CABLE FROM (Sanitized)

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP99B00048R000100260009-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
6
Document Creation Date: 
December 12, 2016
Document Release Date: 
March 25, 2002
Sequence Number: 
9
Case Number: 
Publication Date: 
October 2, 1969
Content Type: 
CABLE
File: 
AttachmentSize
PDF icon CIA-RDP99B00048R000100260009-1.pdf214.31 KB
Body: 
Approved For Reba`.5e 2002/06/24: CIA-RDP99B00048R0UP100260009-1 S E C R E T IN 38199 TOR 03/0039Z OCT 69 EWM S E C R E T 0216352 OCT 69 CITE 25X1A IDEALIST LOGS SCOPE SAINT III ANNEX E TO OPORD 6-69- MATERIEL 1. A U-2R AIRCRAFT WILL BE DEPLOYED NON-STOP FROM sv cnr,nU1;D1L I HL CAPABILITY. 2. DEPLOYING SYSTEMS AND SENSORS: A. SYSTEM 17B B. SYSTEM 12 C. SYSTEM 13 D. SYSTEM 21 E. OSCAR SIERRA F. B-2 CAMERA G. T-35 TRACKER H. SPECIAL WEATHER PACKAGE 3. SUPPLY: DEPLOYMENT A. PHASE I POSTURE (ENROUTE/MISSION) SUPPORT KIT WITH MODIFICATIONS WILL BE DEPLOYED WITH SUFFICIENT SPARES IN 'X159 S L C R 8 T 25X1A 25X1A Approved For Release 2002/06/24: CIA-RDP99B00048R000100260009-1 AND EQUIPMENT TO SUSTAIN FERRY/MISSION OPERATIONS FOR ELEVEN (11) DAYS, B. SUPPORT KIT WILL INCLUDE THOSE ITEMS OF EQUIPMENT, FITTINGS AND ADAPTER KITS REQUIRED FOR COMMON UTILIZATION OF LOCAL I GROUND SUPPORT EQUIP- MENT AND ELECTRICAL POWER. C. FOLLOW ON SPARES WILL BE REQUISITIONED THROUGH WITH SIMULTANEOUS INFO MESSAGE TO ADDRESS FOR RESUPPLY VIA COMMERCIAL AIR IS: AMERICAN EMBASSY POL/L (CARGO NUMBER) D. 14 936 GALLONS OF TESTED TS FUEL (TEST DATE 17 AUG 69), BATCH 65A (6625 GAL), 70A (8311 GAL) IS SHIPMENT TO AND IS AVAILABLE FOR TRANS- VIA USAF C-130 AIRLIFT. 4. MAINTENANCE AND SUPPORTS A. SUITABLE HANGAR, MAINTENANCE AND STORAGE SPACE WILL BE PROVIDED BY THE DEPLOYMENT OF 115 /200V, 400 CYCLE, 3 PHASE, 15 KVA AND 110V, 6Q CYCLE, SINGLE 38199 S E C R E T 25X1A Approved For Release 2002/06/24: CIA-RDP99B00048R000100260009-1 Approved For Release 2002/06/24: CIA-RDP99B00048R000100260009-1 PAGE 3 rE C R E T 'ow PHASE, 30 AMP POWER SOURCE TO MEET HANGAR AND SHOP POWER REQUIREMENTS, ALONG WITH ADEQUATE POWER DISTRIBUTION CABLES WILL BE REQUIRED. 28 VOLT D.C., 200 AMPS, IS AVAILABLE IN HANGAR K-1, B. TRANSPORTATION REQUIREMENTS: REFUELER, FORKLIFT, TOWING VEHICLE, CARGO/PASSENGER VEHICLES WILL BE MET BY ASSETS. A 2t700 GALLON REFUELER WITH SINGLE POINT ADAPTERS WILL BE AVAILABLE FROM ASSETS. WILL PURGE REFUELER AND INSTALL NEW FILTERS. WILL PROVIDE REQUIRED "Y" ADAPTERS. C. PROJECT PERSONNEL WILL BE PERMITTED TO OPERATE VEHICLES AFTER THEY RECEIVE APPROPRIATE INSTRUCTIONS. 5. FOR USAF SUPPORT REQUIRED FOR SCOPE SAINT III IS AS FOLLOWS: A. USAF SUPPORT REQUESTED FOR FERYY FLIGHT TO 0 (1). REQUEST C-141 ARRIVE EDWARDS NORTH BASE NLT 240OZ 19 OCTOBER 69 WITH SENIOR HIGH CLEARED CREW AND MAXIMUM ALLOWABLE FUEL ON BOARD. WEIGHT AND CUBE OF EQUIPMENT AND SPARES TO BE DEPLOYED WILL BE IN 11) 117, 19D S E C R E T 25X1A -25X1A Approved For Release 2002/06/24: CIA-RDP99B00048R000100260009-1 25X1A 25X1A 25X1A 25X1A Approved For Rele* 2 1, 000 LBS AND 1700 CUBE. LARGEST ITEM APPROXIMATELY 530 LBS AND 303 CUBE DIMENSIONS 92 X 26 X 246. 'C-141 SHOULD BE EQUIPPED TO PROVIDE FOR MAXINUM OF 52 PERSONNEL AND PERSONAL LUGGAGE. PLANNED DEPARTURE FROM EDWARDS IS 19002 20 OCTOBER 69. PLANNED ARRIVAL JIS 100OZ 21 OCT 69. (2) REQUEST DIRECT COORDINATION BE AUTHORIZED BETWEEN _______IAN D ,1 AC SUPPORTING UNIT TO PROVIDE COMPLETION OF LAST MINUTE DETAILS. (3) C-141 TO BE RELEASED AFTER LANDING AND COMPLETION OF DOWN-LOADING AT C-141 (WITH SUFFICIENT FUEL TO PROCEED FROMI O NEXT DESTINATION, WITH ADEQUATE FUEL RESERVES. B. USAF SUPPORT REQUESTED WHILE DETACHMENT IS IN 25X1A PLACE 25X1A (1) USE OF MAIA AND MD-3 STARTING UNITS (PROBABLY FROM AT DURING PERIOD OF DEPLOYMENT. AN MA-2 UNIT IS PREFERRED IF AVAILABLE. IN 35199 S E C P E T j 25X1A 25X1A Approved For Release 2002/06/24: CIA-RDP99B00048R000100260009-1 Approved For Release 2002/06/24: CIA-RDP99B00048R000100260009-1 25X1A PAGE 5 (2) USAFE C-130 TO PICK UP AND DELIVER STARTING UNITS AND 2000 GAL JPTS (U-2 FUEL) FROM 25X1 25X1A WITH ARRIVAL AT NLT 100OZ 22 OCTOBER 69. (3) USAFE C-130 TO DELIVER 2000 GAL JPTS FUEL 25X1A (4) USAFE C-130 TO DELIVERY 2000 GAL JPTS FUEL FROM NLT 09,30Z 2-4 O CT 690 DIRECT COMMUNICATION WITH USAFE FOR USE OF C-130 SUPPORT IN THE EVENT OF RECOVERY OF THE U-2 AT AN ALTERNATE AIRFIELD IS REQUIRED. FURTHER, REQUEST C- 130' S PROGRAMMED FOR DELIVERY OF FUEL ON 22, 23, AND 24 OCTOBER 69 BE PERMITTED TO REMAIN AT 25X1A 0 0 UNTIL U-2 LANDS FROM FERRY/TRAINING MISSIONS TO ACT AS RECOVERY AIRCRAFT SHOULD UNSCHEDULED LANDING OF U-2 BE MADE AT ANOTHER BASE. IN, ,FF 19 S F: C R F T :25X1A 25X1A Approved For Release 2002/06/24: CIA-RDP99B00048R000100260009-1 (5) REQUEST DETACHMENT COMMANDER BE AUTHORIZED 25X1A - PAGE 6 25X1A NOT EARLIER THAN 090OZ 28 OCT 69. C. USAF SUPPORT REQUESTED FOR RETURN FERRY TO EDWARDS NO. BASE. (1) REQUEST C-141 ARRIVE 1700Z 27 OCT 69 WITH SENIOR HIGH CLEARED CREW AND MAXIMUM ALLOWABLE FUEL ON BOARD.. APPROXIMATELY 101,000 GALS, F-34 FUEL WILL BE AVAILABLE ATI FOR C-141 REFUELING, IF NECESSARY, FYI, MAIN RUNWAY AT 25X1A (6) USAFE C-130 TO ARRIVE J TO PICK UP RESIDUE JPTS FUEL AND STARTING UNITS AND RETURN TO 150 FT. WIDE WITH LCN 80 ON APPROACH ENDS OF RUNWAY AND LCN 70 FOR THE REMAINDER. (2) REQUEST C-141 DEPART APPROX 200OZ 28 OCTOBER 69. PLANNED ARRIVAL EDWARDS NO BASE IS 11OOZ 29 OCT 69. (3) IF CHANGE OF C-141 CREW NECESSARY AT EAST COAST ENROUTE STOP, REQUEST SENIOR HIGH REPLACEMENT CREW. MINIMUM GROUND TIME REQUESTED. FURTHER REQUEST DETACH. COMDR BE AUTHORIZED (IF REQUIRED) TO DIVERT C-141 INTO AIR3ASE WHERE U-2 HAS DIVERTED SHOULD THAT OCCUR. D. COVER PLAN TO BE PROVIDED BY SEP MSG. REQUEST 25X1A AND OTHER SUPPORT AS REQUIRED. END OF MSG I TN 3!11199 S F C RI r T 25X1A 25X1A 25X1A 25X1A 25X1A 25X1A Approved For Release 2002/06/24: CIA-RDP99B00048R000100260009-1 ASPHALT HARD SURFACE,