ELECTRONIC REPAIRS AND SERVICES

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A001700080014-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 24, 2005
Sequence Number: 
14
Case Number: 
Publication Date: 
October 28, 1970
Content Type: 
CONT
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A001700080014-2.pdf103.58 KB
Body: 
25X1 ar- ^ SECRET Approve o leas 2000700120 r Wky"Pt-N[CP0U4l U I 1W PM8M 14 z CONTRACT INSPECTI REPORT [ TO: ? 28'October 1970 INSPECTION REPORT NO. (If final, so state) Final ESTIMATED COMPLETION DATE NAME OF CONTRACTOR Declass Review by NGA. TYP Electronic Repairs and Services THE CONTRACTOR I~S ON SCHEDULE THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED FUNDS ? YES 0 No IF ANSWER IS "NO" ADVISE REC- ^ YES X^ NO QMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON ~ REVERSE HEREOF. IF KNOWN. INDICATE MAGNITUDE OF AD- .~y~( PER CENT OF WORK COMPLETED - 70/c DITIONAL FUNDS INVOLVED. PER CENT OF FUNDS EXPENDED 100? HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE. OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR DURING THE PERIOD? YES 0 NO (If yes, give details on reverse side.) HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO CONTRACTOR DURING THIS PERIOD? FL] YES ^ No (If yes, indicate items, quantity, and cost on reverse side.) INCENTIVES IS THIS AN INCENTIVE CONTRACT- --- ^ YES ? NO NOTE:-' --- - - - IF YES., CHECK TYPE T USE REVERSE SIDE FOR COMMENTS. n PERFORMANCE DELIVERY 0 0 COST O AWARD FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION. u FEE OVERALL PERFORMANCE OF CONTRACTOR 4. ^ ABOVE AVERAGE 7. ^ UNSATISFACTORY 1.- ^ OUTSTANDING J J 2. ^ EXCELLENT 5. ^ AVERAGE 3._ ^ VERY GOOD - 6, ^ MINIMUM ACCEPTABLE IF OVERALL PERFORMANCE OF. CONTRACTOR IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE REASONS ON REVERSE SIDE-. RECOMMENDED ACTION- CONTINUE AS PROGRAMMED ^ WITHHOLD PAYMENT PENDING - - - -! SATISFACTORY PERFORMANCE X^ CLOSE OUT - ^ OTHER (Specify) IF THIS IS A FINAL REPORT PUT COMMENTS ON REVERSE IN NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE AND CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT HAVE BEEN RECEIVED. THESE INCLUDE. WHERE APPLICABLE. THE FOLLOWING: L , DOES NOT DOES NOT ITEM REC D APPLY- ITEM RECD - APPLY PROTOTYPES - ' - - yes MANUALS -' - - - X DRAWINGS AND SPECIFICATIONS yes FINAL REPORT - - X PRODUCTION AND/OR OTHER SPECIAL TOOLING' X .. END ITEMS X OTHER GOVERNMENT PROPERTY yes- DATE OF LAST CONTACT WITH CONTRACTOR - - r 30 July 1970 - - 25X1 25X1 12-67 189 PREVIOUS F70 I TION 00 1 . L1 CONFIDENTIAL f CONFIDENTTAL_-.__?'_TTSECRET ^ UNCLASSIFIED E SECRET ? ARC DrAlikIease 20R W! Q IKTFk iP78B047740170008001 - C LASS I F I ED NARRATIVE REPORT I ^ INTERIM The purpose of this contract was to provide NPIC with a quick response capability for repairing complex electronic equipment and building elec- tronic modifications. Three work orders were exercised, two to repair the Digitized Measuring Light Table (which ]built) and one to fabri- cate a modification to an on-line terminal console. The three work orders were carried out, but the modification (a remote panel) was not checked out properly before installation. The engineer had not thoroughly evalu- ated the problem and did not realize that his proposed hook up would only work in one mode of operation. In attempting to hook up the remote unit, the engineer apparently shorted a circuit in the terminal (blowing a transistor), which required two hours for NPIC technicians to locate and repair the damage. After the engineer "installed" the remote unit and left, it was found to have a bad circuit in it, 120 volt leads were not covered, and other wires were left hanging. Since the contract expired before the remote unit was operating properly, the contractor could not be forced to alleviate the problems. NPIC technicians disconnected the remote unit so the main-terminal could be used. After some delay, drawings.were supplied. NPIC technicians were able to repair the remote unit and in- stall it; but the unit failed shortly thereafter, and NPIC technicians have not had time yet to troubleshoot it. The Total Authorized Funding for this contract is I certify all deliverable items have been receive . 25X1 25X1 25X1 ^ UNC LASS IF IED x^ (05/20 : CIA-RDP78BO477OA001700080014-2 CONFIDENTIAL ^ SECRET