Approved for Release: 2021/01/13 C05752555
%, �
.1.:11. �
OSA 7o2-7-0,2 1
29 May 1967
ATTN:
- .
SV15jgc.T:.;C-antract -.NOV P-0469,45.1File N6. JG-1969
'
� 1
Gent I�n:
(b)(1)
(b)(3) 10 USC 130
Approved for Release: 2021/01/13 C05752555
Approved for Release: 2021/01/13 C05752555
modification necessary for installation of the system. The system electronics Will
be redesigned and, constructed to fit within the remaining available spaee. Pre-
liminary investigations of the weight and center of gravity of the loaded aircraft
have shown that the aircraft limits will not be exceeded. The system electronics
to be initalledlin` the aiiciaff will be cleskpitirtill for rhinimurh 'operator reuil'ehients.
Electronic installation .time will be minimized and system eillibration will be
automated.
Flight testing will start immediately after aircraft modification and system installation
are complete, approximately 6 weeks after notification of program extension. These
flight tests, in addition' tO obtaining operational experience, will be planned to
determine the system limitations due to dynamic operation. System response to move-
ment of control surfaces and cables, ,aircraft maneuvers, other aircraft noises, and
geological formations Will'be stUdied. Correlation of aircraft system response with
ground tests (i.e., 17eipansepatterne, range parameters, and target parameters) will
be examined.
...__
In the event that the rounda and airbarne tests indicate that the (b)(1)
(b)(3) 10 USC 130
(b)(3)
at the direction of the Contracting Officer, will design
and build a prototype system for installation in a designated military aircraft. Approx-
imately Iwo moieties will be required for this design and fabrication.
The results of all tests- under the existing contract have indicated that the active
magnetic detection system, in its present form, is the most iensitive airborne mag-
netic detection system currently available. The purpose of this extension is to
examine the operation of the system in a small, lightweight aircraft in which the
targets of interest are those associated with limited war operations. For this evaluation,
a time extension under the present-contract of 6 montns and an increase of funds of
$199,061 is requested. The enclosed cost estimate and work outline summarize the
tasks to be perforcried 'under the extension.
Sincerely yours,
\ivm. T. Flannery
ViTF:mw
Enclosures
Approved for Release: 2021/01/13 C05752555
Approved for Release: 2021/01/13 C05752555
Objectives:
PROGRAM OUTLINE
Acquire data for the evaluation of the applicability of the
technique to limited war operations. (b)(1)
(b)(3) 10 USC 130
Approach: The evaluation viAll be performed under two parallel tasks:
(1) ground testing of an operational model; and (2) airborne testing
of system in light, single�engine aircraft.
I. Ground Testing'
1. Response pattern
a. velocity, altitude ratio
b. system geometry
c. operating frequency
2. Range parameters
C.
b.
operating power
operating frequency
target size, orie.ntation
3. Target parameters
G. material permeability, conductivity
b. critical frequency
c. target dimensions
II. .L.irbbrrie Testing
System design
a. aircraft modifications
L. power requirements
c. electronic requirements
2. System fab;ication
3. Flight tests (80 hours' 100 hours minimum flight time)
a. system limitations during flight
1) movement of control surfaces and cables
2) aircraft maneuvers
3) aircraft noise (magnetic)
4) geologic effects
Approved for Release: 2021/01/13 C05752555
Approved for Release: 2021/01/13 C05752555
b. system response
1) military targets (as available)
2) geological formations
4. Flight � Ground Test Correlation
HI. Operational Prototype (optional: as directed by Contracting Officer
1. System requirements
a. aircraft type
b. available power
c. equipment location
d. electronic requirements
2. System design
3. System Fabrication
Approved for Release: 2021/01/13 C05752555
Approved for Release: 2021/01/13 C05752555
AND PRICE ANALYSIS - RESEA7�ji AND DEVELOPMENT CONTRACTS
,iis form is to be used in lieu of DD Form 633, as provided under ASPR 16-206. It will be
,,xecu?ed and submitted with proposals in response to "Requests for Proposals," for the
procurement of research and development services. If your cost accounting system does not
permit analysis of costs as required, contact the purchasing office for further instructions.)
FORM APPROVED
BUDGET BUREAU NO. 22 - R208
NAME AND ADDRESS OF OFFEROR
The Electro-,V.echanics Company
II '9V 5.flJFH uny
TITLE OF PROJECT
The Extension of the Electromagnetic Active
Detection Technique (Total)
DETAIL DESCRIPTION
I. DIRECT LABOR (Specify)
Enaineerinv
Electronic Enaineers
Technicians
hop
Draftsmen
Mechanical Engineers
amen
Other:
ESTIMATED
HOURS
4,695
5,265
330
1:125
430
2.295
RATE/HOUR
5.75
3.10
2.50
5.00
3.10
3.10
TOTAL ESTIMATED
COST (Dollars)
26,996
16,321
825
5,625
1,334
7,114
Technical Tyoists
400
2.50
1.000
TOTAL DIRECT LABOR
2 BURDEN (Overhead specify) DEPARTMENT OR COST CENTER
Engineering
Shop
BURDEN RATE
X BASE:
BURDEN
($)
,59,215
70
120
45,142
14,073
31,600
ciqR
TOTAL BURDEN
k1 3. DIRECT MATERIAL
EST C OS T(1)
41,488
[...... 4. SPECIAL TESTING (Including field work at Government Installations
TOTAL MATERIAL
2
Qo)
TOTAL SPECIAL TESTING
S. SPECIAL EQUIPMENT ('If direct charge - specify in Exhibit B. reverse)
8. TRAVEL (If direct charge)
PAC@
a. TRANSPORTATION
b. PER DIEM OR SUBSISTENCE
TOTAL TRAVEL
7. CONSULTANTS (Identity - purpose - rate)
TOTAL CONSULTANTS
k,kkk
11 8. SUBCONTRACTS (Specify in Exhibit A on reverse)
S. OTHER DIRECT COSTS (Specify in ExhibR n on re a5�1ain r_o_yalty costa, If an
titrrAL dat ANO aOki0001
i.ReNg9.14. AND ADMINISTRATIVE EXPENSE (lb te of item noa.
82.
TOTAL ESTIMATED COST
13. FIXED FEE OR PROFIT (State basis for amount in proposal)
4 Is.
nrin
DD 1.-- 633
TOTAL ESTIMATED COST AND FIXED FEE OR PROFIT
5. 010
150,303 .
3O11
180.: 9M
18,097
-4
GPO 1962 0 - 643985