KIYEV PROBABLE LONG RANGE SAM LAUNCH COMPLEX USSR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T04759A007300010003-4
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
4
Document Creation Date:
December 28, 2016
Document Release Date:
November 7, 2001
Sequence Number:
3
Case Number:
Publication Date:
August 1, 1967
Content Type:
BRIEF
File:
Attachment | Size |
---|---|
![]() | 265.78 KB |
Body:
App ffe4SJRji[ase 2002/01/02 : CIA-RDP78TO4759AO07300010003-4
;,
PHOTOGRAPHIC INTERPRETATION ? REPORT
KIYEV
PROBABLE LONG RANGE
SAM LAUNCH COMPLEX
USSR
Declass Review by N I MA/DOD
T CS-80503/67
AUGUST 1967
COPY 116
2 PAGES
GROUP I EXCLUDED FROM
AUTOMATIC DOWNGRADING
AND DECLASSIFICATION
Approved For R as$g0011# /02 : CIA-RDP78TO4759AO01300010003-4
Approved For Release 2002/01/02 : CIA-RDP78T04759A007300010003-4
This document contains information affecting the national security of the United States within the meaning
of the espionage laws U. S. Code Title 18, Sections 793 and 794. The low prohibits its transmission or
the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner
prejudicial to the safety or interest of the United States or for the benefit of any foreign government to the
detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized
to receive Information in the designated control channels. Its security must be maintained in accordance
with regulations pertaining toTALENT-KEYHOLE Control System.
Approved For Release 2002/01/02 : CIA-RDP78T04759A007300010003-4
Handle viaApproved For Release 200 ~Q,/O EfnP7ff04759A007300010003-4
Talent-KEYHOLE d F( TCS-80503/67
Control System Only August 1967
Kiyev Probable Long Range SAM Launch Complex
25X1 D
USSR 50-14N 030-05E
Kiyev Probable Long Range SAM Launch Complex is at 50-14N 030-05E,
approximately 19 nm SW of Kiyev, USSR. The complex is oriented. on an
azimuth of 230 d.egrees and. is at an elevation of approximately 600 feet.
First id.entified. on photo rah of
the complex was not present on
The complex consists of 3 launch sites (A, B, and. C), a support
facility, a missile-hand.ling facility, and. a tracking/guidance facility.
An air warning radar facility is under construction approximately 2.5 nm
ENE of the complex.
Track bed.s at the launch positions of Sites A and. C and. launch points
at all launch positions are under construction.
At least 6 buildings are und.er construction in the support facility.
The missile-handling facility consists of a parallel road. system and.
the possible construction sites of the missile assembly/checkout buildings.
The possible site-for the construction of a missile/missile component
storage building is north of this facility.
Construction of 3 radar mounds and. the complex control center is under-
way at the tracking/guidance facility.
Handle Via
Approved For Release 2T0&EREIR-RtFf8T04759A00730001PM14t-KEYHOLE
ystem Only
A,PfT04759A007300010003-4
Handle via Approved For Release 20fyr ,(ra1/ick ftRI(U r
Talent-KEYHOLE J
Control System Only TCS-8050367
August 1967
25X1 D
Handle via
~~1/1 CRUI 78T04759A0073000 T !g n -KEYHOLE
Approved For Release 6~ PSjstem only