INTERIM VERBAL REPORT TO PROJECT 8035 ANALYST, 10 OCTOBER 1980.

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP96-00788R000500030014-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
1
Document Creation Date: 
November 4, 2016
Document Release Date: 
June 10, 1998
Sequence Number: 
14
Case Number: 
Publication Date: 
October 10, 1980
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP96-00788R000500030014-0.pdf65.69 KB
Body: 
Approved For Releas IA-RDP96-00788R000500030014-0 Interim verbal report to Project 8035 analyst, 10 October 1980. Target was the thirSGAthe list provided telephonically. Geo coordinates wer Following is gist of the description provided: a. A column of fire going straight up. b. A desolate, but rolling area with the ground opening into a mound. c. Several large holes over a wide area, four or five. d. Slight border of green on the left. e. A metal domed shape like an old hangar, made of metal. f. Approximately four very heavy fork lift type vehicles working inside the hangar-type building. g. Looked like a big storage area for huge pipes 3'-4' in diameter. h. Feeling that what was being looked for was already gone. Directed=to go back in time and look for that which was being sought. a. A rocket vehicle of some sort, poised to take off, in the ground. b. Time of acquisition of target: approximately 12 days prior to 09 October 1980. Directed to return to the warehouse/hangar type building and present time. a. Same large cylinders, feeling of maintenance. b. Move to 12 Oct 80 - large cylinder gone. c. 15 Oct working on something smaller. d. 18 Oct - assembly of a front portion to the main portion. e. 18 Oct feeling of final assembly. There are three section to then"thing" f. The front is the "carrier", the center is the power source, the tail, is the fuel, having almost a "needle" nose cone, which later appeared more rounded. a. Device rolled out of warehouse on several carriers to the field. (no appreciation for distance) b. No people going on it. c. Research, picture taking. d. Time to launch from the last day of future (18 Oct 80) + 2 days for movement ( O/A 20 Oct 80) + 2-3 days for launch (O/A 22 - 23 Oct 80) NOTE: Activity level was most intense during the period in which the three section were being assembled, circa 18 Oct 80. Approved For Release 200 0788iR00,g8'0Q00014-0