MKULTRA SUBPROJECT 21 (8 DOCUMENTS WITH PUBDATES FROM 531210 TO 550623)
Document Type:
Keywords:
Collection:
Document Number (FOIA) /ESDN (CREST):
00017417
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
9
Document Creation Date:
August 23, 2024
Document Release Date:
September 8, 1976
Sequence Number:
Case Number:
Publication Date:
December 10, 1953
File:
Attachment | Size |
---|---|
MKULTRA SUBPROJECT 21 (8[8144538].pdf | 644.02 KB |
Body:
Subprolact 21-
Description
Date
Obligations Expenditures
Balance
,
ce-try
Au-
7,20,0o
if
It is proposed that the
be provided with fund
the study and.eValuation or certain persops released by
ist bloc countries. The cost of the work con. mplated
in this project is as follows:- ---
Personal Compensation -
-2120.00
Travel
2000.00
_
Miscellaneous
1000.00
Ttital $5/20. 00
1.04011AIMUIllat : THE RECORD
: Project M1CULTRA; Subproject. #21
1. The aim of this subproject is to provide funds for
an increase in the scope of that portion of Subproject 48
which deals with the over-all-returnee interrogation and re-
habilitation program now being arried out by the
Since
impossible to estimate in advance t e num er of subjects to
be handled under this program/ it will be necessary_to_enlarge _
its scope from time to time.
2. Subproject 21 was set up originally fo t
of providing a drug screening facility at the
The total cost of the program amOun ed to 572 .00.
Unfortuna elyi-internal-politios at the made it im-
� possible to carry out the program, as plann i And so no funds
were over expended in this Subproject. The basis for the change
of Subproject 21 frOm its original goal to the present one is
based upon an identical case where Subproject 10 was converted
,9 for use in the project after it became evident that the
funds couitted un it originally for another purpose could
A not be used. has since audited Subproject 10 with-
out qu.stioning this type of handling.
;-
3. Accounting for funds-expended by the contractor in
this subproject will be reflected in the general accounting
for Subprojeot 48. .
4. The-tatal charges for this project will not exceed
$5720.00 for a period of one year ending 30 June 1956.
5. the PrihPiPele
in this proj o are TS cleared.. Cut-outs and cover arrangements
will be used for dealings with unwitting personnel.
Al:PROVED FOR -
.OBLIGATION-OF FUNDS:
Date: o�
TSS/
:111
Distribution:
Original Only
Obetioal-Divisi0
1 January 1955
14VIMNDUM FM: TliE RECORD
SUBJECT Extension of Time for Project
HKULTRA,-SUbproject 21
Since_SUbproject 21 has expired and there are Ain__
�binds remaining in the project, Subproject 21. is berehy
extended for one year from date of ekpiration.
APPROVED:
Original Only
PRAR11AC0LOOICAL TESTV0-OF OFFii0T kPEUTIC AGE= FOR GiV
The principle investigator, is familiar
'with the diphenolic compounds originally syntheSied4t-the
under the direction of.
and is fully
C!
equipped to proceed further the pharmacological testing and bio.=assay of such -
compounes.
It is purposed to test the LD/50 and the pharmaeolozical action
such compounds and related chemotherapeutic agents a3 ray be -submitted
from time to time through the Pathology. Department _at
r
modified by the principle investigator. Detailed reports and records util
be kept on the bio.Assays and pharmacological tests and submitted as they -
become available.
The budget desired for-this research proposal is:
Personnel labordtory_assistant $3,000,00 pf:r nnum
Animals and aniAli maintenance 1,000.00
Miscellaneous laboratory_ supplies 500.00
Travel
Total
Institutional overhead lO%
is an associate of the
conduct the work in the facilities of that, organization.
5,000.00
500.00
and will
UTEMORANDUM FOR THE RECORD
SUBJECT: Project tXUTJTRAJ,1 Subprolect 21
1. The scope of subproject 21, Project UKULTRA, is to pro--
vide CD/TSS with a facility where the pharmacological activity of
various materials of interest to the division can be determined
in a secure and complete fashion.
2. The chief investightor, routinely con-
ducts such,te ts on large numbers of materials in the laboratories .
of th- before the materials are -,13
screened for anti-cancer activity. _Thus, any materials fro% CD/
TSS can be included in this larger_ grouporithoutAheir true iden-
tity being known to anyone outside the Agency.
3. All busine4s-with will
be conducted through acting as cut-ou . The
attached proposal indicates 't,he distri u ion of funds. In addition
to the $5 500.00, a 4% service -charge, or -$220X0, for th
is required.
4. The total cost of-this-project for one iear ending-1-Janu-
ary 1955 will not exceed45i720-iOO.
4..
PROGR.A3L. AY-PROVED
AND RECOVIENDED:
Attachment: Proposal
SIDNEY GOTTLIEB
Chief
Chemical Division TSS
APPROVED FOR OBLIGATION-
OFIFUNDS:
Research 4rector
tate: ,2/ WV--)
_
the authority granted in-thS�memrandtte dated 13 April
1953 from the MI to the DD/A, and the further authority granted
in the memorandna date4 17 4ril 1953 !rime the vp/A to the Comp.-. -
troller en the subjeets npft.Tss Project UXULTRAi� and the ne..
mormrAmdsted 19 June 1953, from the ra to the DO extending
the aathority to cover Fiscal Year 1934 Cubproject 21 has been
approved, and 13,720.00 of the over-all Project MULMRA fUnds have
been obligated to cover the bproject's expenses.
:ROM)
SIDNEY GOMM
Chief
Chemical Division, TSS
APPROM-Pat OBLIGATION
ARV RECOUMIDEDI CY_ FUNDS:
Listribetioni
Addreasee tri
Exec. Seely.,
TWV4dzet
TWRegistry
TWCD -
Research Dire
if
�
DEC 21 ENID
7