ANNEX 'A' OPERATIONS PLAN 40-57 1957 'OPERATIONS'

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP33-02415A000100130005-0
Release Decision: 
RIFPUB
Original Classification: 
T
Document Page Count: 
54
Document Creation Date: 
December 9, 2016
Document Release Date: 
October 23, 2000
Sequence Number: 
5
Case Number: 
Publication Date: 
July 31, 1957
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP33-02415A000100130005-0.pdf1.45 MB
Body: 
Approved For Release 2001/08/30 : CIA-RDP33-02415A000100130005-0 Air Force declass team chief reviewed previous Air Force decision at ERU request and changed to DRIF. Also relooked by DST team and DST certifier and OK'd as DRIF. So DRIF it is. p9;;Y! AS ~Yw.J] Approved For Release 2001/08/30 : CIA-RDP33-02415A000100130005-0 Approved For Release 2001/08/30 : CIA-RDP33-02415A000100130005-0 *USAF Declass/Release Instructions On File* OPERATIONS PLAN 40-57 1957 "OPERATIONS" COPY / OF 'COPIES TOP SECRET CONTROL NMR 160627 ANNEX "A", OPERATIONS PLAN 40-57 31 July 1957 F~l Approved For Release g0q1/e: CiA,, Weather Reconnaissance SQDN PROV 3RD Navy 3835, Fleet Post office San Francisco, California 31 July 1957 Annex "A", Operations Plan 40-57 31 July 1957 "OPERATIONS" MISSION: a. Upon receipt of an order of execution, deploy personnel and equipFrrent as outlined in this Operations Plan to a designated Advance Base, for approximately 30 days, b. Arrange for dispatch of one U-2 aircraft from Atsugi Naval Air Station to Advance Base, after Task Force is in place at Advance Base. 2. AIRCRAFT DEPLOYMENT: a. Ferry flight of U-2 aircraft will be planned to avoid USSR or Chinese Communist radar nets. Flight plan will insure landing fuel reserve of at least 100 gallons. 3. GENERAL INSTRUCTIONS: a. After arrival at advance base, prepare operations facil- ities for subsequent overflight activities. b. U-2 aircraft ferry configuration: (1) Take-off fuel; 1335 gallons (2) Take-off weight; 19,665 pounds Approved For Release 2001/08/30 :CIA F DFj3014 5Ad00100130005-0 Approved For Re1ease,2,001/08/30 : CIA-RDP33-02415A000100130005-0 (3) Minimum fuel reserve: (a) Maximum altitude: 100 gallons. Ferry mission will be flown at maximum altitude to avoid radar detection. Pre-computed celestial observations for speed and course line will be used. c. Normal Air/Sea rescue procedures apply. d. No special aircraft radio channelization will be required. e. Aircraft will launch from Atsugi Naval Air Station on a FEAF Tactical Clearance. No 1117511 clearance will be filed. f. Standard emergency procedures will apply. g. Emergency bases enroute: (1) As briefed, dependent on mission routee h. Task Force Operations Personnel: (1) Flight Commander (2) Navigation Officer (3) Weather Officer (4) Intelligence Officer (5) Photo Interpreter (6) Operations Clerk (7) Two U-2 pilots (one pilot to ferry U-2; backup pilot deploys in support aircraft) 4. TASK FORCE OPERATIONS EQUIPMENT: a. Operations staging kit, to include all necessary maps, Approved For Release 2 0 8/30 : C1A='-bP3 0 00130005-0 Approved For Release 2 ' I0?/ Cl n1n 130005-0 logs, escape and evasion currency, references and supplies will be deployed. For list of equipment to be deployed, see Appendix 2, Annex agn. b. Intelligence will have the capability to score 70MM tracker film, and prepare required mission overlays. Approved For Releas 2b/08/30 ' A-IT`D 1014600100130005-0 Approved For Release 2001/08/30 : CIA-RDP33-02415A000100130005-0 pri Approved For Releas 0~1/08/3 : CIA-RDP33-02415A000100130005-0 OPERATIONS PLAN 40-57 1957 "LOGISTICS" TABLE OF CONTENTS paragraph 1 4 5 Appendix 1 Appendix 2 Appendix 3 Appendix 4 Supply Transportation Service Personnel Miscellaneous SUPPLIES EQUIPMENT TRANSPORTATION PERSONNEL COPY :: OF COFZES TOP SECRET CONTROL NUMBER 160627 ANNEX "B", OPERATION31 July 1957 Weather Reconnaissance SQDN PROV 3RD Navy 3835, Fleet Post Office San Francisco, California 31 July 1957 Annex "B", operations Plan /+0-57 31 July 1957 "LOGISTICS" 1. SPLY a. Sufficient fuel LF-lA in barrels should be prepositioned at Advance Base. b. Aircraft spares will be withdrawn from Fly Away Kit of Weather Reconnaissance Squadron Provisional, 3RB, at Atsugi NAS and moved to Advance Base by support aircraft. (Appendix 1). c. Equipment to support 30 days operation at Advance Base (less items furnished by Base Commander) will be moved from Atsugi NAS to Advance Base by support aircraft. (Appendix 2). d. Messing and housing will be provided by Commander, Advance e. Commander, Advance Base, will provide normal supply support of standard Air Force items if required. It is anticipated that Task Force will be self sufficient. 2. TRANSPORTATION: a. Far East Air Force will provide airlift from Atsugi NAS to Approved For Release 2001/08/30 : CIA-RDP33-02415A000100130005-0 Approved For Relea a 2D 1iO 30,: I4RCE3p2415.AO000100130005-0 Advance Base, for Task Force personnel, equipment and supplies. Airlift will be requested by Project Headquarters. b. Surface transportation at Advance Base will be provided by Commander, Advance Base. Surface transportation requirements are listed in Appendix 3. 3. SERVICE: a. Medical: (1) Commander, Advance Base will provide personnel medical and hospital facilities if needed. b, Maintenance: (1) Hangar space for one U-2 aircraft will be provided by Commander, Advance Base. (2) Electrical ;support Equipment (MA-2), necessary power and miscellaneous maintenance equipment (standard Air Force items), maintenance shop facilities and minor facility modification will be the responsibility of Commander, Advance Base. (3) Commander, Advance Base will provide necessary ground handling equipment and personnel support (if required) to load and unload support aircraft at Advance Base. c. Finance: (1) Finance matters to include advance per diem payment will be as directed by Commander, WRSP-3. Approved For Release 20'01/08%30':b[A]RYA-62-41 IA000100130005-0 Approved For Release 20D W8130 :CIA-RDP33-02415A000100130005-0 4. PERSONNEL: a. Personnel requirements for the Task Force listed in Appendix 4. b. Replacement personnel or additional personnel will be provided from resources of WRSP-3. c. No classification, reassignment, or transfer of personnel will be accomplished during staging period. No leaves or passes will be granted to personnel of Task Force during staging period. d. No mail will be mailed by individuals from the staging base. All mail will be given to the Task Force Security Officer at Advance Base who will air mail it to Post Office Box 500, North Hollywood, California. Mail will then be postmarked at North Hollywood and sent to addressee. Mail incoming to Task Force personnel from the Zone of Interior will be packaged at Atsugi NAB, Japan, and remailed to Advance Base. 5. MISCELLANEOUS: a. Headquarters of WRSSP-3 will remain at Atsugi NAS, Japan. APPENDICES: Appendix 1 - SUPPLIES " 2 - EQUIPMENT It 3 - TRANSPORTATION It 4 - PERSONNEL Approved For Release 2001/08t3Q CIA-RAP F-9,2CmRofooTioO05-0 Approved For Release 2001/08/30 : CIA-RDP33-02415A000100130005-0 'w Approved For e ' 20014j; Approved For 2/08/34 :CI R02i y A000100130005-0 Weather Reconnaissance SQDN PROV 3RD Navy 3835, Fleet Post Office San Francisco, California 31 July 1957 Appendix 1 (Supply) to Annex "B", Operations Plan 40-57 31 July 1957 1. MAINTENANCE: a. Fuel System: 1-0465 Transmitter 6101-02077-1500036 1 2-0499 Fuel Control, Engine 512179 1 b. Instruments: 5-0063 Radio Compass Indicator-6234-36104-lL1lAl 1 1-0259.1 Clock, Elapsed Time - NS 28020-4 1 1-0062.1 EGT Indicator -132706 1 c. Electrical: 1-0232,1 Amplifier, EGT -SP-184-012E 1 1-0233 Amplifier, HAG SP-17532-3 1 1-0236.1 Battery -SP-20V0-35 1 1-0370 Bulbs, Instrument Light SP-260-BPRP 1 COPY OF 2 COPIES TOP SECRET CONTROL NUMBER 160627 Appendix 1 to Annex "B",, Operations Plan 40-57 31 July 1957 Approved For 01>/_:Ii-23-0415A000100130005-0 c. Electrical Cont'd) 1-0495 Bulbs, Warning Light 6240-155-8714 1 Buttons, Emerg Face Heat BS-12205-Snap Button 2 (Kit) 8-00456 Circuit Breaker -SP-14500-5 2 8-00457 Circuit Breaker -SP-11500-10 2 1-0102.1 Fan, Defrost -SP-R-161 8-0447 Fuses, 15 Amp 5920-296-0443 2 8-0448 Fuses, 1 Amp 5920-296-0531 3 8-0446 Fuses, 2 Amp 5920-221-4522 2 1-0364.1 Inverter, Instrument -SP-12142-1 1 1-366,1 Landing Lights 8870-804000-875 2 1-0414 Rheostat, Face Heat SP-PW-50-C4-SPST 1 1-0433.2 Sw5_tch, Surge Bleed Valve 5930-253-8796 2 1-0468 Transmitter Fuel Press. 6143-ST6B 1 1-0470 Transmitter. Oil Press. 6134-7707-30A5-1 1 d. Hydraulics: 1-0051 Dive Brake Cylinder -SP-N-5 1 1-0390 Hydro Pump SP-66YC300 2 1-0469 Press Transmitter 2334-7609-37A5-1 1 1-0328 Hose ASSY HYDRO High Press -AN6292-8-15 1 1-0322 -AN6292-6-13 1 1-0323 -AN6292-6-212 1 Appendix 1 to Annex "B" Operations Plan 40-57 31 July 1957 Approved For ReLe,ase-2004108/30,: GIA-fRDPS 0 00100130005-0 ",'?ra ~. a ^t.Y HYdw cs (Cont'd) 8-0628 1-0224. Filter Hyd. Press & Return Line 1 Accumulator, Hyd. 4831-1356-512465 1 e. Cockpit Pressurization & Heating 1-0394 1-0399 1-0485 Refrigerator Unit -SP-84140 1 Regulator, Cockpit Press. SP-102170-2 1 Valve, Dump Cockpit Press. SP-103102-438 1 1-0479 Solenoid Operated Flow Control Valve SP-104366-1 f. Aircraft Parts 1-0204 Pogos (Spare set) SPL-124 1 1-0508 Wheels, Main Gear, Tire Mounted -SP-9531606 4 1-0509 Wheels, Tail Gear -SP-AN7534-A5 2 1-0487 Valve Assy Air High Press. -AN6287-1 1 1-0473.1 Valve Stem for Tubeless Tires -SP-V5-743 2 1-0370.1 Brake Pucks (One Set) SP-95-22327 1 2. PHOTO: 8-0445 Fuse, Cartridge, Time Delay FSNA-5920]31-9820 5 ea 3 2HK3 730151-025 4-0014 Crystal Unit, IN-92 FSNA-5960-270-9093 5 ea 32HK1 730145-002 8-0476 Tape, Black Elec FSNA-5970-296-3307 2 rolls 32HK8-735453-013 8-6483 Battery, Flashlight FSNA-6135-120-1020 32HK8-735453-027 4-0025 Developer, D-19 FSNA-6750-286-2692 4 cans 32HK8 735453-040 Appendix 1 to Annex "B" Operations Plan 40-57 31 July 1957 Approved For Release 2001/08/30 CIA-RDP33-02415A000100130005-0 .~,~ :: ,~,