IMPLEMENTATION OF OMB CIRCULAR A-44 (REVISED), DATED 16 FEBRUARY 1970

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP83B00823R000400050017-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
20
Document Creation Date: 
December 12, 2016
Document Release Date: 
May 30, 2002
Sequence Number: 
17
Case Number: 
Publication Date: 
November 2, 1970
Content Type: 
MF
File: 
AttachmentSize
PDF icon CIA-RDP83B00823R000400050017-1.pdf1.42 MB
Body: 
Approved For Release 2002/06/18 : CIA-RDP83B00823R000400050017-1 2 Nov 1970 MEMORANDUM FOR;, Deputy Director for Intelligence Deputy Director for Plans Deputy Director for Science and Technology Deputy Director for Support dated 1 P 7 0 1. OMIT Circular A-44 (Attachment A) proscribed an aggrerruivo and comprehensive program to improve the management and efficiency of Government operations. :Clio President has given the program his personal endorsement and expects the support of key officials of all agencies in complying with the spirit and principles of the OMB directive. 2. Each Deputy Director should take immediate steps to establish an effective management improvement program in accordance with Agency instructions set forth in Attachment B. I am certain there are areas where serious examination would reveal possibilities for increasing the efficiency and reducing costs. For example, we should give attention to all so-called "overhead" activities -- substantive as well as administrative -- to assure that staff review and coordination procedures and processes, as well as services provided, make a necessary contribution to our substantive missions and are performed as efficiently, and economically as possible. 3. The Director of Planning, Programming, and Budgeting is responsible for coordinating the Agency-wide management improvement program and assembling the reporting data required by OMB. Each. Deputy Director is asked to designate, by 10 November, // a senior officer. as a contact point for him on these matters. 25X1 1j. A. ie Executive Director-Comptroller Attachments: A -.,OMB Circular A-44 B -''Agency Management Improvement Program Implementation Instructions Approved For Release 2002/06/18 : CI 8ODa2. R000400050017-1 GRV7? 1 ,,,1r 1101 u u ~~ 4tH ~~ s , ?. 4pprgvAd t Lgase 2002/06/18: CIAtDP83B0080000400050017.J1 n E ROUTING AND RECORD SHEET SUBJECT: (Optional) EXTENSION NO T`"'"' . DD/S 70-4385 Chief, DD/S Plans Staff DATE STAT 7D 10, Headquarters TO: (Officer designation, room number, and building) DATE OFFICER'S COMMENTS (Number each comment to show from whom RECEIVED FORWARDED INITIALS to whom. Draw a line across column after each comment.) 1. Director of Security STAT I has been 4E 60, Headquarters designated as the O/PPB representa- 2. tive for the Agency in setting up a Management Improvement Program and the undersi ned has been g 3. designated to represent the Support Directorate. 4. Please note that the initial report, as called for in Section IX 5. of the Agency's Implementation Instructions, is due in O/PPB on 31 D b 1970 I h 6. ecem er . t s ould be submitted to the Chief, DD/S Plans Staff no later than 21 December 1970 7. or earlier if completed before that dam Submittals to the undersigned should be in duplicate. 8. I will forward to you addi- 9 tional Implementation Instructions as developed. ST 10. Chi f DD/S Pl S ff , e ans ta 11. Att: Correspondence re Implementa- 12. tion of OMB Circular A-44 dtd 16 Feb 1970 (2 Nov 70) 13. 14. l~-J) v 15. T S FORM USEDPRION PREVIOUS I a q s ri 3 i s' t l 1 6? : SECRET CQ 4I aI6TIRi. USE 0t;LY pproved For Release 2002/06/18 : CIA-RDP83B00823R000400050017-1 is EXECUTIVE OFFICE OF THE PRESIDENT BUREAU OF THE BUDGET WASHINGYON, O.C. 20503 CIRCULAR NO. A?44 Revised .TO THE HEADS OF EXECUTIVE DEPARTMENTS AND ESTABLISHMENTS SUBJECT: Establishment of a management improvement program.-. applicable to all Government operations 1. Purpose and coverage. a. This Circular establishes a formal Government-wide management improvement program and is effective immediately. It supersedes and rescinds Circular No. A-44, Revised, dated August 3, 1966. b. Improving the efficiency and economy of Government operations is a major concern of the President. Therefore, each individual in Government should be motivated to be constantly alert to the develop- ment and application of better ways to perform day-to-day tasks. flow-. ever, for many programs, functions, and activities, management effec- tiveness and efficiency cannot be measured or evaluated in terms of dollars saved. Many of these operations, such as services to the public, represent some of the most.ir;;;;:)rtant governmental activities and potential areas for management improvement. Therefore, it is vital that the ability exist to establish objectives, measure perform ance, and evaluate results in all areas of governmental activity. A combination of emphases on individual management actions and total management efforts applied to selected priority areas, permits both the measurement of cost reduction and the effectiveness of in- tensive management attention. The management improvement program .thus recognizes that management improvement actions can generate dollar savings, system benefits, or both. c. The management.-.improvement program will consist of five inter- (1). effectiveness;,, (2) Cost reduction; (3) Idea interchange; (4) Presidential recognition of exceptional improvement Periodic:-study`'of Government-wide operations. (No. A-44) -;'A'pproved For Release 2002/06/18: CIA-RDP83B00823 Approved FQr ease 2002/06/18 : CIA-RDP83B008231#0400050017-1 1 ~ This Circular sets forth policies, procedures, guidelines, and respon- 11 execu- that area. represent the combined a ec performance being achieved. d. Performance results reported for each area selected will ff t of all management actions taken for .c. Each specific problem or a inated from the program by the agency, based on the acceptability of ctivity will be added to or elim- further action as appropriate. b. Areas for inclusion will be s77ected in a manner which assures that priority attention is concentrated where the greatest needs exist. sibilitics for carrying out these elements. It applz.es to a tive departments and agencies and is effective immediately. 2. Reportinc. An annual management improvement report covering the program elements will be prepared in accordance with the requirements and definitions contained in Attachment,A and submitted in duplicate to the President, through the Director of the Bureau of the Budget, by September 30 of each year. The first report will be due on September 30, 1970. 3. Management effectiveness. It has long been recognized that manage- ment progress in many functions and activities cannot always be measured on the basis of dollars saved. Many of these functions contain a sig- nificant potential for management improvement but require a system for identifying quantitative measures of performance, establishing perform- ance goals, measuring performance, analyzing,the results, and initiat- ing corrective actions. Therefore each department and agency head will establish a formal, organized management effectiveness program to serve this purpose. The objective of this program is to concentrate manage- m:nt attention on persistent problem areas of high level priority. These areas will be identified by a systematic review of agency activi- ties and operations. The program is" designed to increase the emphasis on and give recognition to the total management efforts of an agency on improving effectiveness in identified problem areas or activities. Agency management will identify and spotlight operating problem areas or activities of high priority with a view toward developing and implementing- corrective courses. of action. This requires, in-depth assessment of existing functions, activities, and procedures. I establishing a management effectiveness program, the following policies, will be observed: a. The formal management effectiveness program will require estab- lishing a management system for identifying quantitative goals in the' "selected problem areas, evaluating performance, and identifying (No. A-44) . Approved For lease 2002/06/18: CIA-RDP83B00824F 00400050017-1 0. Performance indicators will be expressed in quantitative terms of units, tons,_nercentanes g-rosq doll u y. However, it is recognized that indicators chosen are measures of performance, and agency evaluation of the problem area usually will involve additional factors standards of measure most appropriate for theindividu -other a al area(s) selected for st d ductivity. ease pro- some of which cannot be reduced to quantitative terms. f. In most cases, existing data be sufficient for evalua- tion. However, when major deficiencies or voids in the data are identified, a new data base will be established to obtain the inforraa tion necessary to measure and evaluate performance. g.. If dollar savings are achieved, the results will 'also be reported under the cost reduction element. 4. Cost reduction. a. Policy. The following policies will be observed in contin uing agency cost reduction activities: 0. (1) The head of each department and agency will assume personal responsibility for improving the efficiency and economy of his agency programs and activities. (2) Management at a?11 levels will undertake vigorous and continued efforts to improve operating procedures and techniques, eliminate nonessential activities and positions and incr (3) Encourage innovation and ingenuity in the development of new and improved tech" .f i o ac.~i objectives; and eving program p on y an d .marginally effective activities; (2) Develop new and less costly methods b. Cost reduction plans. Each.department and agency head will prepare specific plans which will systematically: (1) Identify and eliminate or curtail low ri t n actvit~.es and by improving manpower control and utilization. (3) Agencies will make every effort to accomplish unpro- grammed workload requirements without additional staff resources through adjustments in previously programmed requirements and exist- i ques. or increasing productivity..:, ApprovedFor Release 2002/06/18 : CIA-RDP83B00823R000400050017-1 Approved For Release 2002/06/18: CIA-RDP83B0 3R000400050017-1 or organizational elements. goal for the current year will represent the savings expected to be realized from new and improved management actions compared with the actual cost in the immediately preceding year, or the most recently incurred costs, whichever is appropriate. In addition to this required overall goal, each agency should establish 'subgoals for major activities C. Monetary goals. A6 the beginning of the currant fiscal year, 'department and agency heads will establish a cost reduction goal. The deliberate managerial actions taken for the purpose of raising effec- tiveness or efficiency as opposed to management actions taken to carry out some public policy. Only reductions in costs or increases in revenues and fund availability which can be attributed to new or improved manage- ment actions will be reported as monetary savings under this program. (2) Monetary savings for the purpose of cost reduction reporting do not include such things as: d. Monetary savings. (1) Cost reductions reported annually must be the result of Reductions in outlays due solely to a decline in demand for agency output. . Reductions in outlays due to deferment of programs or 0 activities. Reductions in outlays or a department or agency as a result of transferring,responsibility'for a function .,to another agency, except to the extent of a net '. ;:.savings to the Government. Prevention of increases in operating costs resulting, from use of voluntary uncompensated overtime, rather, than increased staffing or paid overtime. Reduction in outlays based on the acquisition of excess property when funds for the purchases of. similar new property were not or normally would.not '`have been available. Reduction in outlays resulting from decisions made by authorities external to the reporting agency. e. Measurement of monetary savings. The monetary savings ?' which result or are expected to -result from each new or improved, management action will be calculated, separately identified, and reported for each of three fiscal years--the year in which the action: .,is taken and, where applicable, the next two succeeding fiscal years. The'savings reported for,the first year will represent the funds made. available as aresult:.of new or improved management actons and App'r'6v6' Por Release 2002/06/18 :' CIA'-RDP83B00823R000400050017-1 (Nn, Aral Approved Foelease 2002/06/18: CIA-RDP83B001W000400050017-1 (2) Reprogrammed to another appropriation or budget activity to finance other approved requirements. When this code is used, the anticipated use of the funds in.the gaining appropriation or budget activity will be reported. additional revenue resulting from such actions. The savings reported for each of the next two fiscal years will represent an estimate of the amount of additional funds which would be required in each of the years if the new or improved management actions had not taken place. Planned , expenditures which result from congressionally approved appropriations for the department or agency in the past year, or the most recently incurred costs, whichever is appropriate, will be used as a base in determining monetary savings. The actual savings in the past year and the estimatQd savings in the next two fiscal years will be dropped from the reporting system after each annual report. f. Identification, control, and use of savings. Each executive department and agency head will establish controls to assure that funds made available by cost reduction actions are used only for approved programs. The following categories, designated by (1), (2) or (3), will be used to identify the effect and use of past year savings: Cl) Used to finance other approved requirements of the report- ing unit. budget. (3) Placed in reserve, or applied to reducing the President's No. A-44) ppro ed For-Release 2002/06/18 : CIA-RDP83B00823R000400050017-1 Savings realized during the past year constitute additional re- sources for the agency to use. These savings may be reprogrammed to accomplish currently approved programs and activities which were not funded in the agency's past year budget. The current-year and budget- year effect of cost reduction actions must be identified so that appro- priate consideration can be made in the budget formulation and review .process for requirements that no longer exist in those years. g. Validations of savings. Each department and agency head will establish an internal system for the validation of reported savings. The term "validation" means an independent evaluation of the reasonableness and validity of amounts reported as savings. Respon- sibility for validation should be assigned to an organization inde- pendent of the claiming unit. be weighed .against the potential benefits to'be:gained; and reports are submitted to the Bureau of the Budget and the-President. In establishing the scope of examination, the cost of validation will For the purposes of this Circular, validation will consist of a review of an adequate number of individual savings actions before data Approvect Fcoelease 2002/06/18: CIA-RDP83B001S000400050017-1 Cl) Reported actions actually took place; ,(2) The savings reported represent reasonable computations .costs or improving operating effectiveness within their agency or on for Relea a 2004210&&18':.CIA-RDP83B00823R000400050017-1 to report his action in the management improvement program. LU ue successrul, personnel at all levels of an organization must be motivated to seek ways to improve management and efficiency in Govern- ment. For internal motivation, each agency should employ a variety of techniques to stimula~e improvement actions. These techniques include: award ceremonies, certificates o, merit, letters of apprecia- tion, recognition through publicity media, symposiums and workshops, money rewards (via Incentive Awards Program), etc. The objectives of these techniques are: (a) to cause a person to think innovatively; (b) to cause him to act on his innovative ideas; and (c) to cause him ;-Such procedures should be designed to provide reasonable assurance ? 'i'ile specific validation procedures used in each department and agency should be designed to meet individual situations encountered that:, and estimates of the savings which occur in the year reported and are the result of specific new or improved management actions; and (3) Reported savings are net of identifiable offsetting cost increases. 5. Idea interchange. An essential element of the. management improve- ment program is the Government-wide dissemination of management improvement information applicable to other organizations. Each agency should have an internal system for distributing information on management improvement actions to all of its organizational ele- ments. For external distribution of information, each'agency will identify in its annual management-improvement report actions considered applicable to other departments and agencies. Include a description of the action, methodology used, and any new approaches or techniques applied. Program incentives. In order for the management improvement nroaram Items chosen should be carefully screened for relevance to other Government agencies. The descriptions should be concise and include a point of contact for further information. The Bureau of the Budget will consolidate the descriptions and distribute them to all agencies. In order to provide high level recognition of outstanding perform- ances, each agency head will have the opportunity to make nominations,' organizational units. which have done an.exceptional job of reducing 0 a Government-wide basis. The nominations should include a detailed description of the efforts involved and the results achieved, and will be included in the management improvement report. They will be reviewed by the President's Advisory Council on Management Improve- ment which will recommend to the President the individuals a;;:: organ- izations to receive Presidential recognition. 7. Periodic study of Government-wide operations. Periodically, the Bureau of the Budget will choose a common operational area for Government-wide study. For each study area, an interagency steering: group will be established to coordinate the effort and write a final, report on the results and conclusions of the study. Agency management will focus on the selected ar-as and submit a report on accomplishments which will include resulting dollar savings, management improvement actions taken, and plans for future improvements and controls in the area. Possible areas for study may iclude common administrative functions, records management, travel and transportation, communications, printing and reproduction, etc. The Bureau of the Budget will notify agencies of the start of this program element and will transmit detailed instructions.',,.: ROBERT P. MAYO,' Director Attachment,, Approved. For Release 20 No... A-44) Approved _For Rele*2002/06/18 : CIA-RDP83BOO823ROO0050017-1 ATTACHMENT A Circular No. A-44 Revised GUIDELINES FOR PREPARING THE. MANAGEMENT IMPROVEMENT REPORT 1.. Management effectiveness. a. Definitions. (1) Area. An area represents a priority problem or activity which has been selected for coverage under the program. (2) Current year goal. An approved quantitative objective representing the desired performance to be achieved during the' current fiscal year for a specific area. (3) Performance evaluation. An appraisal of performance measurement data to ascertain exceptional accomplishments, identify shortfalls and their causative factors, isolate current and impend- ing problems, and develop meaningful recommendations for further improvement. (4) Performance indicator. A significant quantitative' measurement of performance in the problem area which provides the best perspective of the total management effort being applied to the problem or activity. (5) Performance measurement. The recording-and comparing of current accomplishments against-past experience and approved goals. b. Reporting. Each agency will prepare a plan'identifying the problem areas to be studied during'the current year. In preparing the plan only the most urgent problem areas and activities need be selected for inclusion. For each area thus selected,.appropriate performance indicators will be chosen which provide the basis for evaluating the overall status of the area being reviewed and for taking necessary corrective action. (1) Performance goals. Goals will be established for each area selected for the current year. In addition, an optimum goal will be established for areas.which require long-term management attention.. (2) Progress. A report on annual progress.will include:. The identification and, scope of areas selected; Goals established; proved For Release 20(NO06A-64:4IA-RDP83BOO823R000400050017-1 Approved Fo.r ReleasS02/06/18: CIA-RDP83B00823R0004 0017-1 .Performance achieved; ? A succinct performance evaluation covering 'achieve- ments :rid problems; and - Identification of corrective actions taken or planned. (The initial report, due September 30, 1970, will include the name and scope of areas selected for study and related goals for fiscal year 1971 and a summary of any significant management improve- ment projects completed during fiscal year 1970.) c. Instructions for preparing report. A form covering the above information will be prepared for each problem area designated by the agency for evaluation. The following instructions are pro- vided for completing the form (see Exhibit 1): Cl) Submitted by. Enter the name of the agency preparing the report. studied. (2) Area. Enter the name of the appropriate area being (3) Fiscal year. Enter the current year. (4) Period from/to. Enter the beginning and ending date of the fiscal period covered by the report. (5) Performance measurement. This segment of the format will be used for: identifying the performance indicators selected for meauring management progress for the area; base period refer- ence identification; recording of the base year and current year performance; and the approved goals applicable thereto. Each line .used will be completed as follows for'the columns identified below: (a) Performance indicator. Enter performance indicator(s) chosen for the area. (b) Base period rcfercnce idens-i. is ;.t~ on. Enter in the first column the base period reference identification applicable to the performance indicator being reported. The base period reference identification is included on the reporting format: i.e., A - Preceding fiscal year (cumulative annual results) and B - June 30 of preceding fiscal year (performance level or status as of June 30).. (c) Base year. Enter base period performance data in accordance with the base neriod reference identification selected. (d) Past year. Enter past year performance data reflect- ing management,prograss for pus fiscal':sporting period. App.rov d For Release 2002/06/18 to ~P83B00823R000400050017-1 Approved For Releas*02/06/18 : CIA-RDP83B00823R0004050017-1 (e). Goals. Under past year, enter the performance goal established last year and under current year enter the performance goal planned for this year. (6) Performance evaluation. Provide a concise summary evalua- tion of results by comparing actual performance against p..;c experi- ence and approved goals for each performance indicator. When appro- priate, cite specific actions which have contributed to improved performance in order that other agencies might benefit from the experience .gained. Provide an analysis of shortfalls and indicate 'corrective actions initiated or required, including a target date for completion or return to the desired performance level. 2. Cost reduction. a. Definitions. (1) New management actions -- those internally conceived procedures, policies, innovations, or decisions which, when applied for the first time, reduce the cost of a specific function or increase revenue or fund availability. A new action is one that has never been applied before by the reporting activity. It may have been applied elsewhere in the overall parent organization but must not previously have been applied by the activity or organiza-. tion reporting the cost reduction. (2) Improved management actions -- those changes both in substance and emphasis, with respect to existing procedures, policies, and techniques, which reduce the cost of a specific function or increase revenue or fund availability. Actions which have been previously applied but which have,been revised, changed, emphasized or otherwise improved are included in this classification. (3) Past year -- the fiscal year being reported upon. (4) Current year -- the fiscal year in progress at the time the annual report is submitted. in areas other than where savings are ::.:)orted. (5) Budget year -- the fiscal year following the current year. (6) offsetting costs -- all costs incurred as a result of implementing a particular management action, including costs incurred (7) Cost reduction goal_-- a total monetary objective for the effect'df cost. reduction actions to be.'taken during.the.current... agenccprbved For. Release 2002/06/18 : CIA-RDP83B00823R000400050017-1 'tain the goal:for.,the current year and any subgoals established by the (1) Annual goal.' ..This section of the ar .ual report will con- b. Reporting. Approved For ReId 2002/06/18: CIA-RDP83B00823R0OS0050017-1 (2) . progress reporting. This section will cover the results of actions taken during the Past fiscal year., It will show cost.reduction actions taken during the past year oward reaching the overall cost reduction goal and resulting monetary savings. It will also contain a narrative statement and a summary recap of progress. .against the overall goal and any subgoals established by the agency. (3) Narrative statement. This section will contain items such as the following:. General sutr;,iary comments and analysis of accomplish- ments in relation to the overall goal and to any subgoals established. - Specific actions taken during the year which assisted. in the achievement of the goal. - Progress on employee increased productivity and effi- ciency programs. - Reductions in manpower requirements which resulted from cost reduction actions being reported. The identification of any problems in accomplishing the goals which require the assistance of the Bureau of the Budget, the- President, other departments -andagencies, and new or revised legis- lation. (4) Summary recap of savings. This section of the report will contain the following data as minimum: ,..A brief description of each area (program, project, activity,etc.) for which a goal was established. - The monetary savings goal which was.assigned.,- - The estimated budgetary effect in the current and budget year. as a result of cost reduction actions taken in the, past fiscal year and.summarized by major organizational units.' fiscal'year. The nrionetary savings actually achieved during the past Proposed disposition of anticipated savings using the categories in paragraph 4.f. . ? - 'A summary of.past-year reductions in authorized positions? resulting from cost rcduction.actions covereu oy.too:.repgrt..:::,. Approved For Relele 2002/06/18 : CIA-RDP83B00823R00?0050017-1 complete evaluation).:.;. nclude a `stateme;it of his scope of the :area under review p r ved`Far-R' ease-2.002/06/16 CII 83B00823R000400050017-1 MANAGEMENT EFFECTIVENESS 1. SUBMITTED BY: Department of Government ARBA: Processing of Grant Appli? .ions. 3. Fiscal year: FY 1969 4. Period from: July 1, 1968 To: June 30, 1969 5. PERFORMANCE M1jASUR-Ft/il:N'r Performance a.? Performance indicators c. lease d?. Past t *BPRI Year Year 1969 ! FY 1968 FY ~ _ -- Number of applications A processed 1 Number of applications not assigned for review B (end of year) Number of applications B over 6 months old A EXHIBIT 1 Circular No. A-44 Revised Past Current Year Year FY 1969 FY 1970 8,.000 10,500 1,800 1.500 800 S00 * Base period reverence identification:. A - Preceding-fiscal year B - As'of June 30 of preceding fiscal year 6. PERFORMANCE EVALUATION (Attach additional sheets as,, required for 7,600 8,300 -~----- 1,900 1,720 1,050 900 7.5 6.2. Approved- FcWlease 2002/06/1$,;, PIA-RDP83B0081W000400050017-1 Agency Management Improvement Program Efficiency and productivity increases, . Purpose ' Implementation Instructions In compliance with the provisions of OMB (BOB) Circular A-44 (Rev. ), dated February 16, 1970, a formal Agency-wide management improvement program is established. These instructions set forth policy, procedures and guidelines and assign responsibilities for carrying out a continuous effort to increase productivity, to improve operating efficiency and to reduce costs. I. Definitions For the purpose of these instructions, the following terms are defined: A. Management Effectiveness - Includes those actions taken which result in improved operating efficiency, increased productivity, and curtailment of redundant, low priority, and i marg nally useful activities. Such actions do not have to 'be measured in dollar values. B. Cost-Reduction - Includes those actions taken to increase productivity, improve, efficiency, and eliminate unnecessary activities when such can be measured reasonabl y accurately in dollars or manpower actually saved or repro- I . Pow A. The Agency management improvement program consists of 3. Special studies oi Agency-wide or inter-]directorate eIeae .2r0.02I06/16 :I CIA-RDP83B00823R000 activities. 5. Recognition of individual accomplishment in exceptional improvement actions. B. The key element of :Directorate management improvement ? programs is the annual identification of program and component cdst-reduction and management improvement objectives coupled with evaluation of actual cost-reduction accomplishments on a regular basis. This requires the development. of coherent quantitative measurements ofpxoSram or Component productivity and performance. Where such gkra~ffi a i""f ve factors are inconclusive, zziinformative, or impractical, qualitative or other informative techniques will have to be devised, This involves : 1. The development in each Directorate of procedures for computing the dollar value of cost-reduction or other management improvement actions taken and determining the assignment and dollar value of resources reprogrammed 2. Effective executive action to implement rational cost-reduction or other management improvement actions. 3. The recognition of individuals who achieve exceptional results or otherwise make a commendable contribution under the program. C. The program will include special inter-Directorate and Agency-wide studies. Deputy Directors, the Inspector General, the the Director of Planning, Programming, and Budgeting are encouraged Deputy to the DCI for National Intelligence Programs Evaluation, and to identify those activities which, they. feel need inter-Directorate or .agency IV. Procedures A. By 30 'June of each year, each. Deputy Director will submit to the Executive Director-Comptroller a formal management and cost-reduction, program plan. and report.: .The .`plan for :FY .1971 will e subzraitted by 31 December 1970 (see Section XX - Reports). B. Directorate annual plans will include four sections: Section -.'Management Effectiveness Goals (upcoming fiscal year). Section XX -'. Cost-Reduction Goals (upcoming fiscal year). Section XII Management Effectiveness Accomplishments,. (current fiscal year). Section XV''''~-" Cost-Reduction' Accomplishments (current fiscal year). 1. S ction I - Manalyem :n1: i'.Cfc.ctiyonc:sri Go,1111, 'T'his will covcr actions and studies the ]directorate intends to initiate during the upcoming fiscal year which can be expected to increase efficiency or reduce costs. Normally this section will include only those actions for which the quantification or identification of monetary (dollar) savings cannot be clearly estimated. year or the most recently incurred costs, whichever is. most appropriate. with the component's acbtal costs in the immediately preceding and znanp _where as-s-ib3e:-Cost-reduction goals must be realistic and represent actual savings expected as compared and component cost-reduction goals, expresse in o -ays .productivity. This section should set forth both Directorate business; and the definition of concrete actions to increase This section should focus on: critical analysis and evaluation of low priority or marginal activities; identification and development of less costly methods and techniques for doing utilized.to meet unbudgeted workload or program requirements. 2. Section 11 - Cost-Reduction Goals. This will cover those studies and actions to be undertaken during the upcoming fiscal year by the Directorate which may lead to savings measurable in dollars or manpower which will be or can be This section reports efficiencies achieved as compared with 3. Section III - Management Effectiveness Accomplishments. management, improvement planning goals, established in Section -I a. Reductions in costs due solely to a decline in demand for Directorate or component output or service. b. Reductions in costs due to deferment or postponement of new pro grams or activities. c. Reductions in costs resulting from the trans- fer of responsibility to another component, Directorate or Government agency except to the extent that there is a not savings to the Government. d. Reductions in costs due to uncompensated e. Reductions in costs based on the acquisition of excess property when funds for purchase of similar property were not or would not have been available. f. Reductions in costs due solely to over-estimates. of budgetary requirements. % g. Reductions in costs resulting from decisions made by authorities external to the Agency. C. The estimated budgetary impact of cost-reduction actions will be rclporto(l. The inojicta.ry :;avirig;:; which result or are expected from each cost-reduction or management improvement action will be calculated, individually identified, and reported for each of three fiscal years -- the .year inwbicb the savings occur and the two succeeding fiscal years. will also be described, including those recognized under .the incentive awards program. 4. Section IV - Cost-Reduction Achievements. This section will include actual dollar or manpower savings achieved as compared with planning goals identified in Section II of the pre~v_iouf3 ter! G st reduction ~ls _ Unanticipated cost-reduction achievements also will be reported in this section. Only reductions in costs which can be attributed to deliberate management actions will be reported under this program. Monetary savings or cost-reduction for this purpose does not include such things as: Savings i?k? E-orted for those succeeding fiscal years will represent an estimate of the funds or manpower which would have been required in each year if the improvement or reduction actions had not taken place. Thee data will be incorporated in the annual budget submission in a m anner prescribed in the annual budget call, D. Each Directorate will establish controls to assure that funds or manpower made available throujth the rnar-agernent irnproverr-rnt and co:~t-reduction prograrns3 are --,w-(l only for approved prograrr-ts or activities, including approved in':reaswu in the level of resources assigned to those activities. Savings will be reported by component, program category, s'ub-category and element and will reflect disposition of anticipated or actual savings in one or more of the following categories: 1. Reprogrammed or reallocated to approved require- ments of the affected component. 2. Reprogrammed or reallocated to approved requirements of Directorate components. 3. No longer required to carry out approved programs and either placed in reserve or applied to reduce the Agency's budget, V. Validation A. The Director of Planning, Programming, and Budgeting is responsible for the validation of the dollar or other unit value of reported savings and reprog:rammings resulting from the Agency's management effectiveness and cost-reduction programs. Validation will consist of a review of reported actions to confirm the accuracy of the amounts reported and their disposition or allocation to approved programs, prior to preparation of the Agency annual report to the Office of Management and Budget. B. Validation procedures should provide reasonable assurance that: 1. Reported actions actually took place. 2. The savings reported represent reasonably accurate computations, or estimates, of the savings which occurred in the:. year reported ;and are the result of, management initiative. ;Approved For. Release 2002/.0Pt18 CIA-RDP83B00823 Approved For Rise 2002/06/18: CIA-RDP83B00823R400050017-1 3. Repoi tcd savings are the not of ictontifiod, offsetting coca increases. VY.. 111tor-Diro ctorato Studies ;Approved For Release 2002/06/18 : CIA-RDP83B00823R000400050017-1 if al)l.plic:tblo, a Deputy Director will includc in tha Diroctorato annual pt;ai1 i'uL rcl)ort l as rocOMI-nr? )(lationl~ concerning aroab which he ,fouls require intor-Diroetorato or Agoney-wide study.. V11, Idea ln:crchan