit Tables Period: 1 June t~o 30 June 1966 I> Objective To design and develop three .A.dvanced Light Tables. II. Summary of Work Performed During the Reporting Period A . Table # 1 The table was inspected on 1 June 1966 anc~accepted y the COTR and delivered to the Customer's facility on 8 June 19b `.----~h instruction manual and engineering drawings have been written and printed. B. Table #2 This table was inspected and deliver,ect with Light Table #1. The engineering drawings are printed and the in~;truction manual is in publications being copied and bound. C. Table #3 The effort this month has been to complete the assembly of the table and to design a suitable ventilating port design. The instruction manual for this table is being typed by Publications. A]:1 engineering drawings are printed and ready for shipping to the Customer. III. Work Schedule Conformance Delivery of Tables #1 and #2 have been made. Table #3 is assembled and awaiting the COTR visit on 15 July 196b for inspection. IV. Analysis of Work Covering the Reporting Period We have come up with a suitable ventii~ating port design as the variation in illumination of the High Intensity Trackin;; Light Sources was reduced from 30% to 13?jo. Also an electrical design than?;e allowed us to reduce by 2 the number of leads from the transformers to tYie tracking light sources. This reduces somewhat the bulk of this wiring and the wiring problem V. Changes in Key Personnel There have been no changes in key personnel during this reporC'ing period. Approved For Release 2002/06/17 :CIA-RDP78B04747A001400040027-4 25X1A - Approved Fc~elease 2002/06/17 : C -RDP78B04747A001400040027-4 Monthly Contract Status Report #12 (Cont'd) VI. Trips, Meetings and Special Conferences 12 July 196b 25X1A The Customer visited n 1. June 19b6 and inspected Li ht Tables #1 and #2 and signed t e > orm 250. On 13 June 196b 25X1A visited the Customer's facility to make adjustments on a shade an - ra ce. VII. Plans for Next Reporting Period 1. After the Customer in.sper.ts Table ~#3 on 15 July deliver it to their facility. 2. Complete the instruction manuals. 3. Ship the instruction manuals and engineering prints to the Customer. Approved For Release 2002/06/17 :CIA-RDP78B04747A001400040027-4 Next 2 Page(s) In Document Exempt Approved For Release 2002/06/17 :CIA-RDP78B04747A001400040027-4 Approved For Release 2002/06/17 :CIA-RDP78B04747A001400040027-4