RAILROAD FERRY CROSSING VIET TRI, NORTH VIETNAM

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79-00849A000500040004-1
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
March 8, 2006
Sequence Number: 
4
Case Number: 
Publication Date: 
October 28, 1966
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79-00849A000500040004-1.pdf195.93 KB
Body: 
CONFIDENTIAL Approved For Release 2006/03/16 : CIA-RDP79-00849A000500040004-1 (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER II ATTACHMENT TO L-2210 28 OCTOBER 1966 PAGE 1 RAILROAD FERRY CROSSING VIET TRI, NORTH VIETNAM 2117N 10526E (SEE NPIC BRIEFING BOARD L-1104 FOR COMPARISON) 1. SIGNIFICANCE: THIS BRIEFING BOARD DEPICTS A NEWLY IDENTIFIED RAIL FERRY CROSSING OVER THE SONG LO (RIVER) AT VIET TRI, JUST WEST OF THE DESTROYED VIET TRI RAILROAD AND HIGHWAY BRIDGE 2. BACKGROUND: THE VIET TRI RAILROAD AND HIGHWAY BRIDGE, LOCATED APPROXIMATELY THIRTY NM NORTHWEST OF HA NOI, ACCOMMODATES THE PRINCIPAL HIGHWAY (ROUTE 2) AND THE ONLY RAIL ROUTE BETWEEN HA NOI/HAI PHONG AND YUNNAN PROVINCE IN SOUTH CHINA. WITH THE DESTRUCTION OF THIS BRIDGE BY U.S. AIR STRIKES IN JUNE 1966 (THREE SPANS DESTROYED, ONE SPAN SEVERELY DAMAGED), THROUGH RAIL TRAFFIC BETWEEN LAO CAI AND THE HA NOI/HAI PHONG COMPLEX WAS STOPPED. 3. MISSION READOUT: RAIL SPURS UNDER CONSTRUCTION IN THE VICINITY OF THE DESTROYED RAILROAD AND HIGHWAY BRIDGE AT VIET TRI. RAIL SPUR (1): A COMPLETED RAIL SPUR EXTENDS SOUTH THEN EAST FROM THE MAIN HA NOI/LAO CAI RAIL LINE AT UTM WJ457551, PARALLELING THE NORTH BANK OF THE RIVER, AND TERMINATING AT UTM WJ464551. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and most be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. l W y&dl F j1N"regP06/03/16 : CIA-RDP79-00849A000500040004-1 1 CONFIDENTIAL Approved For Release 2006/03/16 : CIA-RE '7 UPIRIM0040004-1 (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER ATTACHMENT TO L-2210 28 OCTOBER 1966 PAGE 2 RAIL SPURS (2) AND (3): FLOOD WATERS HAVE TEMPORARILY INTERRUPTED CONSTRUCTION ON TWO RAIL SPURS WHICH EXTEND SOUTH FROM THE MAIN LINE AT THE SAME POINT AS SPUR (1) AND TERMINATE ON THE NORTH BANK OF THE RIVER AT UTM wJ458549 AND UTM WJ459549. RAIL SPUR (4): ON THE SOUTH SIDE OF THE SONG LO (RIVER) ANOTHER RAIL SPUR UNDER CONSTRUCTION IS INUNDATED. THIS SPUR EXTENDS WEST THEN NORTHWEST FROM THE MAIN LINE AT UTLI WJ475541 TO TIIE SOUTH BANK OF THE RIVER AT UTM WJ461547. RAIL SPUR (5): A FIFTIi RAIL SPUR IS UNDER CONSTRUCTION WHICH EXTENDS NORTHWEST FROM THE MAIN LINE AT TtIE SAKE POINT AS SPUR (4), GENERALLY PARALLELS THE MAIN LINE TO UTM WJI:66549 WHERE IT IS INTER- MITTENTLY UNDER CONSTRUCTION WEST-SOUTHWEST TO ITS TERMINUS AT UTM 61.1462545. TRI1CK ?LAG BEEN LAID FROM THE RAIN LINE TO UT-1 WJ486547. PONTOON HIGHWAY BRIDGE SECTIONS ARE OBSERVED ON BOTH BANKS OF THE RIVER, WEST OF THE DESTROYED RAILROAD AND HIGHWAY BRIDGE. THE RAIL NETWORK AT VIET TRI: A SHORT RAIL SPUR EXTENDS NES1' FROM SPUR (1) AT U'TM WJ463551 TO A SERVICEABLE FERRY SLIP ON THE NORTH BANK OF THE RIVER AT UTM WJ462550. RAIL SPUR (1) IS UNDERGOING REALIGNMENT IN THE VICINITY OF UTM WJ460550. RAIL SPURS (2) AND (3) REMAIN INUNDATED. CONSTRUCTION HAS RESUMED ON SPUR (4). A REALIGNMENT NEAR THE TERMINUS OF RAIL SPUR (5) EXTENDS These notes have been prepared for briefing purposes only and should not he used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue For information concerning these notes contact Chief. Collateral Support Di ision NPI nnsmnTIR ? CID-pnp79-nnRggA000s0004O00d-1 Approved For Release 2006/03/16 : CIA-RDF948O MANOOO40004-1 (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER REFERENCES: I I ATTACHMENT TO L-2210 28 OCTOBER 1966 PAGE 3 TO A SERVICEABLE RAIL FERRY SLIP ON THE SOUTH BANK OF THE RIVER. TWO POSSIBLE TRAMWAY CABLE ANCHORAGES ARE UNDER CONSTRUCTION ON THE SOUTH APPROACH OF THE DESTROYED RAILROAD AND HIGHWAY BRIDGE. A PONTOON BRIDGE IS LOCATED WEST OF THE DESTROYED BRIDGE WHERE PONTOON SECTIONS WERE OBSERVED ON THE JULY PHOTOGRAPHY. TWO TRUCKS ARE OBSERVED ON THE ROAD IMMEDIATELY NORTH OF THE BRIDGE. 4. SUBSEQUENT COVERAGE: REVEALS THE FOLLOWING ADDITIONAL INFORMATION: TRACK HAS APPARENTLY BEEN LAID ON THE SECTION OF REALIGNMENT OF RAIL SPUR (1). SPUR (2), WHILE STILL PARTIALLY FLOODED, HAS A SECTION OF EMPLACED TIES. A PROBABLE PILE DRIVER, CONSTRUCTING WHAT WILL PROBABLY BE ANOTHER RAIL FERRY SLIP, IS OBSERVED NEAR THE TERMINUS OF THIS SPUR. RAIL SPUR (3) REMAINS UNDER WATER. TRACK IS OBSERVED ON SPUR (4) FROM THE SOUTH BANK OF THE RIVER AT UTM WJ462547 TO THE LIMIT OF PHOTOGRAPHIC COVERAGE AT UTM WJ468542. SPUR (5) IS COMPLETE AND OPERATIONAL. L These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support L ms~Ryn4wa ? rln ono~o QQ2'19 10004 1 r KAPIRIAI PRMTRRRAPMIC IMPERPRET&W CENTER RAILROAD FERRY CROSSING Approved For Release 2006/03/16: CW Dl3N-0M d60 -1 21-17N 105-26E Approved For Release 2006/03/16 CIA-RDP79-00849A000500040b04-1 E zE oo?a~ w H W a z E r-+ Q W E O C> x to HH E- 9 G B o