MONTHLY PROGRESS REPORT, CONTRACT (Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A001600020094-0
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
6
Document Creation Date:
December 28, 2016
Document Release Date:
April 19, 2000
Sequence Number:
94
Case Number:
Publication Date:
January 31, 1964
Content Type:
MEMO
File:
Attachment | Size |
---|---|
![]() | 138.47 KB |
Body:
1M5oc&rtse, 0/06/07: CIA-RDP78B0*F47A00160002
Memo No:
STATOTHR
TO:
FROM:
SUBJECT:
DATE:
General
Declass Review, NIMAIDoD
Contracting Officer j/
Project Engineer, E80 STATOTHR
Monthly Progress Report, Contract
31 January 1964
The progress report is separated into several sections, the first of which is a percentage
>ummary of the schedule. This is followed by a statement on the progress and remarks on
work completed, work in process and planned work effort. Finally a table showin,: each
task and the percentage complete is supplied.
B. Schedule
Percent Required
Major Project Tasks
Percent Complete
By Project Schedule
I
System Engineering
100%
100%
II
Subsystem Design
75%
75%
III
Construction and/or
Purchasing and Assembly
15%
20%
IV
Testing and Debugging
0%
0%
V
Final Inspection
0%
0%
As indicated in the project completion percentages, the project is progressing according
to schedule with the exception of the task identified in the listing in Table 1. It is
expected that this will be advanced in February. ,
C. Summary of Progress
1. Electronic Control
The major effort this month has been centered around the design of the special
Electronic circuits for controlling the system clock frequency.
Approved For Release 2000/06/07 : CIA-RDP78BO4747AO01600020094-0
MenAp QMed7For. lease 2000/06/07 : CIA-RDP78904747AO01600020094-0
Page 2
2. Coor'+natograph
The table and related castings are under fabrication and two pictures of some
castings are enclosed. The table itself is in the heat treating stage.
D. Planned Work Effort
The general schedule is as follows:
February
1. Complete cabinetry design
2. Specify temperature sensing system
W
3. Assemble servo `test apparatus
4. Wire electronic racks
5. Begin Testing electronic racks
March
1. Test servo apporr tus
2. Test cooling systems
3. Test electronic racks
April l
1. Assemble and wire coordinotograph
2. System test
Detailed Progress Report
Detailed estimates of progress on all project tasks are listed in Table I. The following is
an explanation of the progress approximations listed.
0% Tasks not started
10% Tasks started but not 25% accomplished
25% Tasks over 25% accomplished but less than 50?%o accomplished
50% Tasks over 508 accomplished but less than 75% accomplished
75% Tasks over 75% accomplished but less than 100`'i,, accomplished
100% Tasks completed
Approved For Release 2000/06/07 : CIA-RDP78BO4747AO01600020094-0
Approved For Re1edse 2000/06/07 : CIA-RDP78B0 7A001600020094-0
Progress Report on Project Tasks
Project Tasks Labor Effort
Percent Complete
IV.
Testing and Debugging
A. Coordinatograph
1.
Structure
a.
b.
c.
Support and Table
Gantry and Carriage
Vacuum Platen
2.
Drive System
a.
b.
c.
d.
Power Control
Power Supply
Tost Apparatus
Cooling System
3.
Human Engineering
a.
b.
Manual Controls
Cabinetry
4.
Paper Feed Subsystem
5.
Writing Head
B. Electronic Control
1. Logic Circuits
2. Axis Instrumentation
Approved For Release 2000/06/07 : CIA-RDP78BO4747AO01600020094-0
Approved For to Nraogre2l~epoO on royjc - 78B94747A001600020094-0
Project Tasks Labor Effort
Percent Complete
Ill. Construction and/or Purchasing and Assembly
A. Coordinotograph
1. Structure
a. Support and Table A
b. Gantry and Carriage
c. Vacuum Platen
2. Drive System
a. Power Control
b. Power Supply
c. Servo System Test Apparatus
d. Temperature Sensors
3. Human Engineering
25
25
25
10
0
0
0
a. Manual Controls 50
b. Cabinetry 0
4. Paper Feed Subsystem
5. Writing Head
B. Electronic Control
1. Standard Logic Board Fabrication
2. Special Logic Board Fabrication
3. Intra-rack Wiring
4. Inter Rack wiring
5. Axis Instrumentation
100
Approved For Release 2000/06/07 : CIA-RDP78BO4747AO01600020094-0
Approved For RQpase 2000/06/07 : CJA-R[ 17860 47AO01600020094-0
Progress Report on rojec ..s
Project Tasks
II. Subsystem Design
A. Coordinatogrnph
1. Structure
as Support and Table
b. Gantry and Carriage
co Vacuum Platen
2. Drive System
a. Power Control
b. Power Supply
c. Test Apparatus
d. Heat Load Calculations
3. Human Engineering
as Manual Controls
b. Cabinetry
4. Paper Feed Subsystem
5. Writing Head
B. Electronic Control
1. Detailed Logic
2. Special Circuit Design
3. Rack and Cable Allotment
4. Axis Instrumentation
5. Heat Load Calculation
Labor Effort
Percent Complt
100
100
100
100
50
100
100
50
75
50
100
75
75
25
100
100
Approved For Release 2000/06/07 : CIA-RDP78BO4747AO01600020094-0
Approved For Rease 2000/06//AOILESIA-RDP78BO4W47A001600020094-0
Progress Report on Project Tasks
Project Tasks
Labor Effort
Percent Complete
1.
System Engineering - Develop Subassembly Specifications
A. Coordinatograph
1.
Structure
100
2.
Drive System
75
3.
Human Engineering
100
4.
Paper Feed Subsystem
100
5.
Writing Head
100
B. Electronics Control 100
Approved For Release 2000/06/07 : CIA-RDP78BO4747AO01600020094-0