TRIP REPORT (Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04770A000100110050-5
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 28, 2004
Sequence Number: 
50
Case Number: 
Publication Date: 
September 26, 1966
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP78B04770A000100110050-5.pdf80.72 KB
Body: 
proved For Release 2005/02117_': CIA-RDP78B04 000100116,595 Flo-( TID/TAB . 96/66 26 September 1966 MFG 4ORANDU:A FOR THE RECORD 25 1. The purpose of this trip was to run preliminary acceptance tests on the AP-3 Analytical Plotter. 2. The materials used in performing this test were: a. Panoramic photography from Mission G'1' 64-225 over Phoenix, Arizona. b. Terrestrial photography from the test materials in front 3. A relative and preliminary absolute orientation was made on the Panoramic model. While setting up this model, a few errors were discovered in the program. These corrections were made immediately by the 0 oplee. The distance routine was checked in both the 5 micron and 1 micron accuracy modes. In both cases, all the dis- tance checked within plus two percent. This we attributed to the lack of true altitude of the aircraft and the lack of aircraft atti- tude for this 112B Mission. 4. An attempt was made to set up the terrestrial model. Due to the lack of a parallax routine to place in the computer, an ana- lytical parallax solution couldn't be performed for this model. A reiterative method of clearing parallax was attempted) but there wasn't enough time to complete this test. Therefore, this test will be completed when the instrument is set up in NPIC. 5. Delivery of the Anamorphie Optics and the Beaver Ball Screws are behind schedule. These will be retrofit in NPIC instead of delaying delivery of the instrument while awaiting delivery of the Anamorphics and the Ball screws. Approved For Release 2005/02/177: CIA-RDP78BO477OA000100110050-5 i lease 2005102/17: CIA-RDP78B0477 t 000100110050-5 TID/TAB - 96/66 Page 2 SUBJECT: Trip Report 6. Upon completion of the evaluation test, told to go ahead and ship the AP-3. The tentative pick-up date for shipment to NPIC is 28 September 1966. Production Section Technical Analysis Branch Distribution: Orig. Chief, WPIC/TID/TAB (Route to C/TID and return) 1 - Aset. for P&D, Attn: 1 - Chief, NPIC/TID/TAB/P 1 - Chief, NPIC/TID/TAB/. Chief, NPIC/TID/TAB File Approved For Release 2005/02/17 : CIA-RDP78B04770A000100110050-5 25 25 25 25