QUARTERLY REVIEW OF CONTRACT REQUIREMENTS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP68B00724R000100090023-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 14, 2016
Document Release Date: 
July 29, 2003
Sequence Number: 
23
Case Number: 
Publication Date: 
October 5, 1966
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP68B00724R000100090023-7.pdf101.35 KB
Body: 
Apoved For Release 2003/08/18: CIA-R68B00724Re /,00090023-7 IDEALIST SECRET IDEA 3248-66Series B Copy ///a(f /4I/ 5 of 5 5 October 1966 MEMORANDUM FOR: Deputy for Operations, OSA SUBJECT: Quarterly Review of Contract Requirements._. 1. Following are corrections and/or changes to the IDEALIST Operational Concept, Attachment I to memo from Deputy for Field Activities OSA, subject, "Operations 25X1A Concept", 4 February 1966 a. Paragraph 3b. A full time requirement also exists at Detachment "H" for an Operations Officer and Flight Planner from Detachment "G". These two personnel are placed on a temporary duty basis to augment Detach- ment "H" operation in the event that deployments to or another future base for recovery and 25X1A launching o missions is required. b. Paragraph 3d. Since the prepositioned equipment 25X1A and assets ati were not adequately safe- __ 4+ ;c now necessary to remove - %Iuc i v.i.w-..,....cp _ ..r--- -- - - There it will be repaired and maintained. If a deploy- 25X1A ment tol should occur, a large amount of air- lift will be necessary to bring in the stored assets and 25X1A equipment from 0 and additional support equipment and personnel from USAFE and Detachment "G". c. Paragraph 3e(2). In an effort to economize to a degree, present plans anticipate the recall of the hnical representative from Detachment "H". d t ec FFD-3 an All FFD-3 units in IDEALIST will be stored and maintained at Detachment "G" and be ready for deployment should the occasion arise. NRO REVIEW COMPLETED IDEALIST SECRET Approved For Release 2003/08/18 : CIA-RDP68B00724R00010009002 ,,~e,v/d 25X1A GROUP I Excluded from automatic -7 downgrading and declassification ? - r Appr6V6d For Release 2003/08/18 : CIA-RDPWB00724R000100090023-7 SECRET IDEALIST IDEA 3248-66 Page 2 d. Paragraph 6d. Drop tanks will be used on at least ten missions per year. e. Paragraph 6h. Oscar Sierra will be required on all operational missions. f. Paragraph 7a. IDEALIST U-2 aircraft inventory will be maintained at a level of seven. Three each'will be at Detachments "G" and "H". One aircraft will be available to Detachment "G" approximately one half of the time. The other half of the time will be required by Lockheed Aircraft Corporation for new equipment mod- ifications and testing. Paragraph 7b. Force level of seven aircraft will be maintained instead of ten. h. Paragraph 8c. After a careful analysis of existing flying time figures, flying hours available will be computed on a basis of 35 hours per month for each aircraft available. Previous figure used was 30 hours per month. 2. Flying hours available will remain at 2520 hours per year for six aircraft, plus a bonus of 180 hours that will be .available to Detachment "G" based on 50/50 use of the 25X1A seventh U-2 between Edwards and Loc eed. Lt. Colonel USAF C/IDEA/OSA 25X1A IDEA/OSA :aea (5 Oct 66) Distribution: #1 - D/O/OSA #2 - IDEA/OSA #3 - RB/OSA #4.- Holdback 2-- 3.. I 4-9/84 MAI IDEALIST Approved For Release 2003/08M %. -RDP68B00724R000100090023-7