ARGAYASH THERMAL ELECTRIC POWER PLANT, KYSHTYM ATOMIC ENERGY COMPLEX, USSR, (Sanitized)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78B04560A002100010005-0
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
December 29, 2000
Sequence Number: 
5
Case Number: 
Publication Date: 
January 1, 1964
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78B04560A002100010005-0.pdf600.48 KB
Body: 
A roved For Release 2~A03~~ITA-RDP78B04560AQ~~,Qp~~05-0 Copy ry / ~~ ` January 1964 ~ 4 P ages / ~ ~ ~. ~ . ,..-.. -r s ~ r r-ti w w w it Ir ~ li- /~ T ~ 1 ~ ~ r1 l A / C L~ D I O ICI T 25X1 D Handle via TALENT -KEYHOLE Control Only DECLASS REVIEW BY NIMA / DoD This document contains classified information affecting the national security of the United States within the meaning of the espionage laws U. 5. Code Title 18, Sections 793 and 794. The law prohibits its transmission or the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner prejudicial to the safety or interest of the United States or far the benefit of any foreign government to the detriment of the United States. It is to be seen only by personnel especially indoctrinated and authorized to receive TALENT-KEYHOLE information. Its security must be maintained in accordance with KEYHOLE and TALENT regulations. NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER i i TOP SECRET GROUP 1 E.cl~d ed (ra~~ a?~omoi~c do.+ngrod d dec a..~iica pion Approved For Release 2001/03/03 :CIA-RDP78B04560A0021000~Ov=p Approved For Release~2D01763S0~~TCIA--1~~~7$~04560A002100010005-0 ARGAYASH THERMAL ELECTRIC POWER PLANT, KYSHTYM ATOMIC ENERGY COMPLEX, USSR, 25X1A 25X1A 25X1 D 25X1 D 25X1 D This report updates infor- mation 1/ on the Argayash Thermal Electric Power Plant (Argayash TFTS, and is based on K>/YIIOLE photography Detailed reports on the other principal areas in the complex have been published 2/ or are being prepared for publication by NPIC under project number J-220/63. The excellent quality of the~hotography of Argayash TITS provides details not previ- ously discernible and permits an analysis of changes which have occurred as well as a re- 25X1 D finement of building configurations and measure- ments (Figure 1). The boilerhouse consists of. two sections: an older section which probably houses four boilers attached to one stack by flues and a newer section which probably houses five boilers connected to two stacks by flues. The newer section of the boilerhouse may be ex- tended in the future to house an additional boiler. Newly identified buildings include a fanhouse, a possible water treatment building, a coal thawing building, and several service and maintenance buildings. Item numbers are keyed to 1~'igure 2 and Table 1. The Argayash TE'I'S (55-38N 60-46F) lo- cated 3 nautical miles south of the Main Produc- tion Area is the principal source of both electric power and steam used in the Kyshtym Atomic Energy Complex, particularly in the Main Pro- duction Area (Figure 2 and. Table 1). The power plant is separately secured and is served by at least seven rail spurs. It contains a combined boilerhouse (item 5) and generator Ball (item 4), three stacks (A, B, and C), a newly identified fanhouse (item 6), a switching yard, a newly identified possible water treatment building (i.tem 16), and several service and maintenance buildings. A newly identified coal thawing build- ing (item 17) and a large coalyard are visible in the southern portion of the plant. "1'he boiler- house is approximately 595 by 100feetandprob- ably houses nine boilers. The locations and con- figurations of the flues and stacks south of the boilerhouse indicate that this building consists of an older section at the west end which houses four boilers and a newer section at the east end which houses five boilers. Flues connect the four boilers in the old section to stack A. In the new section flues connect three of the boilers to stack B and the remaining two boilers to stack C. "I'lhe flues pass through a. fanhouse (item 6) containing induced draft fans. An uncon- nected flue section projecting from stack C may indicate that the east end of the 'boilerhouse will be expanded to accommodate at least one more boiler. Stacks A and B are about 210 feet apart on centers, and stacks B and C are about 185 feet apart on centers. The generator hall (item 4), which is about 785 by 100 feet, probably houses seven steam turbogenerators since seven step-up transform- ers are visible in the power plant's 11.0-kilo- volt (kv) switching yard north of the generator hall. Three, possibly four, 110-kv circuits Approved For Releas TOP1/S~(~~~~I~~~P~8~~4~60A002100010005-0 TOP SECRE~ ? ~'~~~ ~~~ Approved For Release 2001/03/0 P 4560A002100010005-0 } _--- ?~ 4 0' 6 _~\ SVERDLO VSW ,?KYSH TYM ~_ M 09C ONE '?? CF~ELYABI NIS K: 'i ~~`~~ ~, 5~a `~ .O~ - -- ~ R;LACK `~~SF.A FIGURE 1. ARGAYASH THERMAL ELECTRIC POWER PLANT (ARGAYA'>H TETS), c~sPi.arv ~ .~A 25X1 D Approved For Rele~~ 2Q~1~Q~L~3 ~~~S~DRU~,04560A002100010005-0 Approved For Releasre~UOTiU~03rC~'-F~D~78SO4560A002100010005-0 TO KY SH TYM SUBSTATION 1 D SECURED DRAINAGE AREA TO NO VOGORNVY AND CH ELVABINSK HOT WATER OUTLET TaGle 1. Desrri.y~tion of Structures aG ~1rgayash TLTS (1(rm nu~aGera are key/ed bo Fiyure l) Steam supply cantraL valve bldg (?) Transformer maintenance bldg Control bldg f'or switching ,yard Generator hall 33oilerhousc 1`anhouso Possible transformcroil storage tanks Probable machine Shop Probable materials storal;e bldg SUBSTATION D MAIN PRODUCTION AREA Railroad Road Rail for gantry crane Fence Steam line Power line Flue Tall stack Hardstand Administration bldg Probable security btdg Hot-water outlet control bldg Intake pumping station Probable buried tanks Coal conveyer system Possible water treatment bldg Coal thawing bldg Approved For Releas T22QP1/~~1~,~~~I~R~~8~60A002100010005-0 Approved For Releas~'ZOO~Q3t0'~: ~I~~P~4560A002100010005-0 the switching ~~ard and are connected to one another by a ne~~~ly identified bypass steam line, Although this bypass steam line existed at the time of the-KIYI IOL,>/ photography of the area, the poor quality of this photography precluded its identification. Pipe connections from the power plant to the steam supply control valve buildings are probably buried and cannot he identified nn tlie-photography, Nn apparenT change is discernible in the pre- viously reporter] hot-water circulation through Lake lJlagach w~? ich i s used as a cooling pond. 1 i 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D 25X1 D supported on twoZ-circuit power lines leave the separately secured switching yard and are now believed to he tied into substation n in the (;heroical Processing Area. Several buildings east of the boilerhouse and generator hall may have been used during the construction of the power plant. Steam generated by Argayash TP:TS is -fed through two steam lines into a main control and distribution point southwest ~f the ~~iain Production Area, Two steam supply control. valve buildings (item 1) are located north of \C1C. i:S air Targer, Chart, 5erio,~ ~>00, rha~or 0161-:31, ??~l end, Jan 6U, .~~~~Lle 1:?~uu,00q (sF.CNI?T) 1. SPIC. R-103,'6:3, Atomic Fnor~y Complox, Kv~htvrn, i'~~R'~ Jun 6.', (TOP :iECRET CHESh RUFF) SPU'. R-?Ih,-'63, Iteac~.ar .-1re~a I, Ky?.~htcm ALOmic FnE~r~c Cornpl - CHESS RUFF) 1PIC. R 281,6:3, Reactor 1rr,i II K,y=htym atomi_P:m~r~y~ ComplE~x, [,'~tiR~O~~t Ei3 (TOP SECRE'P ( HFSS RUFF - SPIC. R-O99,'63, Reactor :1rc~a III, Kv~~ht.cm .-~Lornic P;n~~r~~~ Cumpl~~x, CSS]~~Nov Ei8 (TOP sFC~ZET CIIR~S RIFF) --- tiYIC. R 32;'63 TatySh Production Area, h}-'sh6,ym .Atnmic. Ener; ~FCNET CHESS RI?P'F) --- -- --- Compiox, 1 :ASR Dec 63 (TOP 25X1 D 25X1 D Approved For Release 2001/03/03 :CIA-RDP78B04560A002100010005-0 TOP SECRET CHESS RUFF Approved For Release 2001/Or370~3 :"C~='RDP78B04560A002100010005-0 Approved For Release 2001/~~(Q3$~~;f~,pP78B04560A002100010005-0