LETTER TO (Sanitized) FROM (Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP68B00307R000100020003-9
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
8
Document Creation Date:
December 12, 2016
Document Release Date:
January 31, 2002
Sequence Number:
3
Case Number:
Publication Date:
February 16, 1966
Content Type:
LETTER
File:
Attachment | Size |
---|---|
CIA-RDP68B00307R000100020003-9.pdf | 203.39 KB |
Body:
Approved For Release 2002/06/12 : CIA-RDP68B00307R000100020003-9
25X1A
OXC-9832
Copy / of 5
Contract No. 25X1A
Task Order No.
File Ref: F_ I 25X1A
1. In ance with the provisions of Contract No.
25X1A I land effective upon acceptance hereof, you are
authorized to proceed with the performance of Task Order No. 1
to said contract. -
2. The scope of work to be performed under this Task Order
and such additional provisions as may be applicable are set
forth in the work authorizations listed in the attached
schedule. The program of work outlined therein is subject to
modification by the Contracting Officer or his duly authorized
representative.
3. The estimated cost of the performance of this Task
Order, exclusive of fixed fee, is
4. The fixed fee for the performance of this Task Order
25X1A shall be However, such fee is subject to reduction in
the even ne net effect of any modification in the work
program in Paragraph 2 above is to reduce the scope of work
on which the original fixed fee was based.
5. The work and services to be performed under this Task
Order shall commence on or about 1 October 1965 and shall con-
tinue through 1 April 1966. However, said period of per-
formance may be extended by mutual agreement.
6. Upon execution of all copies of this Task Order, please
return the original and one copy to the undersigned, and
retain the remaining copy for your files.
Very truly yours,
25X1A
25X1A
25X1A
25X1A
Assistant
TITLE Vice President &
General Manager
DATE 27 January 1966
Approved For Release 2002/06/12 : CIA-RDP68B00307R000100020003-9
Approved For Release 2 002/06/12 : CIA-RDP68B00307R000100020003-9
SCHEDULE
I - SCOPE OF WORK
The contractor shall provide the necessary personnel and
services to accomplish the effort outlined under the FIVE work
authorizations listed below.
A. Work Authorization A
25X1 D
25X1 D
I. PURPOSE
25X1 D
The work authorized herein is for the pur-
pose of determining the equipment and techniques neces-
sary to demonstrate the feasibility of
The feasibility demonstration s ou u ilize existing
off-the-shelf hardware and Government facilities wherever
practical.
II. SCOPE OF EFFORT
The efforts associated with this work
authorization are as follows:
25X1 D
a. Determine preliminary functional re-
quirements of the suitable for use in
the demonstration system testing.
b. Determine preliminary system parameters
for a feasibility demonstration.
25X1 D
25X1 D
c. Perform preliminary laboratory tests to
determine the suitability of off-the-shelfl _j 25X1D
to satisfy the functional requirements deter-
minea a result of Items a and b above.
d. Determine equipment and facilities avail-
able for utilization in the accomplishment of the pro-
posed feasibility demonstration.
e. Determine preliminary interface and
operational requirements for equipment to be used in
the demonstration test.
f. Formulate a schedule for accomplishment of
the proposed feasibility demonstration.
Approved For Release 2002/06/12 : CIA-RDP68B00307R000100020003-9
Approved For Release''2b02/06/12 : CIA-RDP68B00307R000100020003-9
III. REPORTS
Prepare a final report stating the results of
the efforts accomplished in association with the above scope
of effort.
Approved For Release 2002/06/12: PIA-RDP68B00307R000100020003-9
Approved For Release. "2 d/12 : CIA-RDP68B00307R000100020003-9
B. Work Authorization B
Statement of Work
I_ . PURPOSE
The purpose of this work authorization is
II. SCOPE OF EFFORT
a. OXCART Aircraft
This work authorization is to determine
the interface requirements
the following:
1.
2.
Logic level of digital data
Timing parameters
3. Wave shapes
4. Data characteristics
5. Voltage and impedance levels
6. Interconnection cabling requirements.
b. IDEALIST Aircraft
This work authorization is to determine
25X1 D
25X1 D
25X1 D
Approved For Release 2002/06/12 : CIA-RDP68B00307R000100020003-9
Approved For Rele 2002/06/12 : CIA-RDP68B00307R000100020003-9
the interface requirements 25X1D
This data shall include the 25X1D
following:
1. Logic level of digital data
2. Timing parameters
3. Wave shapes
4. Data characteristics
5. Voltage and impedance levels
6. Interconnection cabling requirements
III. REPORTS
Prepare a final report stating the results
of the efforts accomplished in association with the above
scope of effort.
- 4
Approved For Release 2002/00/12 : CIA-RDP68B00307R000100020003-9
Approved For Release 2002/06/12 : CIA-RDP68B00307R000100020003-9
C. Work Authorization C
Statement of Work to Determine the Feasibility
of Co-location
I. PURPOSE
This work authorization is to determine
a. The feasibility and practicality of
co-locating OXCART and IDEALIST aircraft)
b. The availability and suitability of
site equipments to satisfy the stated requirements.
II. SCOPE OF EFFORT
This work authorization provides for the
study and formulation of preliminary equipment list-
ings for support of the
including:
a. Survey of existing and/or planned sites
to determine:
1. Primary power facilities
2. Floor space and loading
3. Support utilities
4. Terrain topography
5. Antenna Farm layout
6. Detailed equipment inventory
7. Operational limitations.
III. REPORTS
Prepare a final report, including recom-
mendations for the equipment configuration of the
various sites. These recommendations shall take
into consideration the availability and limitations
of the existing equipment and site limitations.
25X1 D
25X1 D
25X1 D
25X1 D
Approved For Release 2002/66ff` : CIA-RDP68B00307R000100020003-9
Approved For Release 2002/06/12 : CIA-RDP68B00307R000100020003-9
D. Work Authorization D
I. PURPOSE
This work authorization is to make a pre-
liminary determination of the form factors necessary
for the installation
on the OXCART aircra .
II. SCOPE OF EFFORT
This work authorization shall define the
following:
a. Available areas that may be used for
b. Mounting Structure requirements
c. Interconnection cabling restrictions
d. Possible sources of electrical inter-
ference
e. Air flow quantity and temperature in
selected areas
f. Equipment removal and replacement factors.
III. REPORTS
Prepare a final report stating the results
of the efforts accomplished in association with the
above scope of effort.
25X1 D
25X1 D
25X1 D
Approved For Release 2002/06/1:-CIA-RDP68B00307R000100020003-9
Approved For Release 2002/06/12 : CIA-RDP68B00307R000100020003-9
E. Work Authorization E
Statement of Work to Determine Form Factors
for IDEALIST Aircraft
I. PURPOSE
25X1 D
This work authorization is to make a pre-
liminary determination of the form factors nece
for the installation 25X1D
on the IDEALIST aircr
II. SCOPE OF EFFORT
This work authorization shall define the
following:
a. Available areas that may be used for
installation of 25X1D
b. Mounting Structure requirements
c. Interconnection cabling restrictions
d. Possible sources of electrical inter-
ference
e. Air flow quantity and temperature in
selected areas
f. Equipment removal and replacement factors.
III. REPORTS
Prepare a final report stating the results of
the efforts accomplished in association with the above
scope of effort.