SMA ORDER FOR RECONSTRUCTION OF TRACKAGE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R002300350001-1
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
November 9, 2016
Document Release Date:
December 18, 1998
Sequence Number:
1
Case Number:
Publication Date:
February 3, 1949
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 69.22 KB |
Body:
25X1A2g
I FORMA & T
COUNTRY Ge iany (Russian Zone)
SUBJECT S=-1A Ordor for Reconstruction of Trackage
PLACE 25X1A6a
ACQUIRED
DATE OF INF
b. Lay a stretch of railway line 1.5 Ian. long near the Schbnefeld bone
25X1X6
CD NO.
DATE DISTR.
-4 F .b,, 1949
NO. OF PAGES
1
NO. OF ENCLS.
(USTED BELOW)
SUPPLEMENT TO
Gen, Kvashnin, head of the S14A Transport Division, ordered Besener, Director
General'of the Reichsbehn in the Soviet Zone, in an order of 6 October 1948
to carry out the following projects:
a. Reconstruct the Zossen-t;ittenvalde line as a rain line railway track.
This would entail the relaying of 6.5 km. of track, and the replacing
of 5 kmu of light track by Type "6" rails, capable of handling Type 52
locomotives.
C. 2stirmte the costs on the basis of a technical urination of the Zossen-
S chbnefeld line anci of the safety equipment on this line.
d. Stert work at once and terminate it at the latest by 15 December 1948.
ev Propose the transfer by the Brandenburg provincial railways of the following
stretches to RBD Berlizi:
Zossen--littenwalde.
tiittenwalde 4%pchin.
Iittenwg1de-Wusterhausen.
TIittenwalde-Schhnefeld.
2a Gene Petrov, con^ander of RID Berlin was to be poreonaliy responsible for the
supervision of the execution of this order.
25X1A6a
Corm mgt: An independent source allegedly stated, from personal Maori..
edge, that the Spree and Toltow bridges on the Kaulsdorf-Grunau line were
both double trac]:e3 on 19 October 1948.)
CLASSIFICATION
.2mm Wdoimm - U.S. OFFICIALS ONLY
t .tisi-i'i,. :}:S TY.:.;.
Sanitized - Approved For Release : CIA-Rfl2=O0g151?P0230Q$,,Q1-1