GENERAL MILITARY INFORMATION
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A002100620002-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 16, 2016
Document Release Date:
June 13, 2005
Sequence Number:
2
Case Number:
Publication Date:
July 20, 1953
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80-00810A002100620002-8.pdf | 120.83 KB |
Body:
Approw4a#6&46
CC*TRY..,_._
25X1
TOPIC General Irilitary Information
25X1
EVALUATION
CWE OF CONTENT
DATE OBTAINE?
REFERENCES ..._.
-DATE PREPARED
2
PAGES _._ENCLOSURES (NO. & TYPE)
REMARKS
25X1 PLACE OBTAINED,
25X1
25X1
20 July 1953
25X1
25X1
infantry unit
under the command
of Colonel 25X1
n
onareul left the Adolf Hitler Kaserne and moved to the F
ritzsch Kaserne
in
Schwerin. Major Polavsz (fnu ; who arrived from Hungary
' _
25X1
bel
onged
to this unit?
25X1
2.
the co
nstruction of
the
?aarrae s ins a ono in c wer n- uc olz which had b
een planned
for
1953 was postponedo1
-
25X1
3
1
1
2 infantry units which came om the area of Le
ipzig were.
25X1
qua
rtered a Hagenow airfield 2
Li
the
I
25X1
fie
40 The
ld bakery at Hagenow airfie was comp eted,
construction of a large boiler house w)..ich was schedule
d to be equipped
wit
h 2
ilers each with a heating area of 48 square meter
s started on
25X1
`yhe boiler house was to be completed
1
25X1
5.1
Ithe host-ital in the Priem.
forest
.
25X1
ieut
enant
Col
onel Griponov (fnu) was chief physician. Major Nikelasky
(fnu) was also
ass
bil Add
sto
igned to the hospital.
itional permanent structures each 19 by 44 m and schedule
re houses were planned to be erected by Soviet soldiers i
d to serve as
n Forest Section
25X1
f the Nleurzuehl Forest near Klein Warin until 'mid-Aug
ust,, Pauunion
War
in and the Grevesrriehlen branch laid normal a e tracks
alone two
cle
arings from the Ne muehl forest station
25X1
25X1
Prisoners from the Buetzow penitantiary were empl
oyed on this work,
25X1
7,1
rojects simi
lar to thoae in
e
in War in were under way in the area of Vogelsang in the E
berswalde Kreisr 3
CLASSIFICATION SEC
Approved For Release 2005/06/30 : CIA-RDP80-0081OA002100620002-8
-REPORT NO.
P16
25X1
Approved For Release 2005/06/30 : CIA-RDP80-0081OA002100620002-8
SEC13.~r 25X1
25X1
25X1 25X1
25X1
25X1
~~omr ent . the 940th AAA Bn of the 94th Gds PfLz
Rifle Div in Sc wer In The battalion was believed to have been
stationed at the Adol Hitler serve. A transfer to the Fritsch Kaserne
appears possible because AAA had since some tire been observed at the.
installation and the date of n all probability 25X1
does not coincide with the date of the transfer.
Colonel Pononareus (fnu) had been re rted s comrmandi officer 25X1
of the aforementioned unit 25X1
I polonel Golowanov (fnu) was battalion comman er.
25X1 2.1 mment m These units were possibly to perform special exercises.
25X1 3 Corarrtn the unidentified
25X1 engineer battalion of the IX Mtz Rifle Cor s trans errs rom Goerries
to Priemerwald to construct a care
25X1
25X1
The construction project in the area o oge a
of the barracks installations northwest of Vogelsang which is known from
previous reports.
SECRET 25X1
Approved For Release 2005/06/30 : C1A-RDP80-0081OA002100620002-8