DELIVERY SCHEDULE FOR PRODUCTION UNITS OF THE(Sanitized) 1540 LIGHT TABLE

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05171A000400030071-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
12
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 7, 2005
Sequence Number: 
71
Case Number: 
Publication Date: 
October 15, 1970
Content Type: 
MFR
File: 
AttachmentSize
PDF icon CIA-RDP78B05171A000400030071-2.pdf880.21 KB
Body: 
, Approved For Release 2005/06/23 : CIA-RDP78605171A000400030071-2 NPIC/TSG/RED/SDB-048-70 15 October 1970 MEMORANDUM FOR TEE RECORD SUBJECT: Delivery. Schedule for Production Units of the Light Table 1. On 5-8 October 1970 a trip was made to 154o ml Ito review progress of the production contract for 1540 Light Tables. During this visit a problem was surfaced with respect to ,delivery of certain parts for the light tables. 2. On 1 October 1970 f?lwas-informed by a supplier in Oregon of die castings that they would be unable to meet a 7 October delivery date as originally estimated. Three parts, including the center film support bracket, would not be delivered until 21 October; and two other parts, the film drive housing and film drive housing cover, would not be de- livered until 28 October. In the delivery schedule, as revised on 11 September 1970 by 1---1 the first table was to be shipped on 28 October after preacceptance testing on 26-28 October. Obviously, delivery of the film drive housing and cover on 28 October would negate the delivery schedule for the light tables. 3. On 8 October 1970 Executive Vice President of visited the supplier in Oregon to investigate the shipping delivery schedule so as to decide on a.course of action that would minimize the effects of this latest-development. During the evening of 12 October, the undersigned was called by Project Manager responsible for production of the light tables, and advised that a course of action had been decided upon. 1111was resorting to a second source of supply to provide a limited number of parts for perhaps ten light tables until the supplier in Oregon could start delivery. This second source would produce sand castings rather than die castings. The supplier is in the Los Angeles area and supplied castings for the Mod II prototype developed by 1111 This approach requires new casting drawings, new machining drawings, modification of the existing Mod II casting patterns, and machining the castings. All of this is expected to delay shipment of the first production 1540 Light Table from 28 October to perhaps 30 or 31 October. Presumably, therefore, preacceptance testing would take place 28-30 October rather than 26-28 October. This estimate of a further slippage of two or three days in delivery of the first table is predicated on the ability of the supplier of the sand castings to meet his predicted delivery date. Illistates that this supplier has demonstrated his ability to meet deadlines in the past. Declass Review by NGA/DoD CROUP qrf Eratte frr! EZItneht N dan;:riir:!; and ULd-i! ! el,*-1r17-!:11 Approved For Release 2005/06/23 : CIA-RDP78605171A000400030071-2 1:77 Approved For Release 2005/06/23 : CIA-RDP78605171A000400030071-2 SUBJECT: Delivery Schedule for Production Units of the Light Table 154o 25X1 4. At present, fabrication of printed circuit boards; wiring harnesses; and sub-assemblies, such as frames and stands, is under way. Quantities of supplies are being received daily. The supplier of the die castings in Oregon appears to be the only major problem. 5. The present revised delivery schedule is as follows: Oct. November December Week beginning 25 1 8 15 22 29 6 13 20 27 Units/week 1 4 10 20 20 20 20 20 15 15 Cumulative total 1 5 15 35 55 75 95 115 130 145 Assuming slippage of 1 week: 1 8 16 20 20 20 20 20 20 1 9 25 45 65 85 105 125 145 Assuming slippage of 2 weeks: 1 9 18 21 24 24 24 24 1 10 28 49 73 97 121 145 ,Slipping the delivery schedule by two or three days probably does not 25X1 present any great, problem-I_ ls planning to start work with two shifts iMmediately to catch up. 6. However, if the schedule slips by one week, and only the first table is shipped during the week of 1 November, two shifts working a six- day week becomes necessary. Something like eight tables rather than four must be produced the second week, 16 rather than 10 the third week, and 20 units each week must be produced the rest of the year to meet the contractual requirement of 145 tables by 1 January 1971. If the schedule slips by two weeks, and the first unit is shipped during the week of 8 November, substantial increases in the production rate for the tables must be accomplished. Two shifts working a seven-day week, or perhaps even three shifts, may be required. 7. As of this date, the only contractual requirement is that will deliver 145 tables by 1 January 1971. Therefore, schedule slippage of any magnitude is not in default of the contract. However, it is the intent that the revised program schedule of 11 September 1970, outlined in paragraph 5, would become an amendment to the present contract. This Approved For Release 2005/06/23 : CIA-RDP78605171A000400030071-2 25X1 Approved For Release 2005/06/23 : CIA-RDP78605171A000400030071-2 ? SUBJECT: Delivery Schedule for Production Units of the Light Table 15110 25X1 has not yet been formally accomplished although has indicated, that such an amendment would be acceptable. It appears that I us making every effort to meet their verbal commitment and ship the first table some time during the week of 25 October 1970. Distribution: Original - Route and File 1 SDB/RED/TSG/NPIC SDB/RED/TSG/NPIC ?MT: . - Approved For Release 2005/06/23 : CIA-RDP78605171A000400030071-2 25X1 25X1 25X1 - Z-1400C00017000V141.9089/dCP:1-VIO CZ/90/900Z eseeieu -10d peAO-IddV IIIIIIIIIIIIIMINIMINIIIIINI IIIIIIIIMMONOMIIIIIIIIIMIIII OINIMMOMMIIIIMOMMIIIIIIIIII OIOUROUIMENIIIIIIIIIIINOMEI 11111111111111111111M11111111110111111 IIIIIMIIMEMIUM111111.1111111111 OONNOMON MOMIONOM II OlOOORMIONOOMOOOMOOOOMO Ol MIONNOMOMI 10.00000 NOO OlOOROOMONOONOIONOONO OIOOMMIIMOVOIOIONOOMINONOMION 1101NOOMOOMINOMOOOMMIOOMM MOONOINOOMMOOMOIONONOIN ONOVOLOORIOINOOMINININOOOMMOONNIONIOOMEMOOMMONOOONS OIONSOOONOSOOOMOOOMOMOMMI MOOMOIROOMOMOINIOOMIN IONONOOLO IMMOIONNOSSOIO MONONIONOIONIONIOMOOOO OVIOOmOOE2 ONOMMOMMOOIMMIIIIIIIIIIIIMOMINVOIONIO 1111100111 MOMMOONOO ORIONOOONOONIBONOLIIIIMOMOMONO UM NEJ 111111?111111111111111111111MMINIMOIS IMMONOIMOMMIIIMI in_____amai_ ___Aumunonsommusommi IMOMMIIIIMINNIONIKUVOIOIIIIIMOUIMINOUNIONIO101111 110111111111111122 OO, MEM WE OURIOCIVOCIOMMIUMIIII Fanumortung ua g mo I am 211111111MIIMI IIIOIMMIIIIIMIOIINIIOIIIOIIIILII 11111.0101111111111111MINOMI AillOOMOUNIONINIOMMIIIIIIIII IIIIMO111111111111111111111111111111 ;1111111111111Ellee BO MO 1111111OIMMUMO1128 ORAIONIMOO UM VIOSOMOIONUOMMIll O 111111411011111111 111111111111111110111111111111111110111111111111166 111111111111211111101 .1111111111111011111111110111111111011 liiiii1 INIMMUIIIIIIIMILIO '011OIOMMUOINOOMIONIIIIMIIIIMISAir IMIROMMIIIIIIMIII .102OCCEEMMINEEMEOCEO auaiauiuiuuuiiiiui imiMMIMBUIMINUMIMMI IIIIIRliIIIIIliIMUI uuuuuuuiuuuuiiiuuu uuuuiuiiuuuuuuuau 1111411MMIMIUMUIRIII=1 1dA 016 V64.-.2 ??-?7,* -7e,e1P4elyke 41. b1/.7 ? --"17 (r) - rp ? f-le/7.7 /2, t7'.e", 0 0 Si 51 0 a / 0,0, ()/ oc-4' 14, 0,'?/0/ -5/ 00 a mcgmourc?/ IIINOIONSIO 1012 201200/00/?0O 0), OM? cP)/?LIONNOMOV?/*/01MOOMOOMOON MONOOMOOMOOOMMOOMOSONOM Oirfilivip 1/OHOOMONOOMOI lONOVOIONOROOOmmOlOONO000 Ai i mousimmum -,Nimmuminamocommompul lama ....7?12,-- ,,,,,/ ,,, fr 4JMUMUMMUMMOOMOOMMOMONENOMMONI WEEMNINECUREUEZIOCCESSONCEI e OZ:6/ ? Z-LOOOOOPOOOVt.LO89LdI?3 CZ/90/900Z eseeleU jod peAwddv fr- er'Ste 04g/ ? 0 c:P c;+. NM 0Vd .1. 311103H3S INVHDOeld MO- 1540 Approved For Release 2005/06/23 : CIA-RDP78605171A000400030071-2 YR PROGRAM SCHEDULE 140.41c.,. WK / 9 70 . ? /97/ - .,?-ei . '77 en ? -7- - .4?.'x,.. Zter: -/ ",-L-e-ref ,v?,,,.Q ...9,,,w Af.s/f, ,72,A,.?"' _7Sr , 2 9 4- ?", 2 7 4 // '' * / -q r % 4 -; 7 0 17 7 3/ (1 g 7 -I I 3' 4c // 4' 4 2 9 * 5 6 4 i., // I I Ae,- A:1-,e ,e..,, / 4 6 ?:, %;, ..-, is- 6- .41W) /0/064., 640 ?BM/z c4.444 IIIUIIUIIIU(% ISM 11 litt 11 in /5-?1119611rf-stig tign q11- 2 11 701 Arre4INEPIMO 11 a 4/9.1-frAMMii-WIMMO II1853 IIliUIUII 41,70IIA1 11 OMMq3112M1-iii- MU a MO 103030M 11 I . WA1 IIIMM i ii i 110 Ke ii-? le?74-. le,dt. 64,6,30c, Z,4:0/7- 77q .94E' ?Q'/,' ullIllUlIllII MIN /-24,--.e