LOGISTICS SERVICES DIVISION WEEKLY REPORT PERIOD ENDING 4 MAY 1983
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
05379682
Release Decision:
RIPPUB
Original Classification:
U
Document Page Count:
4
Document Creation Date:
March 8, 2023
Document Release Date:
October 4, 2019
Sequence Number:
Case Number:
F-2018-00626
Publication Date:
May 4, 1983
File:
Attachment | Size |
---|---|
LOGISTICS SERVICES DIVISI[15731311].pdf | 99.32 KB |
Body:
Approved for Release: 2019/10/03 C05379682
LOGISTICS SERVICES DIVISION
WEEKLY REPORT
PERIOD ENDING 4 MAY 1983
I. Progress Report on Tasks Assigned by the DCl/DDCI:
No items this reporting period.
II. Items/Events of Major Interest:
p4-5
b. Analysts Study Area: The DDI has requested that a special
quiet area with oversize carrels be established for private study
by analysts. Space in the mezzanine vault of the CIA Library at
Headquarters Building has been set aside. A combination of excess
systems furniture components from the move of the Central Cover
Staff and new rapid-response items are to be used and the area is
expected to be ready in one month. The requisition for additional
parts has been sent to Procurement Division, OL.
c. Fine Arts Exhibits: The Marc Mellon exhibit of bronze
sculptures ended on 3 May, and the figures were returned to the
lenders.
From S May to 3 June 1983 an Office of Equal Opportunity
Asian-Pacific exhibit of employee-owned art and artifacts will
be displayed in the 1D Corridor at Headquarters Building.
The newly appointed Director of the Corcoran Museum, Michael
Botwinik, was hosted by the DDA and the Chief, Fine Arts Com-
mission (FAC) at a luncheon on 29 April 1983. It is hoped that
(b)(3)
(b)(3)
Approved for Release: 2019/10/03 C05379682
Approved for Release: 2019/10/03 C05379682
the Corcoran staff, after seeing the FAC exhibit area, will be
interested in lending items from its permanent collection to
the FAC for exhibition at Headquarters Building. 9/1
(b)(3)
e. Installation of Computer Equipment - Office of Global
Issues (OGI), DDI: The design has been approved for the
installation of computer equipment in DDI/OGI, 3G13/19 Head-
quarters. Construction drawings are 80 percent complete.
94
f. Redesign and Modification: A design has been completed
and presented to the Office of Data Processing for the redesign
and modification of the vault-type room, 2D0105 Headquarters
Building. 94
g. General Inspection of Headquarters Building: On
27 April 1983 personnel from Space Maintenance and Facilities
Branch (SMUB), LSD/OL, initiated a general inspection of the
Headquarters Building. This inspection includes handouts to
office personnel listing problem items which should be reported
to SIOFB for service. To date three telephone calls and one
memorandum requesting minor repairs have been received.
h. Air Sampling Test in Auditorium: On 3 and 4 May the
Safety Staff, DDA, conducted air sampling tests in the Audito-
rium at Headquarters Building to determine if asbestos particles
were present. Samples will be forwarded to a laboratory for
2
Approved for Release: 2019/10/03 C05379682
Approved for Release: 2019/10/03 C05379682
analysis, and results are expected in about two weeks. The Safety
Staff will prepare a memorandum for LSD giving test results when
they have been ascertained. (U/ U0)
i. Major Renovations - Office of Security (OS), DDA:
Carpentry, masonry, and electrical work are proceeding in Room
1E-0010 Headquarters. The Telephone Company has pulled all
station cables, and the necessary capping has been completed.
Cleaning of the area will be scheduled for the latter part of
this week, and the move is scheduled for this weekend.
j. Uncompleted Work for the Office of SIGINT Operations:
After the reported completion of work by GSA in Rooms GD-62/GE-04
Headquarters Building, SMUB had a walk-through visual inspection
of the area and discovered that the electrical and paint shops
had not finished their work. Upon notification of the uncom-
pleted jobs, they stated they would expedite the remaining work.
k. Installation of Temporary Duck Pond: On Wednesday,
27 April 1983, a member of SMUB installed a temporary duck pond
in the inner courtyard at Headquarters Building for the nesting
mallard duck and her expected ducklings. cj.Y
1. Roof Repair at Key Building:
is in the process of repairing the leaky roof at Key Building.
m. Renovations for Intelligence Community Staff (ICS), DCI:
Renovations have begun for the DCl/ICS in conjunction with the
relocation of WANG equipment to
3
(;4
Approved for Release: 2019/10/03 C05379682
Approved for Release: 2019/10/03 C05379682
III. Significant Events Anticipated During the Coming Week:
No items this reporting period. Sjkr
Chief
Logistics Services Division
II
4
Approved for Release: 2019/10/03 C05379682