SUBJECT: SUN STREAK OPERATIONAL REPORT 8915
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP96-00789R000500200003-2
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
3
Document Creation Date:
November 4, 2016
Document Release Date:
December 7, 1998
Sequence Number:
3
Case Number:
Publication Date:
July 5, 1989
Content Type:
MF
File:
Attachment | Size |
---|---|
CIA-RDP96-00789R000500200003-2.pdf | 100.16 KB |
Body:
Approved For Release 2000/08/08 : CIA-RDP96-00789R0005002"0 03(-2
S20,012/DT-S89
61-S
pTMENi OF OE
5 July 1989
MEMORANDUM FOR CHIEF SCIENTIST DEFENSE INTELLIGENCE
AGENCY
SUBJECT: SUN STREAK Operational Report - 8915 (U)
1. S/NF/SK) During the period of 7 April 1989 o 16 June 1989
inclusively, eleven sessions were conducted to determine the key
function and supporting activities of a target area reflected in
a copy of overhead photography atttached as Enclosure .1.
2. (S/NF/SK) Remote Viewer 025 described the target site as a
Soviet military complex dedicated to some sort.of engineering
function and to the training of military personnel in skills
related to field artillery. Military personnel were perceived as
undergoing training in the main building of the target complex.
The use of computers and magnetic relay systems are involved with
the target site.
3. (S/NF/SK) Viewer 011 described the target area as comprised
of a group of structures strategically located at some sort of
crossroads in a flat dry basin area. To the northeast are steep
rugged cliffs bordering upon a high plateau. The key structure
is perceived as being geometrically shaped as a "circle inside a
square." The key function appeared related to the refinement of
liquids that circulate through pipes under great pressure to
empty into tanks and cisterns. An abundance of water is
important to the site's function.
4. (S/NF/SK) According to Remote Viewer 095, the site consists
of a complex, a series of structures surrounded by level land in
a foreign country. A predominant multi-storied office building
is surrounded by a cluster of mobile secondary structures holding
military weapons that are "worked on-,here." Except for the
WARNING NOTICE: SENSITIVE
INTELLIGENCE SOURCES AND
METHODS INVOLVED
HANDLE VIA SKEET CHANNELS ONLY
SPECIAL ACCESS REQUIRED
CLASSIFIED BY: CH SC, DIA
DECLASSIFY BY: OADR
Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200003-2
Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200003-2
presence of small arms they represent the only type of weapon
present at the site. The key function is related to the main
central building where administrative staff work is performed.
"Mechanical work" is done in the smaller adjoining buildings.
From ten to twenty vehicles are brought in by rail at a given
time. Turn around time for work completion is about two weeks.
5. (S/NF/SK) Remote Viewer 003 incorrectly perceived the area
as comprised of closely-spaced group of buildings of different
heights. The main structure is primarily intended for the
gathering of groups of people in some form of religious
commonality, to plan, discuss, and insure a transition of
leadership.
6. (S/NF/SK) Remote viewer 079 described the site as a Soviet
military complex. The key function involves a large object
sweeping an unidentified material in tubular-shaped containers.
The tubular objects are used in the conduct of military
exercises. Some of the tubular objects were transported to
Czechoslovakia to assist in military training exercises. The
activity appeared somehow related or associated with the conduct
of chemical and nuclear warfare.
7. (S/NF/SK) There was no apparent correlation among the
viewers in the results of their efforts. The results appear
inconclusive.
1 Enclosure SG1J
Branch Chief
Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200003-2
SG1C
Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200003-2
Approved For Release 2000/08/08 : CIA-RDP96-00789R000500200003-2