PROBABLE MISSILE PRODUCTION FACILITIES PEIPING AIRFRAME PLANT CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T04759A002100010022-0
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 26, 2001
Sequence Number: 
22
Case Number: 
Publication Date: 
November 1, 1965
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T04759A002100010022-0.pdf448.47 KB
Body: 
Approved Fbr F~eTe~~~Z001/09/01 :CIA-RDP78T04759A002100010022-0 PHOTOGRAPHIC INTERPI~TA."(5~1~ R~'01~'~?, PROBABLE MISSILE PRODUCTION FACILITIES PEIPING AIRFRAME PLANT CHINA DECLASS REVIEW by NIMA/DOD T CS-81455/65 NOVEMBER 19Ei5 COPY ~ _ ~ _;;~ 2 PAGES GROUP 1 EXCLUDED FROM AUTOMATIC DOWNGRADING AND DECLASSIFICATION Approved For Releas~~0'h~~~lA-RDP78T04759A002100~0022-0 Approved For Release 2001/09/01 :CIA-RDP78T04759A002100010022-0 This document contains information offec~ting the national security of the United States within the meaning of the espionage laws U. S, Code Title 18, Sections 793 and 794. The law prohibits its transmission or the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner prejudicial to the safety or interest of the Unified States or For the benefit of any Foreign government to the detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorised to receive Information in the designated control channels. Its security must be maintained in accordance with regulations pertaining toTALENT?KEYHOLE Control System. Approved For Release 2001/09/01 :CIA-RDP78T04759A002100010022-0 Tai a vi~~(~d For Release 2001/09/~Q~CI~BR~87W4~9A002100010022-0 TCS-81455/65 Control System Only November 1965 Probable Missile Production Facilities, Peiping Airframe Plant A recent study of facilities at the Peiping Airframe Plant reveals 2 structures which could associate this plant with missile production in Communist China. The 2 structures are identified as a probable vertical assembly build- ing and a probable hydrostatic test tower. They are situated in close proximity to each other in the eastern section of the plant. The probable vertical assembly building measures 220 by 180 feet, with a high bay sec- tion measuring 195 by 110 feet and approximately 75 feet high. The probable hydrostatic test tower has a peaked roof measuring 40 by 40 feet and approxi- mately 75 feet high. Neither of these structures was present on photography in both appeared to be in late stages of construction. The present floorspace of the plant is approximately 2.3 million square feet, most of which is contained in assembly buildings, machine shops, work- shops, foundries, and a probable design bureau. Handle Via pp ~oP ~~~L~~F~ Talent?KEYHOLE A roved For Release 2001/09 C [S 9A002100010022-0 contro~ SystE;m Only Approved For Release 2001/09/01 :CIA-RDP78T04759A002100010022-0 ~o ~ r m ~~ ~ .', TES -- -- - - --~ - OWER ~ r PR{) ~? ~ ~ .~~ - ~ ~ ~'a- n ~I ~T ~'~iva BABLE ~ VERTICAL A55EMBLY ~ ? ~ ' "'~"w.,,~~.~~ _ .. BUILDING ~ ~'~;; 1'~7 ,_ +? a .~,~. - - ~-.< '~ w n Approved For Release 2001/09/01 :CIA-RDP78T04759A002100010022-0 Approved For Release 2001/09/01~OCIA RD~78T~4759A002100010022-0 Approved For Release 2001/09/(~'~?~tl~'~'04759A002100010022-0