DAILY ACTIVITY REPORT - 6 NOVEMBER 1963

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP63-00313A000500140100-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 16, 2016
Document Release Date: 
September 29, 2004
Sequence Number: 
100
Case Number: 
Publication Date: 
November 6, 1963
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP63-00313A000500140100-1.pdf130.51 KB
Body: 
Approved Fir Release 2004/12/1 P63-00U3A000500140100-1 Copy vein r 1963 25X1: 25X1 EMORANDUM FOR: Deputy Director (Science and Technology : Daily Activity Report 6 November 1963 1. SATELLITE SCHEDULE: CORONA/MURAL Mission 9060 was delayed from 7 November to 9 November due to technical difficulty with the payload. Mission 9061 now scheduled for 27 November 1963 is back up for 9060. awaiting good weather Flying activity stood down. Detachment is operationally ready or target areas. 4. EDWARDS AIR FORCE BASE: Normal training activity. dy for a high speed run, but the mission was cancelled because of extensive cloud decks and inclement weather in the a xtendeu tt test area. This aircraft will be rescheduled for a flight as soon as a. Aircraft #121, with latest inlet duct modifications to irnpr-,.)ve ow and intended to reduce roughness encountered in the past, xer permits. b. The following made flights in the local area at the test site: 25X' 25X1 SET 5. BRASS KNOB: Mission 3767 landed 05/1322 EST. Pilot estimates a15% target coverage, no reaction. Mission 3768 took off at 06/0545 EST. Both missions used standard camera and film, ETR for 3768 is 06/1300 EST. 6. OXCART Flight Test. 5 November: N A prrvAg%j fF AVpe4/12/15: CIA-RDP63-00313A000500140100-1 Approved For'Release 2004/12/15: CIA- P63-003'1 A000500140100-1 25X1 25Xt1 25X1 25X 25X1 25X1 peed Mach 1.1. of 1:27 hours. Purpose: accomplishment of training mission #1 for an operational pilot. Maximum altitude was 36, 000 a (1) Aircraft #124 (trainer) m duration of 1 .*56 hours. Purposes ARC-SO c mmunications tests. The ARC-50 worked well in all modes of operation. h ai uni altitude was 36, 000 fast and Mach .94. A Detachment oper- ational pilot was at the controls. {Z) Aircraft #1Z5 (J-58 engines) made, flight 030 to lade) made flight 0,4 of 1:54 hours, with an operational pilot at the controls.. altitude was 35, 000 feet and speed Mack .91. contracting officer, A, is visiting ITEK connection with LANYARD termination matters. ITEK Corporation, on *Vem. r, to UMA t" n vo conclusions of Ion the zn lytical study of the electron cloud for- ;ime and the radar beam attenuation properties of this clfi:ud. ad formation time and attenuation look favorable for the pulse n of KEMPSTZR B The C Triple Prime cam r oo a three KN n issi: ns, was returned to I for inspection. will undergo inspection and incorporation of minor i=-,proveeaents and be available for return to the f cJd on 18. November. r1n 16 j. I JLIU' Approved For Release 2004/12/15: C19RDP63-00313A000500140100-1 c. OXCART Aircraft Status (See cable insert for additional is on OXCART Status) 'General Item, s: 4.1 25X1