8914-I SESSION 02, SOLO, VIEWER # 018

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP96-00789R000500190009-8
Release Decision: 
RIFPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
November 4, 2016
Document Release Date: 
April 11, 2000
Sequence Number: 
9
Case Number: 
Publication Date: 
April 20, 1989
Content Type: 
REQ
File: 
AttachmentSize
PDF icon CIA-RDP96-00789R000500190009-8.pdf123.48 KB
Body: 
Approved For Release 2000/08/08 : CIA-RDP96-00789R000500190009-8 , NC::IFORN PROJECT SUN STREAK WARNING I\It:3 I I c.::E ? INTELLIGENCE SOURCES AND METHODS INVOLVED _......... - ........................................................................................................................................................................................................................................................................................................................................ DATE OF SESSION: 890419 START: 0750 METHODOLOGY g SOLO DATE OF REPORT: 89042c) END: 083::''; VIEWER IDENTIFIER: 018 1. (S/NF/ Sr::) MISSION: Describe the most unique aspect and function of the target site and provide an overhead sketch of the target ar?e al? 2. (S/NF/SK) VIEWER TASKING: :I:nst?.r_I.u:::t.:i.ons to viewer .t.c:s take the overhead sketch from his previous session and probe it to see if he could obtain more detail,, :3 (S/NF/SK) COMMENTS: 018 obtained a muc::h more detailed overhead perspective. In addition, he obtained additional specific information about the structures at the site. I"'IANDL...E VIA SKEET CHANNELS ONLY SPECIAL ACCESS REQUIRED ........... .............. -.........................,................ ...................................... . NOFORN CLASSIFIED BY: DIA (DT) DECLASSIFY ON: OADR Approved For Release 2000%08/08 : CIA-RDP96-00789R000500190009-8 Approved For Release 2000/08/08 : CIA-RDP96-00789R000500190009-8 Project: 89__ Date: 890419 Viewer: 018 Session: 02 SUMMARY OF INFORMATION: 1. A stage 6 probe map was made of the target area (see page W. The following impressions were derived from the probe map: a. (##1 on the probe map) This point was marked as the target coordinates and used as a beginning probe point for the probe map. b. (#2 on the probe map) A paved "walkway" which traverses the entire site area. c. (#3 on the probe map) A grey structure located parallel to the walkway. There were no impressions inside this structure that it held any EEI. d. (*4 on the probe map) A "ramp" area which is a part of the grey structure. A person was seen using this "ramp" to enter the building. e. (##5 on the probe map) A curved offshoot to the major walkway (see 1.b., above) which appears to angle back toward the grey structure. f. 06 on the probe map) There was an impression here of a girl in a yellow spring--fashion dress standing at a sales counter, evidently buying something. This impression, though completely out of place with the target site, was very strong. (*7 on the probe map) The building where the material described in the previous session is manufactured. This is a large, square, flat, grey building. It gives the impression of being more modern in design, and the feeling on the interior was that of actual work and implementation being HANDLE VIA SKEET CHANNELS ONLY OW&WWWO Approved For Release 2000/08/08 : CIA-RDP96-00789R000500190009-8 Approved For Release 2000/08/08 : CIA-RDP96-00789R000500190009-8 MOMONEW done. h. (#8 on the probe map) The building where the person (the Director) described in the last session normally works. This is a red brick building with large white "trim" and a somewhat ornate top. It gives a feeling of "old, elegant, and distinguished" (see also, 1.m., below). i. (#9 on the probe map) A large, circular paved area of the "walkway" which has a circle of benches in the middle. There was no impression of plants or other decorations here. j. (#10 on the probe map) A large hole in the ground; evidently a part of a construction site. k. ((#11 on the probe map) A building under construction. It is to be a tail (multi-storied) and slender building, but is presently at the stage of girders only. M. (#12 on the probe map) A building which had the same appearance as described in 1.h., above. These two buildings not only look: and "feel" alike, but also gave the impression of being the only two buildings viewed which are lined up in a row. All the other buildings were seen to be at odd angles to one another. This building did not contain any impressions of being of EEI value. 2. At the end of the session, the probe map was traced onto a clean sheet to form an overhead map (see page 7) for reporting purposes. HANDLE VIA SKEET CHANNELS ONLY damew-W Approved For Release 2000/08/08 : CIA-RDP96-00789R000500190009-8