QUARTERLY REVIEW OF OXCART CONCEPT OF OPERATIONS FY 1967

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP68B00724R000100090022-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
8
Document Creation Date: 
December 14, 2016
Document Release Date: 
July 29, 2003
Sequence Number: 
22
Case Number: 
Publication Date: 
October 31, 1966
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP68B00724R000100090022-8.pdf248.75 KB
Body: 
SECRET Approved' r Release 2003/08/1& @IA1pP68BO 24R000100090022Z5,q 5 0/ice/~- OXC 11228-66 Series B Copy (1 / '/ 5 of 5 31 October 1966 25X1A MEMORANDUM FOR: Deputy for Operations, OSA SUBJECT: Quarterly Review of OXCART Concept of Operations FY 1967 REFERENCE: A: 2212-66 dated 4 Feb 66; Subj: Operations Concepts B: OSA 3932-66 dated 4 Oct 66; Subj: Quarterly Review of Contract Require- ments 1. OXCART Division has reviewed the OXCART Operational Con- cept contained in Attachment 2 to Reference A and as a result the fol- lowing changes are recommended to FY 67 Concept of Operations. As appropriate, recommended changes to FY 69 through FY 77 programs will be submitted along with the FY 68 Budget Call: a. Ref para 6a, add the following sentence: 25X1A 25X1A 25XIA "During this period and until full operational capability is attained operational missions against Soviet and Soviet Bloc targets will be planned to re- strik 11 and ost- strike forward e. g. pre- strik post- strike 25X1 A with maximum of four (4) air refuel- ings enroute. " b. Ref para 6b, change the second last sentence to read: "A maximum of four (4) air refuelings enroute will be planned." OXCART SECRET Approved For Release 2003/08/18: CIA-RDP68B00724R0001 SECRET Approvedfier Release 2003/08/1F&-)M W68B01 14R000Q QQ9QQ?M -66 Page 2 c. Ref para 6c, delete the existing paragraph and substitute the following: "In maintaining operational readiness for both contingency plans, Far East (Black Shield) and Cuba (Skylark), it is planned to conduct operational missions during each contin- gency requirement as follows: 25X1A In Flight Test - 2* instead of 1" Coverage Far East Cuba Estimated Successful d. Ref para 7c, recommend the anticipated utilization of OXCART Aircraft from 1 Jan 67 through the end of forecast period be changed as follows: e. Ref para 7d, recommend the third sentence be changed as follows: "First priority consideration should be given to con- version of Tagboard Aircraft to the OXCART Configura- tion; if required, further replacements could be obtained by modification of SR- 71 / YF-12A Aircraft to meet opera- tional needs. " f. Ref para 7, recommend the following subparagraphs e and f be added to comment on OXCART Aircraft accident/ attrition rate: "e. An A-12 Aircraft attrition rate has been developed based on all A-12 flying in the OXCART program since inception of flying in April 1962 through 30 September 1966. During this period 3296 A-12 flying hours have been accom- plished with the loss of 3 aircraft. This equates to a rate of 9. 2 accidents/aircraft losses per 10, 000 flying hours. Based OXCART Approved For Release 2003/08/185Y68B00724R000100090022-8 25X1 D SECRET App d For Release 2003A Agt.4-RD 00724RQg? Q1 WBH$2-g6 Page 3 on present flying hour programs, it is projected that the next aircraft accident (which may occur in an aircraft loss), may occur in the first quarter of FY 1968. It "f. As the aircrew experience /proficiency level con- tinues to increase, as maintenance procedures and methods continue to streamline and improve, and as overall "know- how" in the relatively new Mach 3 environment continues to build up, it is reasonable to expect that the accident/loss rate per 10, 000 flying hours will decrease." g. Ref para 8, recommend deletion of the entire present para- graph and the following substituted: "8. Flying Hours a. A projection of sorties and flying hours avail-. able versus sorties/flying hours required is attached. The presenti aintenance capability provides for a sortie rate capability of 6.2 sorties/month/avail- able aircraft. Present average sortie length is 2.5 hours/sortie. It is anticipated that beginning 1 Jan 67 maintenance capability should provide for 7. 2 sorties/ month/available aircraft with average sortie length continuing at Z. 5 hours/sortie. ? It is estimated that beginning in early FY 68, average sortie length should increase to 3 hours/sortie and the sorties/month/avail- able aircraft should increase to 7. 5. b. Flying hours accomplished on operational mis- sions are creditable against projected pilot requirements. All flying time in the attachments pertains to J-58 equipped aircraft. Y c. Following is the desired and minimum J-58 equipped sortie rate per month for each operationally ready project pilot: OXCART SECRET Approved for Release 2003/08/18 : CIA-RDP68B00724R000100090022-8 SECRET Approved`For Release 2003/08/1 b F -IJEIP68B0 24R000129 9028 28-66 Page 4 Desired Sorties /Month 6 Average Sortie Length 2+30 Minimum Acceptable NOTE: As required, operational pilot sortie flying hour requirements to be augmented by a minimum of two sorties per month in the dual seat J-75 equip- ped trainer. d. The dual seat J-75 equipped trainer aircraft will be used for checkout training of new pilots and for additional proficiency training for operationally ready pilots. A mini- mum of 16 sorties/month will be required of this aircraft with average sortie length one hour and thirty minutes dura- tion for a total trainer flying hour requirement of 24 hours per month. h. Ref Attachment I consolidated flying time. Change FY 1967 flying time as follows: "FY 1967 1 July 1966 - 30 June 1967 Required Projected 1338 1341 2. Ref Attachment II, flying time for FY 67 broken down into 6 month increments. Delete the existing Attachment II in entirety and substitute the attached Projected versus Required Flying time for FY 67. t. Colonel, USAF Chief, OXCART Division, Operations, OSA OXC/O/OSA/I kch Distribution: #1 D/O/OSA #2 - OXC/O/OSA OXCART #3 - &VA For Release 2003/08A1? IThADP68 100090022-8 l4dft~ #4 - kwr!o n o ~1C Approved For Release 2003/08/18 : CIA-RDP68B00724R000100090022-8 Approved For Release 2003/08/18 : CIA-RDP68B00724R000100090022-8 SECRET Approved'rbr Release 2003/08/1 b + & l P68BObfi24R000100090022-8 ATTACHMENT II Page 2 1. Adequate flying hours are available. 2. Above figures projected based on one (1) operational aircraft in periodic at all times and only one (1) flight test aircraft available (#122 in modification for entire period. ) 3. One standardization/ staff pilot to fly minimum of one sortie per month. Operational pilot flying to be reduced accordingly. Addi- tional staff/ standardization flying to be accomplished as required in two-seat trainer. 4. Operational pilot strength has increased to with recruit OXC 11228-66 OXCART Copy 1 of 2 Approved For Release 20b3/08/15VP68B00724R000100090022-8 ~1C Approved For Release 2003/08/18 : CIA-RDP68B00724R000100090022-8 Approved For Release 2003/08/18 : CIA-RDP68B00724R000100090022-8 25X1 25X1 SECRET Approved-For Release '2003/08/**fDP68B90724R000100090022-8 ATTACHMENT II Page 4 1. Adequate flying hours are available, (within 3 hours). 2. Above figures projected based on one operational aircraft in periodic at all times. 3. Operational pilot strength has increased to with recruit-. ment ofF--] additional pilots in early calendar 67. 4. One standardization/ staff pilot to fly, minimum of one sortie per month. Operational pilot flying to be reduced accordingly. Additional staff/ standardization flying to be accomplished as required in two-seat trainer. OXCART SECRET OXC 11228-66 Copy 1 of 2 Approved For Release 2003/08/18 : CIA-RDP68B00724R000100090022-8