MONTHLY PROGRESS REPORT, (Sanitized)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78B04747A001600020092-2
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
5
Document Creation Date:
December 28, 2016
Document Release Date:
April 19, 2000
Sequence Number:
92
Case Number:
Publication Date:
March 5, 1964
Content Type:
MEMO
File:
Attachment | Size |
---|---|
CIA-RDP78B04747A001600020092-2.pdf | 103.56 KB |
Body:
Approved For Release S00/06/07: CIA-RDP78BO4747AO016001W0092-2
Memorandum
DECLASSIFICATION REVIEW BY NIMA / DoD
1094
STATOTHR
TO: contracting Officer
FROM: Project Engineer, Ea@ATOTHR
SUBJECT: Monthly Progress Repor t, Contract-
DATE: 5 March 1964
A. General
The progress report is seperated into several sections, the first of which is a percentage
summary of the schedule. This is followed by a statement on the progress and remarks on
work completed, work in process and planned work effort. Finally a table showing each
task and the percentage complete is supplied.
B. Schedule
Ma1er Project Tasks
Percent Complete
Percent Required
By Project Schedule
I
System Engineering
100%
100%
II
Subsystem Design
90%
100%
III
Construction and/or
Purchasing arld Assembly
25%
50%
IV
Testing and Debugging
10%
25%
V
Final Inspection
0%0
0%
C. Summary of Progress
1. Electronic Control.
The major effort this month has been centered aroung the testing of the special
Electronic circuits and checking the cabinet design, Some of the circuits have
been released for manufacture and all of the cabinet has been released.
2. Coordinatograph
The table and related castings are still under fabrication. All castings have been
machined and assembly starts in the first weeks of March.
Approved For Release 2000/06/07 : CIA-RDP78BO4747AO01600020092-2
gPou t FgIielease 00/06/07 : CIA-RDP78BO4747AO0160 0092-2
Page 2
Planned Work Effort
the aeneral schedule is as follows:
March
1. Specify temperature sensing system
2. Use the servo test apparatus
3. Wire more electronic racks
4. Test electronic racks
A ril
1 . Test servo apparatus
2. Test cooling system
3. Test electronic racks
E. Detailed Progress Report
Detailed estimates of progress on all project tasks are listed in Table I. The following is
an explanation of the progress approximations listed.
0% Tasks not started
10% Tasks started but not 25% accomplished
25% Tasks over 25% accomplished but less than 50% accomplished
50% Tasks over 50% accomplished but less than 75% accomplished
75% Tasks over 75% accomplished but less than 100% accomplished
100% Tasks completed
connector that will be used to terminate the lines at the- cabinet.
STATOTHR
for special functions. TheM connector lists bits zero to 35. Where in the_
number and upon what connector pins will the X bits be, the X sign bit, the Y bits, the
Y sign bit, and the remaining special function bits. Also, what is the specific cable
Question on Computer Interface
s-rararaR
Thc~, will supply= a 30 bit word consisting of a 10 bit X dimension plus a sign and
a 10 bit Y dimension plus a sign. This is a total of 22 bits. The other 8 bits will be used
TWT/bd
Approved For Release 2000/06/07 : CIA RDP78BO4747AO01600020092-2
ILLEGIB
Approved For Release 2000/06/07 : CIA-RDP78BO4747AO01600020092-2
Next 1 Page(s) In Document Exempt
Approved For Release 2000/06/07 : CIA-RDP78BO4747AO01600020092-2
Approved For Release MO/06/07: CIA-RDP78BO4747AO0160 092-2
roject a risks
Lro ress Drt on 1'rojF ct f c~si