DEAR RAY:
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A001100020005-3
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
16
Document Creation Date:
December 28, 2016
Document Release Date:
December 2, 2004
Sequence Number:
5
Case Number:
Publication Date:
June 6, 1968
Content Type:
LETTER
File:
Attachment | Size |
---|---|
CIA-RDP78B04747A001100020005-3.pdf | 352.14 KB |
Body:
STATINTL
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
Attachment to
TS pAD.zcr8168
June 6, 1968
STATINTL
Dear Ray:
Enclosed is a detailed breakdown on man-hours and cost for
our proposal no. 6927-59. (Microdensitometry Support). Some of
these are essentially continuations of previous work (Task 1,
Task 4, and Task 5). Tasks 2, 3, and 6 are additional efforts.
The work statement submitted to you earlier covers the
documentation that will be provided with the computer programs.
I have enclosed a copy of it for your convenience.
If you have any questions, please don't hesitate to call.
Sincerely,
STATINTL
Scientific & Engineering Applications
WWM:mis
encl.
0
Declassification Review by NGA/DoD
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
Attachment to
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO0110d' ( -084/68
STATINTL
will provide technical assistance, as
required, to establish operating procedures which will produce valid
STATINTL output from the
1032T trichromatic microdensitomater. This
work will include an investigation to determine proper location of
filters.
STATINTL 2. will provide information processing routines
for automatic data reduction of the microdensitometer output. These
routines will facilitate technical and intelligence analyses of single
and multilayer emulsion films. The documentation furnished in support
of these routines will include:
a. Complete listing of the deck for each FORTRAN program.
b. Documentation for each FORTRAN program consisting of:
1. Block diagram of the program showing the exact
flow of this data and operation preformed on it.
2. Detailed description of all input data such as;
range and number of data values; purpose, definition and values of
all constants; settings on the NPIC Microdensitometer that are peculiar
to the program.
3. Detailed description of all output data such as:
range of values; what the cause could be if the values are out of
range (assuming the program is in production status; what assumption
and conclusion can be drawn from the output.)
4. Detailed description of all mathematical analysis
methods in the program, equations and relevant diagrams.
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
TATINTL
r.,.3
STATINTL
will provide test targets and test routines for establishing
the validity of any scan or series of scans made on the micro dons itometer.
will provide technical assistance, as required, in the gen-'
4.
oral areas of photoscience, electronic engineering, computer programming and optical
analysis.
TATINTL 5. will investigate the application of various lens combinations
to reduce focus depth effects when scanning multi-layer emulsions with various wave
length of light.
TATINTL
6. 1will provide analytical and experimental support in the
development of image analysis and image processing techniques unique to the exploita-
tion field. Particular emphasis will be placed on the deduction of fundamental object
properties, e. g. , brightness contours, from the recorded image. In those cases
wherein the deduction of such data is not possible, the failure of physical description
will be identified and recommendations made as to future courses of action.
STATINTL
$TATINTL
7. will provide monthly status reports on the work accomplished
and the funds expended. These reports will be submitted within two weeks after the
end of the reporting period.
8. will provide a final report on the work accomplished. The
rough draft of this final report will be submitted thirty days before contract termin-
ation date, and the final copies will be delivered to the customer thirty days after
approval of rough draft.
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
Approved For Release 2005/02/10 CIA-RDP78BO4747AO01100020005-3
5. Desc~w,~~;:: -,,y option in the program and any
0
other uses the program might have.
6. Glossary of terms.
c. Complete set of test data for each program including
intermediate calculations and the output. Whenever possible all input
data to any program will be combined on magnetic tape in the format
generated by the microdensitometer. The only exception might be
when input to one program is output of another.
Approved For Release 2005/02/10 : CIA-RDP78BO4747A001100020005-3
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
0
exposure principle cannot be used in the computation of color MTF.
This task has five subtasks as follows:
a. Completion of the characteristic matrix program
b. Scalar array computation and regression fitting to generate
the equations relating image color to scalar array
c. Programming of the exposure table generator and exposure
selection procedure
d. Testing of the final color exposure generator
e. Reporting and Documentation
I COLOR EXPOSURE', TABLE GEL;ERA-OR
This task is the completion of the effective exposure table
selection and generation. Without this capability, the effective
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
0
0
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
TASK 1
Executive Engineer
Physicist
Analyst
Photoscientist
Programmer
Photographic Technician
Technical Writer
Publication Clerk
Illustrator
Engineering Overhead (100%)
TOTAL
MATERIAL
Computer Charges
Travel
G&Aat9%
HOURS
20
40
10
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
STATINTL
Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3
II COLOR GRAINJULARITY STUDIES
This task compares the granularity of color materials with
that of black and white materials on the basis of the mathematical
characteristic. The investigation takes the form of examining the
noise properties of color materials using three different techniques.
The following sub-tasks are required:
a. Record and sample preparation
b. Study of classical gaussion properties as they relate to
color materials.(Selwyn's law etc.)
c. Binomial Distribution Studies
d. Cross and auto correlation programs
e. Reporting and Documentation
Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
TASK 2
4 Executive Engineer
Physicist
Analyst
Photoscientist
Programmer
Photographic Technician
Technical, Writer
publications Clerk
Illustrator
TOTAL
Engineering Overhead (100%)
0
MATERIAL '
Computer Charges
Travel
G&Aat9%
Prof it
TOTAL
HOURS
100
270
245
145
20
40
10
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
STATINTL
Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3
0
III COLOR MODULATION TRANSFER FUNCTION
This phase initiates the study of the properties of MTF of color
emulsions. Its objective is to provide a means for MTF generation
and an analysis and interpretation of their value and meaning of such
measurements in the color situation. The study will be composed of
the following five sub-tasks:
a. Color target generation
b. Cooley-Tukey transform methods (edges, combs)
c. Standard transforms (edges, combs)
d. Analysis
e. Reporting & Documentation
Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
STATINTL
TASK 3
Executive Engineer
Physicist
Analyst
Photosc ientist
Programmer
Photographis Technician
Technical Writer
Publication Clerk
Illustrator
Engineering Overhead (100%)
TOTAL
Q Material
Computer Charges
Travel
G&A at 9%
HOURS
100
415
390
450
20
60
20
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3
IV DIRECTION COSIN: C>> I_ BRATIO\
This task completes work rcc;uired to implement the calibration procedure established
under previous efforts. The methods are well defined and all programming is completed and in
operation. The following tasks remain to be accomplished to make this an operational procedure.
a. Spectrophotometric work
b. Direction Cosine
c. Micro-D calibration
d. ,Reporting and Documentation
Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3
Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3
TASK 4
Executive Engineer
Physicist
Analyst
Photoscientist
Programmer
Photographic Technician
Technical Writer
Publication Clerk
Illustrator
Engineering Overhead (100%)
TOTAL
Material
Computer Charges
Travel
G&Aat9%
100
60
10
340
20
40
STATINTL
Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
TASK 5
Executive Engineer
Physicist
Analyst
Photoscicntist
Programmer
Photographic Technician
Technical Writer
Publications Clerk
Illustrator
Engineering Overhead (100%)
TOTAL
Material
Computer Charges
Travel
G&Aat9%a
HOURS
50
100
170
340
250
20
60
20
STATINTL
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
VI MICIO -ANALYZER OBJECTIVES ASSESSMENT
been noted in the selection of objectives for the current color
Discrepancies have
micro-densitometer. Achromat objectives, designed for metallographic use are not suitable'
for the precise location of focus of the micro- dons itometer with respect to the orientation of
the layers of a classical color tripack. This program will evaluate the chromatic abberation
and focus plane characteristics of current apo-chomat and planapo-chomat objectives.
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
STATINTL
0
TASK 6
Executive Engineer
Physicist
Analyst
Photosc ientist
Programmer
Photographic Technician
Technical Writer
Publications Clerk
Illustrator
HOURS
0
Engineering Overhead (100%)
TOTAL
Material
Computer Charges
Travel
G&Aat9%
TOTAL
500
20
30
20
Approved For Release 2005/02/10 : CIA-RDP78BO4747AO01100020005-3
Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3
COMBINED TOTAL HOURS AND COST
Executive Engineer
Physicist
Analyst
Photoscientist
Programmer
Photographic Technician
Technical Writer
Publication Clerk
Illustrator
0
Engineering Overhead (100%)
TOTAL
Material
Computer Charges
Tr ,vel
G&A@9%.
HOURS
400
250
400
1000
1165
1685
120
270
100
Approved For Release 2005/02/10 : CIA-RDP78B04747A001100020005-3
STATINTL