NAVAL BASE AND SHIPYARD CHIANG-NAN DOCK CO SHANG-HAI, CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05929A002500050001-8
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
3
Document Creation Date:
December 28, 2016
Document Release Date:
November 20, 2006
Sequence Number:
1
Case Number:
Publication Date:
June 4, 1967
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP78T05929A002500050001-8.pdf | 180.96 KB |
Body:
rpproved Fo,rTRR le e ff/il 1720 . CIA - T05929AO02500050001-8
4 June 1967
Page 1
Copy 5 8
3. REMARKS:
4. COLLATERAL:
5. FIRST IDENTIFICATION:
6. NEGATION DATE:
NAVAL BASE AND SHIPYARD CHTANG-NAN DOCK CO
SHANG-HA.I, CHINA
TWO UNIDENTIFIED SUBMARINES OBSERVED UNDER CON-
STRUCTION. THIS IS THE FIRST SUBMARINE CONSTRUC-
TION OBSERVED AT CHIANG-NAN SHIPYARD SINCE AUG 66.
HUANG-PU CHIANG AT 3112N 12129E.
FACILITIES CONSIST OF 12 BUILDINGWAYS (3 WITHIN
A SECURED AREA AND USED FOR SUBMARINE CONSTRUCTION),
3 GRAVING DOCKS, 2 OFFSHORE WHARVES, 1 T-HEAD PIER,
2 BREASTING PLATFORMS, 2 PONTOON PIER SECTIONS, 6
CRANEWAYS WITH 7 JIB CRANES, 2 FOUNDRY BUILDINGS, 2
LARGE FABRICATION BUILDINGS, NUMEROUS SMALLER SHOP/
SUPPORT BUILDINGS, AND AT LEAST 3 ADMINISTRATION
BUILDINGS.
These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use
should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re-
porting period as indicated by the date of issue. For informs
Division, NPIC.
TOP SECRET
25X1
Approved For Release 2006/11/20: CIA-RDP78TO5929AO02500050001-8
4pproved For Release 2006 78T05929A002500050001-8
TOP SECRET
c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
Attachment t
4 June 1967
Page 2
7. SUBSEQUENT COVERAGE:
ONE TALENT,
14 KH-4, 6 KH-7,
25X1
25X1
8. DIMENSIONS/
SPECIFICATIONS:
9. MISSION READOUT: TWO UNIDENTIFIED SUBMARINES ARE OBSERVED UNDER
CONSTRUCTION ( 1 UNIT IS PARTIALLY COVERED BY WEATHER SHEDS AND THE OTHER IS
PARTIALLY ASSEMBLED ON THE UPSTREAM SUBMARINE BUILDINGWAY). SEVERAL HULL
SECTIONS INCLUDING A FORWARD MID-SECTION AND A BOW SECTION ARE POSITIONED IN
THE BUILDING AREA. LOCATED WITHIN THE COMPLEX ARE 1 W-CLASS SS AT THE DOWN-
STREAM WHARF, 1 PROBABLE W-CLASS SS IN THE DOWNSTREAM GRAVING DOCK, 1 PROBABLE
RAIL FERRY UNDER REPAIR/CONSTRUCTION, 1 PROBABLE DREDGE UNDER CONSTRUCTION, 2
MERCHANT SHIPS AT THE UPSTREAM WHARF (THE LARGER WAS RECENTLY LAUNCHED AT THIS
SHIPYARD), 8 UNIDENTIFIED SMALL CRAFT AT THE UPSTREAM WHARF, 3 FLOATING CRANES
(2 IN THE UPSTREAM GRAVING DOCK), 3 WORK BARGES, 1 POSSIBLE SMALL COMBATANT
FITTING-OUT, AND 2 SMALL VESSELS (APPROXIMATELY 100 FEET LONG) AT THE DOWN-
STREAM FITTING-OUT WHARF EACH WITH 2 WHITE ELONGATED OBJECTS (SLIGHTLY RESEMBLING
KOMAR-CLASS PTG LAUNCHERS) LOCATED AFT ON THE HULL.
These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use
should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re-
porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support
Division, NPIC.
TOP SECRET
Approved For Release 2006/11/20: CIA-RDP78TO5929AO02500050001-8
Approved For Release 2006/11/20: CIA-RDP78T05?29A002500050001-8
NATIONAL PIIOT06NAW NITER TATM OM,
NAVAL BASE AND SHIPYARD CHIANG-NAN .DOCK CQ.
SHANG-HAI, CHINA
31-12N 121-29E
SEE REVERSE SIDE FOR cOPVANV&ed For Release 2006/11/20: CIA-RDP78T05929A002500050001-8