ELECTRIC POWER IN THE URAL REGION, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000200120038-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
33
Document Creation Date: 
December 28, 2016
Document Release Date: 
January 23, 2001
Sequence Number: 
38
Case Number: 
Publication Date: 
July 1, 1961
Content Type: 
IR
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000200120038-9.pdf1.23 MB
Body: 
Approved For Release 2002/01/14: CIA-RDP78TO5439A000200120038-9 Next 14 Page(s) In Document Exempt Approved For Release 2002/01/14: CIA-RDP78TO5439A000200120038-9 ELECTRIC POWER IN THE OF P L F IOIV, USSR JAXXIxtRW PIC/JR-7/61 July 1961 NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Declass Review by NI.MA/DO NOFORN TOP SECRET CHESS RUFF NOFORN PIC/JR-7/61 This joint photographic intelligence report is in answer to a request for basic information on electric power serving the Ural region of the USSR and for information on the status and alignment of two power lines believed to be under construction between Asbest and either Verkh-Ney- vinsk or. Kamensk. The request also asked for a study.of the area between Sverdlovsk and Verkhniy-Ufaley for significant new industries which might account for the large power capacity in this area. KEYHOLE photography of was examined with TALENT photography of in the preparation of the report. In addition, collateral information was used to provide as complete an overall analysis as possible of the availability of electric power to the Ural region. TOP SECRET CHESS RUFF NOFORN FIGURE 1. GENERAL MAP OF URAL AREA. NF Outlined portion is oreo of interest. - 4 TOP SECRET CHESS RUFF NOFORN PIC/JR-7/61 TOP SECRET CHESS RUFF NOFORN PIC/JR-7/61 Much of the Ural region covered by KEYHOLE photography is blank- eted by heavy overcast or obscured by broken-or scattered clouds, haze, and drifting snow. The area between Nizhnyaya Tura and Verkh-Neyvinsk is completely cloud covered. Between Sverdlovsk and Chelyabinsk, visi- bility is limited. to a few openings in heavy clouds. These areas are also obscured by haze or drifting snow. Asbest, Kamensk, Kyshtym, Beloyar- skaya Atomoelektrostantsiya (nuclear power plant), the northern unit of and Chelyabinsk, are all obscured by heavy overcast. West of a line running from Verkh-Neyvinsk to Sverdlovsk to Zlatoust, KEYHOLE photography provides considerable data which supplement the analyses from earlier TALENT coverage. The limitations caused by cloud coverage in TALENT photography over the Ural region -are delin- eated in ACSI-PIR-41-59, Military Aspects of the Urals Area. 1/ GENERAL DISCUSSION The study of the photography and the collateral material of the elec- tric power in the Ural area reveals that an estimated 6,500 megawatts (MW) of power capacity was available in the area in exclusive of the power transmitted over the 400(500)-kv power line from Volzhskaya GES, near Kuybyshev. An estimated 3,500 to 4,000 MW was either planned -or in construction at that time. KEYHOLE photography provides coverage, additional to TALENT photography, of power lines and electric-power installations serving the Ural region (see Figure 2). Of these, the power networks around the Pervoural'sk - Revda area, and Zlatoust (see Figure 3), and'the Pavlov- skaya GES, a hydroelectric power plant on the Ufa river at Pavlovka,- are significant. TOP SECRET CHESS' RUFF NOFORN . Approved For Release 2002/01/14: CIA-RDP78TO5439A000200120038-9 KRASNOTURINSK P KIZEL k.0 ,. 11-~-13 "27 LYS'VA G hI NIZHNIY TAGIL 1A20 IA 2 I I A 2 40ABAG1ARYAK FIGURE 2. ORAL AREA POWER LINES AND ELECTRIC POWER INSTALLATIONS. The letters and numbers designating power plants and substations key this drawing to Tables I and 2. TOP SECRET CHESS RUFF NOFORN PIC/JR-7/61 Analysis and plotting of identifiable power-line circuits also suggest areas for further study which are cloud covered on either KEYHOLE or TALENT photography or on both. One of these is in the vicinity of Arti. A second is around Bagaryak, which is barely visible in a hole in the cloud deck. A third is the' Kyshtym area. KEYHOLE discloses the probable electrification of the visible eastern portion of the Sverdlovsk-Perm' railroad. A 400(500)-kv power line seen under preliminary construction for a short distance out of Yuzhnaya substation on TALENT is revealed on KEYHOLE as being apparently extended in a southwesterly alignment. The observed trace is probably intended for the 5?0-kv power line re- ported under cons; ruction between een Votkinskaya GETS, under construction on the Kama river, and Sverdlovsk. KEYHOLE photography does not disclose any visible evidence in cloud-free areas of the two power lines reported to be under construction between Asbest and either Verkh-Neyvinsk or Kamensk. 5/ A positive analysis of power lines, faintly visible south of the conjectural site of Beloyarskaya AES (see Figure 2, item X) is prevented by cloud and haze conditions. One of these might be tied to Kamensk and be a section of one of the reported power lines. The -search . for significant new industries which might account for the large amount of power in the area proved fruitless. No significant indus- try was disclosed on the KEYHOLE photography in the cloud-free areas between Sverdlovsk and Verkhniy-Ufaley. ELECTRIC POWER INSTALLATIONS An estimated 6,500 MW of power capacity was available in in the Urals area, exclusive of power transmitted over the 400(500)- kv power line from Volzhskaya GES, near Kuybyshev. An estimated 3,500 'TOP ' SECRET CHESS RUFF NOFORN TOP SECRET CHESS RUFF NOFORN PIC/JR-7/61 to 4,000 MW additional was either planned or under construction. About 400 MW additional installed capacity could be made available to the area from the Votkinskaya GES when both power plant and the tying power line to Sverdlovsk are in service. Significant installations of the Ural power grid which are disclosed by KEYHOLE materials and briefly discussed below are cross-referenced to the power plants and substations illustrated in Figure 2 and listed in Tables 1 and 2. Three urban areas in the Ural region can be considered both electric- power generating and electric-power using centers. Power-line networks within these areas are too complicated to trace on the map of the Ural power grid (Figure 2). Of the three, Sverdlovsk has KEYHOLE-TALENT coverage; Chelyabinsk only partial. TALENT coverage; and Ufa neither KEYHOLE nor TALENT. Sverdlovsk Power Center The Sverdlovsk urban area (see Figure 3) contains three thermal power plants having generating capacities reported at 75, 25, and 24 MW (124 MW total). 1/ All three are tied to the Ural 110-kv power grid,. which is also served by an important substation in the center of the built- up area of Sverdlovsk. KEYHOLE photography, which is partially cloud covered, does not disclose any changes in the local power-line network. Chelyabinsk Power Center The Chelyabinsk urban area contains two thermal power plants, each reported to have a generating capacity of 150 MW (300 MW total). I/ Power lines in the urban area can only be partially identified and plotted from TALENT photography covering Chelyabinsk. TOP SECRET CHESS RUFF NOFORN Collateral information reports five thermal power plants with a corn- bined generating capacity of 288 MW located in Ufa. TOP SECRET CHESS RUFF PIC/JR-7/61 KEYHOLE photography discloses only one significant additional power plant and no observable changes to power plants disclosed by TALENT in the Ural region between Verkh-Neyvinsk and Chelyabinsk. 1/ The only significant additional power plant disclosed serving the Ural grid is Pav- lovskaya GES on the Ufa river (item MM, Table 1). Table 1 locates and describes the power plants on the Ural grid, and estimates their capacity. . KEYHOLE photography discloses a number of substations not iden- tified on TALENT material because of atmospheric conditions. Some of these have considerable significance, including two at Zlatoust (see. Fig- ures 2 and 4 and Table 2). A published USSR report states that Nizhne Tagil'skaya Substation was "completed" and placed in service as of December 1960, adding that it was one of the largest in the country. Power was being received from Volzhskaya GES near Kuybyshev, the report states. KEYHOLE photog- raphy does not disclose any new 220-kv 'or 400(500)-kv power lines or traces tying into the area of Nizhne Tagil' from any observable 220-kv or 400(500)-kv power lines in cloud-free. areas. There may be a tie power line off the two 1-circuit. 220-kv power lines from Verkh-Neyvinsk to Nizhnyaya Tura disclosed in TALENT, which pass west of the substation (item 15 on Table. 2> in Nizhne Tagil'. Haze prevents detailed analysis of equipment in the substation's enclosed area. Details of the substations are given in the list comprising Table 2. A number of power-line traces are seen on KEY-HOLE photography. Some of them extend the alignments of those visible on -TALENT. TOP SECRET CHESS RUFF NOFO.RN TOP SECRET -CHESS RUFF NOFORN PIC/JR-7/61 VOLZHSKAYA GES CHELYABINSK N R. K U Y B Y S H E V AND S V E R D L O V S K 7 CI RCUI 3 PHASE SWITCHE C 400 A(500) JJ I CIRCUIT (500) C S _ HASE [430P0 RV A C \\\ f . . ~ . . . . 400 (500)/110 KV ALIT OTR FO ER BUSSES 1IO KV VAR BL WITH VAR IABLE VOLTAGE CONTROL KYSHTYM SWITCH 110 KV (NUMBER OF I \ 110 KV CIRCUITS KUSA 17 6 KV - \ - GROUNDING NOT GIVEN) / REACTORS \ GROUNDS = _ FROM: - \ CIRCUIT BREAKERS ELEKTRICHESKIYE TA.TSIt AUGUST NOT SHOWN 1960. P. 51 (U) CIRCUIT 46 (FIG. 2) J MI ASS f l // / YUZHNO UR AL?SKAY A GRES Be 70? CHELYABINSK Z L ATO UST 10 K~~ O 47 SEROYAUSH ~~= y ~~ \ O 00 - 17 V 31 O U FA KJ ` p 01 . l , 47 (FIG. 2) UFA I _.. C H E L Y A B MA C NIT ODORS K ELECTRIFIED RAIL LINE NPIC G-4511 59? 40? FIGURE 4. POWER LINES IN VICINITY OF ZLATOUSTINSKAYA, Zlatoustinskaya substation. TOP SECREaFORHESS RUFF TOP SECRET CHESS RUFF NOFORN PIC/JR-7/61 Power Lines Serving Arti Area Two probable 110-kv power line traces, not discernible on TALENT material, can be seen entering a cloud-covered area southwest of Arti and south of the northernmost bend of the Ufa river. One trace originates at the substation in Mikhaylovskiy (No 34, Figure 2); the second originates at the substation in Nyazepetrovsk (39). Limited co'lateral suggests that a chemical industry may be located in or near Arti. However, the visible evidence that two 110-kv power lines serve this cloud-covered area sug- gests that power may be used for some purpose not disclosed in available source material, especially since available mapping provides no.indication of any industry or other installation necessitating such a power supply. The clear KEYHOLE photography of the perimeter of this cloud-covered area does not disclose any other traces which might. be for power lines. . Two power lines can be traced on KEYHOLE photography leaving the site of Pavlovskaya GES (item MM, Table 1) in the direction of Ufa until they disappear under a heavy cloud cover. They are estimated to be for two, 3-phase, 110-kv power lines of either one or two circuits each. Since Pavlovskaya GES is reported completed, it is estimated that at least one power line is in service. These power lines are not believed to carry 220 kv, since available USSR circuit diagrams.of 220-kv and higher volt- ages for the national grid do not indicate any plans for 220-kv circuits to be tied into this power plant. Power Lines Serving Bagaryak Possible power lines tied to a possible substation (Item 40, Table 2) in the northern section of Bagaryak (56-1.3N 61-30E) are seen on KEY- HOLE photography (see Figure 5). Considerable activity is indicated by the many tangental traces radiating from this small community. _ Limited TOP SECRET CHESS- RUFF NOFORN collateral information indicates the production of graphite in the vicinity of Bagaryak. Clouds and haze, however, prevent analysis. There are indications that a large structure is situated south of the possible sub- station site. TOP SECRET ? CHESS RUFF PIC/JR-7/61 Railroad Electrification Several substations serving electrified sections of railroads in the Ural region additional to those identified from TALENT are now.identified on KEYHOLE. These railroads include the north-south line generally paralleling the eastern flank of the Ural range and the east-west line be- tween Chelyabinsk and Ufa (Figure 2). :Also, there are visible indications that electrification is under way or possibly completed on the eastern cloud-free portions of the Sverdlovsk-Perm' line as far west of Sverd- lovsk as Kuzino (57-01N 59-27E,). Item A B D TABLE 1. POWER PLANTS ON URAL GRID (These power' plants are keyed to Figure 2.) Source: T = TALENT; K = KEYHOLE; Co = Collateral. rep - reported; est - estimated Name, Description, and Location Capacity (MW) Source Krasnoturinskaya TETS. Thermal power plant in. Bogoslovsk (on far oblique). 325 (rep) T, Co 59-46N 60-13E * Serovskaya GRES. Thermal power plant (on far oblique, mostly obscured by 400 (rep) T, Co clouds). 59-37N 60-47E * Thermal power plant in Novaya Iyalya. 12-13 (est) T 59-03N 60-39E * Thermal power plant in Korelino. 11 (est) T 58-43N 60-23E * P iC/ JR- 7 /61 Item Name, Description, and Location Capacity Source (MW ) E Nizhnvava Turinskava GRES. important 550 (est) T, Co thern?a1 power plant in north Ura1_ re intl. Switching yard also r_:evves as switching substation for north Ural 220-kv power lines, Power plant a1_so ewes: _Niz.hnvava Tura. AE installa- tion. i_/ 53-37N 5?-51_ F F Nizhniy Tagil's:l aya TETS. Thermal pow- '7 (rep) T, Co er plant in Novo Tagil attached to Kaganovich' Railroad and Car and Tani Plant, Probably tied into 110- kv power lines. 57-50N 60-04E G Nizhniy Tagil_'skava TETS- 1 Thermal 100 (rep) T, Co power plant probabiy tied to 1;10-1_:v power lines. (partial_l_y obscured by clouds) 57-5LIIN 60-02E H Nizhniv l agil'sk_ava TETS. Kuybyshev. 1.5 (est) T, Co Small thermal_ power plant serving Nizhniy Tagil. Probably tied to 110- kv power lines. (haze) 57-541N_50-57E Srti all thermal power plant in Kirovgrad. under T. Co Tied to 11_0-kv power line: through, 25 (rep) adjacent substation (not.llisted in List of Sub.,,-tat-ions). 57-25N 60-04E J Verkhne-Tagil's.kaya GRES. Significant 800 plus: --F Co thermal powc-r plant principally ser- 200 u/c wing Vurkh--Nevvinsk GaL:eo u s.Diffu- sion P1ant. Ticd to 110-kv power lines. 57-21N 5U-57E TOP SECRET CHESS RUFF NOFORN PIC/JR-7/61 Item Name, Description, and Location Capacity Source (MW) K SUGRES. Important thermal power plant in Sredne-Ural 'sk, serving Sverdlovsk and Verkh-Neyvinsk plant through -110-kv power lines. No change in-. dicated on KEYHOLE coverage. 57-OON 60-29E Sverdlovsk Power Center power plants, (see text). (56-50N 60-23E) L Solikamskaya TETS, small thermal power plant attached to cellulose plant in Borovsk. Tied to 110-kv power lines. 59-41N 56-40E Beieznikovskaya TETS. Thermal power plant in Berezniki. Tied to 110-kv power lines.** 59-24N 56-44E * N Bereznikovskaya TETS, BMZ. Thermal power plant in Berezniki. Tied to 110-kv power lines. ** -~59-24N 56-44E * O Yayvinskaya GRES. Important thermal power plant reported under construc- tion. ** 59-18N 57-18E (Yava) P Thermal power plant in Kizel. Tied to 110-kv power lines. ** 59-03N 57-36E * Q Kizelskaya GRES-1. Thermal power plant in Gubakha tied to 110-kv power lines. 1958 Seven Year Plan indi- cates planned construction of 220-kv power line from Chusovoy to Guba- kha. ** 58-52N 57-33E TOP SECRET CHESS RUFF NOFORN 234 (est) K, T Co 124 (total) 24 (rep) K, T Co 105 (rep) Co 100 (rep) Co 300 to Co 600 u/c (1959) 60-(rep) Co 98 (rep) Co (1958) TOP - SECRET CHESS RUFF .NOFORN' PIC/JR-7/61 Item Name, Description, and Location Capacity Source (MW) R Shirokhovskaya GES. Small hydroelec- 28 (rep) Co tric power plant on Kos'va River. Tied to 110-kv power lines. 58-50N 57-33E * KamGES. First major hydroelectric pow- 504 (rep) Co er plant completed on Kama River. Tied to 110-kv power. lines and to Yuzhnaya Substation, Sverdlovsk, by two 1-circuit 220-kv power lines in -parallel traces. ** 58-08N 56-20E T Permskaya TETS ACP. Reported tied to n. a. Co 110-kv power lines. ** 57-59N 56-14E U Permskaya GRES-2. Reported tied to 6.5 (rep) Co 110 k l ** - v power ines. 60-011N,50-10E V Krasnokamskaya. TETS, Zakam. Impor- 150 (rep) tant thermal power plant serving Krasnokamsk and Perm' area. Tied to 110-kv power lines. ** 58-05N 55-40E W Votkinskaya GES. Second major hydro- 1, 000 u/c Co electric power plant under construc- (1961) tion on Kama River. Planned to be tied to Yuzhnaya Substation, Sverd- lovsk, by 1-circuit,' 500-kv power line. 56-46N 54-OOE * Beloyarskaya AES. Significant nuclear 200 u/c Co power plant under construction. To plus 200 (1961) be tied to Sverdlovsk and Chelya- planned binsk power centers by I- circuit 220- kv powerlines: *** 56-51N 61-23E - 18 - TOP SECRET CHESS RUFF ,NOFORN TOP SECRET CHESS 'RUFF PIC/JR-7/61 Item Name, Description, and Location Capacity Source (MW) Y Small thermal power plant- in Asbest. under 25 Co Probably tied to 110-kvepower lines. - (1959) *** 57-011N 61-30E* YeGRES. Thermal power plant in Yegor- 46 (rep) Co shino, north of Artemovsk. Probably (1959) tied to 110-kv power lines. 57-22ND 61-52E AA Kamensk-Ural'skaya TETS. Significant 400 (rep) Co thermal power plant tied to 220-kv and 110-kv power lines. Probably- provi,les the area around Bagaryak with power through 110-kv power line. *** 56-21N 61-59E BB Argayashskaya TETS. Important thermal 300 (rep) Co power plant tied to 220-kv and 110- kv power lines.*** 55-28N 60-53E * For Chelyabinsk Power Center power 300 (total) T, Co plants, see text. 55-ION 61-24E CC Yuzhno-Ural'skaya GRES. Thermal power 600 (1959) Co plant in south Ural area. Tied to plus 400 220-kv and 110-kv power lines; also u/c (rep) by a 2-circuit 154-kv power line to Zlatoust. A future 1-circuit 500-kv power line reported transmitting 2~0 kv. 54-53N 61-18E * - DD Troitskaya GRES. * * * * Significant ther- 1,300 u/c Co mal power plant reported under con- struction to serve 500-kv and 220-kv power lines.*** 54-03N 61-34E * TOP SECRET CHESS RUFF NOFORN TOP SECRET CHESS RUFF PIC/JR-7/61 Item Name, Description, and Location Capacity Source (MW) EE Rudnaya TETS. Thermal power plant re- 100 u/c Co ported under construction and to be tied to south Ural power lines through large substation (67). Whether this, power plant will be completed is questioned in some collateral. FF Magnitogorskaya TETS. Thermal-power 273 (rep) T, Co plant attached to Magnitogorsk Me_-~- tallurgical Combine. Tied probably to 110-kv and possibly to 220-kv power lines through 35-kv power lines and substation in north Magnitogorsk (64). 53-26N 59-02E GG Magnitogorskaya TETS. Thermal power 100 (rep) T, Co plant attached to Magnitogorsk Me- tallurgical Combine. Tied to TETS, item FF, by 35-kv power lines and to substation, item 64. 53-23N 59-02E HH Sterlitamakskaya TETS, New. Thermal 50 (rep) Co power plant tied to Ural area through (1959) 110-kv power line. to Ufa power cen- ter. 53-37N 55-58E II Small thermal power plant at Ishimbay. under 25 Co Probably tied to Sterlitamakskaya TETS (HH) through 110-kv power line. 53-28N 56-02E * JJ Salavatskaya-TETS. Thermal powerplant 150 (rep) Co tied to Ural area by 110-kv power (1959) line to Ufa power center. 53-21N 55-55E TOP SECRET CHESS RUFF NOFORN TOP SECRET CHESS RUFF NOFORN PIC/JR-7/61 Item Name, Description, and Location KK Zlatoustovskaya TETS. Small thermal power plant, possibly tied to 110-kV power lines (haze). 55-12N 59-40E Capacity Source (MW) 25 (rep) K, Co LL Small thermal power plant in Asha. Pos- 4 (est) K sibly tied to 110-kv power lines (haze). MM Pavlovskaya GES. Hydroelectric power 170 (rep) K, Co plant on Ufa River. Tied to Ufa pow- er center by two probably 110-kv power lines. 55-24N 56-34E Ufa power plants, see text. 54-44N 55-57E Approximate geographic coordinates (plus or minus 2 minutes). Cloud covered on TALENT. Cloud covered on Nla"IIOLE. Cloud covered on and I:EYIIOLE. - 288 (total) TOP SECRET CHESS RUFF NOFORN TOP SECRET CHESS RUFF NOFORN TABLE 2. SUBSTATIONS ON URAL GRID (Items refer to. numbers . on Figure 2.) PIC/JR-7/61 Known Location and Voltage Item qoordinates Description (kv)- Severoural'sk Transformer substation. 220 60-07N 59-50t* Terminus of 1-circuit 220-kv power line from Nizhnyaya Tura ( (far oblique). Transformer substation 220 59-37N 60-47E* on Nizhnyaya Tura to Severoural''sk 220-kv power line. Karelino 58-43N 60-23E* Is 58-48N 59-43E Transformer-rectifier 110 substation, serving elec- trified railroad (454-b; 7/). Transformer-rectifier sub- 110 station, serving electrified railroad (454-b; 7/). Transformer-rectifier sub- 110 station, serving electrified railroad (454-b; 7/). Transformer-rectifier sub- 110 station, serving electrified railroad (454-b; 7/). Transformer and switching 110 substation, serving atomic energy complex. Transformer substation. '110 Transformer substation, 110 serving atomic energy complex. TOP SECRET CHESS RUFF NOFORN TOP SECRET CHESS RUFF NOFORN 10 Promyskla 58-34N 59-10E 11 Stantsiya Yevropeyskaya 58-27N 59-16E 14 Kushva 58-17N 59-47E 18 Levikha 57-38N 59-55E Description PIC/JR-7/61 Transformer substation. 110 Transformer-rectifier sub- 110 station serving Perm' - Kushva electrified railroad (452-a; 7/). Transformer-rectifier 110 substation serving Sverdlovsk to Nizhnyaya Tura electrified railroad (454-a; 7/). Transformer and switching 110 substation; probably feeds 35 35-kv power to Sverdlovsk - Nizhnyaya Tura electri- fied railroad (454-b; 7/). Probable transformer sub- 110 station (haze and far oblique). Large transformer substa- 110 tion; ties Nizhniy Tagil industrial complex to Ural 110-kv power lines. No visible tie to 220-kv Verkh- Neyvinsk - Nizhnyaya Tura power lines (haze). Transformer substation. ** 110 Transformer and switching 110 substation; probably feeds 35 35-kv power to.Sverdlovsk - Nizhniy Tagil electrified railroad (454-a; 7/). TOP SECRET CHESS RUFF NOFORN TOP SECRET CHESS RUFF NOFORN 20 Stantsiya Transformer-rectifier sub-- 35 T Byn'govskiy station, serving Sverdlovsk 57-35N 60-06E - Nizhniy Tagil electrified Orailroad (454-a; 7/). 21 TsemEmtnyy Transformer substation, 35 T 57-25N 60-10E serving cement plant. 22 Neyvo-Rudyanka Transformer and switching 110 T 57-21N.60-10E substation, with possible rectifier equipment to serve Sverdlovsk - Nizhniy Tagil electrified railroad (454-a; 7/). equipment for Sverdlovsk to Nizhniy Tagil- electri- fied railroad (454-a; 7/). Transformer substation. 110 Co PIC/JR-7/61 Known o V lt (1945) Planned significant switch- 220 Co ing and probably trans- (1958) former substation to (serve planned 220-kv power lines for north Ural region TOP SECRET CHESS RUFF NOFORN Sevthbi en sustaton serves local industry, being fed 35-kv power. Transformer substation, 110 K dge Item Coordinates Description (kv) Source 19 Karpushika Possible transformer sub- 110 T 57-30N 59-55E station; may possibly con- tain rectifiers to feed dc power to electrified rail- road. 23 V erkh-Neyvinsk seven substations- Six 220 K C - , 116 Location and N uu06E tfih -ransormer, swtcing, 110 T 25X1 and rectifier substations 35 Co 25X1 TOP SECRET CHESS RUFF PIC/JR-7/61 Known Voltage Item Coordinates Description . (k;v) - Source 27 Chusovoy Transformer and switching 110 Co 58-21N 57-49E * substation. tied to 110-kv (1945) power lines in north Ural area. 28 Bizert' Transformer substation. 56-52N 59-04E Revda 60-48N 59-56E Pervoural'sk 56-56N 59-54E 110 K,T Transformer substation. * * 110 Possible transformer and 110 principal switching sub- station for 110-kv power lines west of Sverdlovsk in central Ural region. . T, Co 31 Bilimbay Possible transformer-rec- 110 K 56-57N 59-47E tifier substation, serving Co electrified section of (1958) Pervoural'sk - Kuzino rail- road; may be in process of electrification. Power line trace continues toward Kuzino (410-zh; 7/). 32 Sverdlovsk Yuzhnaya substation. Prin- 400 K 56-44N 60-36E cipal transformer and (500) T switching substation for 220 Co Sverdlovsk and central 110 and north Ural areas. Terminus of 400 (500)-kv power ne from Volzhskaya GES (near Kuybyshev) through Bugul'- ma, Ufa, Zlatoust, and Chelyabinsk, and of two 1-circuit, 220-kv power lines from KamGES (S). TOP SECRET .CHESS RUFF NOFORN TOP SECRET CHESS RUFF NOFORN PIC/JR-7/61 Location and Known Item Coordinates Voltage Description (kv) Source 33 Stantsiya Transformer substation 110 T Kosulino with possible rectifier (Dubrovinskiy) equipment for serving 56-45N 61-02E Sverdlovsk - Tyumen elec- trified railroad (410-z; 7/). 34 Mikhaylovskiy Transformer substation tied 110 K,. T 56-27N 59-08E to 110-kv power lines. KEYHOLE discloses new trace in direction of Arti area. 35 Degyarka Transformer substation 56-43N 60-02E. . 36 Polevsk'oy Transformer and switching 56-29N 60-15E substation tied to 110-kv power lines southwest of Sverdlovsk. 110 K, Co 110 T, Co 37 Stantsiya Probable transformer- 110 K Poldnevaya rectifier substation serving 56-18N 60-17E Sverdlovsk - Chelyabinsk electrified railroad (462-g; 7/). 38 Verkhniy Ufaley Major transformer and 110 56-03N 60-13E switching substation tied to 110-kv power lines be- tweeiA Sverdlovsk and Che- lyabinsk; possibly has rectifier equipment serving Sverdlovsk - Chelyabinsk electrified railroad (462-g; 7/). 39 Nyazepetrovsk Transformer substation tied 110 56-02N 60-17E to 110-kv power lines. KEYHOLE discloses a new power line trace in direction of Arti area. TOP SECRET CHESS RUFF NOFORN TOP SECRET CHESS RUFF NOFORN 00 PIC/JR-7/61 00 00 00 40 Bagaryak 56-13N 61-30E 41 Kyshtym 55-42N 60-33E * 42 Kas-li 55-53N 60-32E 43 Vermikulit 55-59N0-40E * 44 Stantsiya Shagol, ' 7 miles NW of switching substation in 220 (1958) Chelyabinsk south Ural region on Kuy- 110 / 55-14N 61-17E byshev to Sverdlovsk '400 00 (500)-kv power line; tied 0 also to 220-kv and 110-kv 0 power lines. Only partially i in service (TALENT), some switching equipment and - 0 transformers not yet in- stalled (surrounded by clouds in TALENT). 45 Karabash Transformer substation tied 110 T, Co 55-29N 60-13.E * to 110-kv power lines (haze- on TALENT). *** TOP SECRET CHESS. RUFF NOFORN Possible transformer sub- 110 K 00 station tied to Kamensk (poss) 00 and to Sverdlovsk by pos- 04 sibly 110-kv power lines. 00 00 Important switching and 110 Co / probably transformer sub- (1958) 00 station tied.to 110-kv power 000 0 lines between'Sverdlovsk 00 and Chelyabinsk. * * * * 00 00 00 Transformer and switching 110 - T, Co substation of possible sig- 0 nificance to atomic energy i installations in the Kyshtym 00 area; tied to 110-kv power 00 00 lines. s Transformer substation; ter- 110 T, Co 00 minus of 110-kv power line 35 00 from Kasli; serves Sungul' 00 Institute through probable / 00 35-kv power line. 00 s Chelyabinskaya substation. 400 T- 00 00 Principal transformer and (500) Co 04 Known 00 Voltage Description (kv) Source 10 00 .01 48 49 50 51 PIC/.; R-7/61 Location and Coordinates -Description Known Voltage (kv) Source Zlatoust Major transformer and 154 K (North of switching substation'on 110 Co urban area) ' 110-kv power lines west (1945) 55-10N 59-42E of Chelyabinsk and tied to Yuzhno-Ural'skaya GRES (CC) by 2-circuit 154-kv power line; probably tied to (1948) Zlatoustinskaya Substation (47). * * Zlatoust Zlatoustovskaya Substation. 400 K (South of Principal switching and (500) Co urban area) transformer, substation 110 (1958) 55-09N 59-40E serving Zlatoust area on Kuybyshev to Sverdlovsk 1-circuit 400 (500)-kv power line. ** Kusa Transformer substatio 11 55-17N 59-37E n. Terminus of probable 110-kv (possibly 35-kv) power line from Zlatoust 0 T, K (haze on KEYHOLE). Stantsiya Tundush Transformer-rectifier substation servi Uf 110 K 55-11N 59-24E ng a - Zlatoust electrified rail- road (435-zh; 7/) . Near Stantsiya Zhukatau on Berdyaush to Transformer-rectifier substation serving Ufa to electrified railroad 110 K Druzhino rail- road (452-b; 7/) (435-zh; 7/). 55-09N 59-12E- Satka Transformer sub t ti 58 * s a on tied 110 T -02N 59-03E to 110-kv power lines west Co of Chelyabinsk. * * * (cloud 19 5 covered on KEYHOLE') ( ) 4 TOP SECRET CHESS RUFF NOFORN TOP SECRET CHESS RUFF TOP 'SECRET CHESS RUFF NOFORN Location and Item Coordinates Transforriier- rectifier 110 substation, serving Ufa - 53 Asha 55-00N 57-15E Zlatoust electrified rail- road (435-zh; 7/). 110 Description .PIC/JR-7/61 Known Voltage (kv) Source Transformer-rectifier i' substation serving Ufa - Zlatoust electrified rail- road (435-zh; 7/). Tavtimanovo Possible transformer- 54-54N 55-40E rectifier substation serving Ufa - Zlatoust electrified railroad (435-zh; 7/). 55 / Ufa Planned principal transform- 400 - Co ij. er and switching trans- (500) (1958) former substation on Kuy- byshev to Sverdlovsk 1-circuit 400 (500)-kv power line. Status-not available; may be under construction, partially or completely in service. 56 Buzul'ma Principal transformer and 400 54-29N 52-45E switching substation on (ODU) Kuybyshev - Sverdlovsk 220 1-circuit 400 (500)-kv power line, Bugul' ma oil field. 57 Miass 54-59N 60-07E * Transformer substation 110 tied to 110-kv power lines west of Chelyabinsk. **** Transformer substation. 110 Transformer substation, 110 terminus of 110-kv 1-circuit power line from Magnitogorsk- (see item 64). Co (1945) Co (1945) Co (1945) TOP SECRET CHESS RUFF TOP SECRET CHESS RUFF NOFORN PIC/JR-7/61 Location and Item Coordinates 60 Kustanay 53-16N 63-36E 61 Rudnyy (Sarbay area) 62 Lisakovka (near Raz"yezd Lisakovka) 52-32N 61-16E 63 Dzhetygara 52-13N 61-13E 64 65 terminus of Sarbay- Lisakovka-Dzhetygara power line. Construction may have begun. Magnitogorsk Principal transformer and 53-28N 59-03E switching substation in Magnitogorsk tied to 110- kv power lines in south Ural region. (No evidence of any 220-kv equipment on TALENT). Davlekanovo Transformer substation tied 54-12N 55-04E to 110-kv power lines south of Ufa. May have rectifier equipment for Kinel' -Ufa electrified railroad (435-e; 7/). TOP SECRET CHESS RUFF NOFORN Known Description Voltage (kv) Significant transformer sub- (500) station believed to be re- 220 ceiving 220-kv power from Troitsk over future 500-kv power line. Source Co (1958) Large transformer and (500) Co probable switching sub- 220 (1960) station, believed to be 110 receiving 220-kv power from Troitsk over 1-circuit future 500-kv _ power line. Reported transformer sub'- 220 Co station on Sarbay-Dzhety- (1960) gara 220-kv power line. Construction may have begun. Reported planned trans- 220 Co former substation to be (1960 ) TOP SECRET CHESS RUFF NOFORN PIC/JR-7/61 Known Location and Voltage Item Coordinates Description (kv) Source 66 Belebey Same as 65. 110 Co 54-13N 54-07E (1959) 54-06N 54-07E *: (1959) Approximate geographic coordinates (plus or minus 2 minutes). Cloud covered on TALENT. Cloud covered on KEYIIOLF.. Cloud covered on TALENT and KEYHOLE. MAPS AND CHARTS The latest editions of the AMS maps Series N501 and N502 and Air pilotage charts covering this area were used in this report. In addition to Sheet No 41 of AMS series 1301, WACs 156, 164, and 165, and USAF Jet Navigation Charts, Sheet JN-11 were also used. The highest classifi- cation on these maps is CONFIDENTIAL. TOP SECRET CHESS -RUFF TOP SECRET CHESS RUFF NOFORN PIC/JR-7/61 1. Army, ACSI. PIR-41-S Military Aspects of the Urals Area, F. Summary of Mission 4125, Nov 59, passim. (TSC) 2. CIA. SI 51-59, Availability of Electric Power to Soviet Atomic En- er Installations in the Urals, 4 Jun 59 (S/Noforn 4. CIA. NIS 26, USSR, Chapter. VI, Section 62 D, ''Electric Power,'' data of Jan 59, ;Figures 62-141 and 62-154 (S/Noforn) 5. CIA. OSI-SD/60-15, Scientific Intelligence, 8 Aug 60 (S) 6. Morozova, A. A. Prof, ed. Turbinnoye Oborudovaniye Gidroelektro- stantsiy; Moscow, 58, pp 338-354, item 22, and p 411 (U) 7. OFITSIAL'HYY UKAZATEL' PASSAZHIRSKIKH SOOBSHCHENIY, LE- TO 1957 FODA (1957 Summer Passenger Timetable) Moscow 57 (U) In addition, collateral data covering electrical developments during the current USSR seven-year plan, 1958-1965, including schematic circuit diagrams of power lines of 220 kv or higher voltages, from the files of USSR newspapers and magazines were studied. TOP SECRET CHESS RUFF NOFORN 25X1 TOP SECRET CHESS RUFF Copy No. August 1961 NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER In Figure 2 (on page 6), the power line shown east of Beloyarsk as 11400(5 00) KV" should be corrected. to read "planned 220 KV. NOFMN 10 TOP SECRET CHESS RUFF