CONTRACT(Sanitized)MLT 1540-1 THROGHT-5

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B05171A000400030023-5
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
2
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 6, 2005
Sequence Number: 
23
Case Number: 
Publication Date: 
October 13, 1971
Content Type: 
LETTER
File: 
AttachmentSize
PDF icon CIA-RDP78B05171A000400030023-5.pdf117.57 KB
Body: 
Approved For Release 2005/06/23 CIA-RDP78B05171A000400030023-5 ~TAT 1. Y Bide Drive Motor Correspondence with the motor manufacturer has indicated the probability. of material -between the commutator'se ments causing partial shorting. in speed or inability to drive the bridge have been traced jo.a deposit. .Several failures of the Y bridge'drive -motor manifested as a reduction by the motor rrcriufacturer on future units.'Attcchment 1 it a procedure of excessive. oiling at manufacturer.;_Corrective action is be.ing.taken 6TA' T describing the discssembly.and caeaning of the commutator for.correction. of the problem as it occurs in the field. This procedure has.been distributed to.a_II roduct'Suppor I t personnel at sites where MLT-1540 Lio)t,Tabl.e's'are located. Off icar-!n -Charge USA Communicatins Service Group Post Office. Box 72 NAS Moffett Field, California 94035 required for you f o ?irrplerrent these changes and procedures. S,pecif ical ly thee items Product Improvement Program we are. providing the necessary instructions and parts required for improved. operation and reliability. In continuing, M LT-3164-1.,6188 13 October 1971: Analysis of maintenance data-on MLT-1540 Light Tables and d scussions'with the. users has shown several areas where minor modifications and maintenance procedures are referred to are as' follows: Approved For Release 2005/06/23-:-CIA-RDP78B05171A000400030023-5 Declass review by NGA/DoD ;_STAT. Approved For Release 2005/06/23 : CIA-RDP78BO5171A000400030023-5 2 ~'iNn ~ICri i C". C: r Switch Analysis of r`ailu;es o the ilm transpo+t motor ON /O i= ;.ritch and its application in circuit indicate a desirability of a change in wiring to increase the relicbility and reduce failures of this component. Attachment 2 describes tr; procedure for rewiring of this switch. Also included is the ch :; e to 'be made to the ricnuals indicating the new vriring, - 3. Vievtinq C ass i` c'unt it":a Replacement and cleaning of the light source lamps and lamp tray requires the removal of the viewing glass surface, At present the frame of the viewing glass rides on the tips of the leveling screws, Parts are presently being procured and procedures prepared to add an improved surface for the framework of the viewing glass to ride upon. This consists of spring clips over the surface of the screws on which" the viewing glass framework rides. This modification has been tested at the and is shown to work quite satisfactorily for ease of removal and replace- ment of the viewing glass surface. The required parts are expected from the vendor mid-October at which time a procedure and the parts will be dis- tributed. Installation of the.clips is very simple, being installed under the present hardware, thus requiring no change to the tables. We will make arrangements through our Product Support Organization to send these instructions and the necessary parts to the users sites. Should further information be MLT Program Manager, or the undersigned. Very truly yours, STATI STAT; Supervisor, Contract dmi n istrat ion . WGB:hj Attachments: 1. Field Service Procedure, Y Drive Motor P/N 37103-1, used on MLT 1540-2, -3, -4 2. Field Service Procedure, Film Drive Power Switch (S 4) P/N PS-50 Approved For Release 2005/06/23 : CIA-RDP78BO5171A000400030023-5