ROAD BRIDGES ACROSS THE FINOW CANAL
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP82-00457R006300610012-6
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
November 16, 2016
Document Release Date:
March 31, 2000
Sequence Number:
12
Case Number:
Publication Date:
December 13, 1950
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 146.59 KB |
Body:
1y a L.LL-mppruveu rur rceieas-e zuuwuari o Lluwr
4
CLASSIFICATION sm)M/CONTROL, - n
CENTRAL 'ELLIGENCE AGENCY
V.R00630061~ ??;A6
ATA MIN
REPORT NO. b 1-
INFORMATION REPORT CD NO.
COUNTRY Germany (Russian Zone)
SUBJECT Road Bridges across the
Finm Canal
PLACE
ACQUIRED
DATE OF
INFO.
25X1X
DISVIISUP cCmt9 110.
M
STAN
JAVY IA' I X1 FBI
-
DATE DISTR. 13 December 1950
NO. OF PAGES 2
25X1 A 1 N (LNO. OF ENCLS.
ISTED BELOW)
f SUPPLEMENT TO
REPORT NO.
1. The old drawbridge at liederfiaow (canal kut :.:ark 86?32) is pdrtly
-destroyed and a temporary bridge has been built,, Its replacement by a
permanent structure is contained in the 1951 program under No 36.
2. The Kuh Bridge (dal km mark 34.11) which is in the course of a field
path was rc paired in a makeshift way. At -.Ira ;ant it does. not delay
shipping.
3. The ;ernnel Bridge in i berswalde (canal km, mark 77.98)., is in the course
of a local mudroad.. It is 2.3 meters wide and 50 percent destroyed0
4, The former Lifting Bridge at : borsmlde (canal kr.2 nark 77-)76) was to be
reconstructed as a ferroconcrete -)late girder bridge in 19 0151. The
foundation pits for the abutments are completed.
5. The ;ilhelms Bridge on ilhelmstr?asse in .9bersualde (canal km I- .ark 77.02)
is destroyed, The debris of the bridge has been cleared from the canal',
6. The Kupforhammer Bridge (canal km mark 75.47) is a temporary bridge of
double T girders resting on a log crib which was erected instead of the
destroyed center bier? The lo- crib impedes s'zippingo It is planned to
reconstruct the bridge in 1951.
7. The isenspalterei Lifting Bridge (canal km stark 73051) is to be re-
constructed as an elevated ferroconcrete structure in 1'5l?
fq The iieegert: uehie Bridge (canal km mark 710214) is now being reconstructed.
One abutment is completed, another is half cc Dieted, and one cotter pier
remains to be erected? It would be possible to mount the superstructure of
rolled girders before the end of the year.
This document is hereby .regraded to
CCNFIDENTIAL in actor nce with the
Dire of 16 October a73 from the
ArrelvspEftrlr l' r 05/18
Next Review Date: 2008
;CONFIDENTIAL
CLASSIFICATION / OITMO ,
Approved For Rele 2000/5/18 : CIA-RDP82-00457RO06
w
NWNTIAL
S RET CONY OL -- U. S. OFFICIALS ONLY
CENTRAL INTELLIGENCE AGENCY
-2-
25X1A
9' ? he + :ho of 1rto Lock Fr'idge in, Sirto.J (cana
t ercorit C:),:1:)lo e:'1.. 0riiy the ro?;t