REQUEST FOR FUNDS FOR CLOSEOUT OF AQUILINE CONTRACT WITH MCDONNELL DOUGLAS ASTRONAUTICS COMPANY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
02103240
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
24
Document Creation Date: 
July 16, 2020
Document Release Date: 
July 30, 2020
Sequence Number: 
Case Number: 
Publication Date: 
February 28, 1972
File: 
AttachmentSize
PDF icon REQUEST FOR FUNDS FOR CLO[15784067].pdf523.13 KB
Body: 
Approved for Release: 2020/02/11 CO2103240 - 3.3(h)(2) 3.5(c) BYE-9443-72 Copy 6 of /1-, MEMORANDUM FOR: Director of Central Intelligence SUBJECT: Request for Funds for Closeout of AQUILINE Contract with McDonnell Douglas Astronautics Company REFERENCE: Memo for DCI from DDS&T, dated 1 November 1971; Subject: Termination of Project AQUILINE (BYE-6507-71, Attachment I) 1. This memorandum contains a request for the approval of the Director of Central Intelligence. The specific request is contained in paragraph 6. 2. In accordance with the directive received from the Executive Director-Comptroller (reference memorandum), the AOUILINE Program was extended through 15 November 1971 with the funds previously authorized - through 7 November and through 15 November. Effective 1 November, MDAC was notified that all planned anned contract activity was to cease and they were to prepare their program closeout bid for presentation and negotiation. On 22 and 23 November, negotiations were conducted at MDAC which covered: program closeout costs and time; the determination of contract incentive bonuses allowable under the incentive clauses of the contract; MDAC fee and associated other open items remaining on Contract 3. Attachment II is the negotiated MDAC proposal for Program closeout in the amount of $ In addition to this closeout bid, it was determined that MDAC was due and should be awarded $ as incenti ment for satisfactory completion of the tasks as s ipua e. in Contract incentive clauses. Therefore, of the $ authorized by the Execu Director-Compt,ro11pr fnr terminating the MDAC efforts, only $ be required ($ for the contract extension 7 through 15 November il and $ for closeout costs). The following table presents the total picture on the results of the 22 and 23 November negotiations: Event or Activity Contract Value at 30 September 1971 (Less Fee) $ Contract Extension Thru 31 October 1971 Contract Extension Thru 7 November 1971 Contract Extension Thru 15 November 1971 Exclutomttic clown:�Wiand a.:dassilicatim DO T FILE COPY AQUILINE ye HANDLE VIA BYEMAM CONTROL SYSTEM Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 AQUILINE BYE-9443-72 Page 2 Event or Activity Contract Value 15 November (Less Fee) MDAC Expenditures and Commitments Thru 15 November Contract Funds Available at 15 November Fee Thru July 31, 1971 as Negotiated 22 November Fee July 31 Thru 15 November as Negotiated 22 November Total Negotiated Fee Minus 22 November Disallowed Costs (Material handling, ops hourly increase at Field Site,etc.) Subtotal $ Balance of (Funds of $ unds Available at 15 rvember Minus Fee of Contract Closeout Cost (At No Fee) Incentive Bonus Subtotal $ Additional Fundi R quired for Closeout and Incentives ( Minus of Available Fun 4. It is anticipated that all closeout actions of MDAC Contract will be completed not later than 15 February 1972. 5. Contract monitor for this closeout program will be . Security classification of this contract will remain Sc.- J. MUM SECRET HANDLE VIA BYEMAN CONTROL SYSTEM Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 SEC AQU INE BYE-9443-72 Page 3 6. It is specifically requested that you authorize the expenditure of funds in the amount of $188,700.00 for the purpose of closing out Contract and payment of incentive bonuses of that contract. CARL E. DUCKETT , Deputy Director for Science and Technology Attachments: I and II As Stated SIGNATURE RECOMMENDED: 1 FEB 1972 Director of Special Activities -V The request contained in paragraph 6 is approved: Is' Director of Central Intelligence Date F: Date AQUI E HANDLE VIA BYEMAN S FT CONTROL SYSTEM Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 jiig4dMr� AQUILINE BYE-9443-72 Page 4 DPM/AQUI/OSA, (2 December 1971) Distribution. Orig - DPM/AQUI/OSA (w/atts) 2 - DDCI (w/atts) 3 - Ex.Dir.-Comptroller (w/atts) 4 - ER (w/atts) 5 - DDS&T Chrono (w/atts) 6&7 - DDS&T Registry (w/o atts) 8 - SA/DDS&T (w/atts) 9 - PMS/ORD (w/atts) 10 - 0/PPB/DDS&T (w/atts) 11 - D/SA (w/atts) 12 - C/B&FD/OSA (w/atts) 13 - CMD/OSA (w/atts) 14 - RB/OSA (w/o atts) AQUILINE SF-GRE1 HANDLE VIA BYEMAN CONTROL SYSTEM Approved for Release: 2020/02/11 CO2103240 � I I _ (sPc-cify) UNCLASSIFIED- CCAp�p.rO\7eCrioiRelease: 2020/02/711 CO2103240= "�,,,mmampoemommemmomememm, REQUEST TO PROCUREMENT DIVISION FOR SERVICES' (other than property or building maintenance and repair.) DD/',AT# OFFICE/DIV/RR DDS&T/OSA/AQUI REQUEST NO. DATE OF REQUEST PROJECT TITLE AQUILINE EXTENSIoN n. 5682 14- 229 CERTIFY THAT rums.; Is TI AMOUNT Or $ [V no / " AVAILARLE CHARGE TO FAN. -SaNA-iURF OF BUDGETIOFFICIP CONTRACTOR (if known) McDonnell Douglas Astronautics Company PROPOSAL NO. AND DATE 24 Nov 1971 TYPE OF SERVICE REQUESTED X RESEARCH/DEV TRANSFER OF GRANT OTHER GOVT. (specify if REPAIR MAINTENANCE MODIFICATION STER ITV sc 0 s c SC CONTRACT 6 TASK ORDER NO. (if FUNDS TO ACIEHCY applicable) TECHNICAL INSPECTION IS REQUIRED SY 71RECEIVING OEPOT T Q I E:1 TECHNICAL MONITOR riITEMS TO SE PICKED UP ORE: SERVICES PER r0 *urn AT! ITEMS TO SE REDELIVERED TO: CONTRACT CLASSIFICATION SECRET WORK CLASSIFICATION SECRET HARDWARE CLASSIFICATION SECRET REPORTS CLASSIFICATION SHORT SUBSTANTIVE TITLE AND/OR DESCRIPTION OF SERVICE TO BE PERFORMED Closeout of MDAC Contract Total Closeout Cost After Negotiation $188,700.00 SECRET (See reverse for specific ipformstion reouired on R&D requests ) DESIGNATION D/SA 14 DOM Ex.Dir.-Compt. AprROVAL ,11-matti0E PROCUREMENT DIVISION USE DATE RECEIVED IN PD IRECOROED BY SECTION ASSIGNED TO NEGOTIATOR DATE 25 JAN 1972 n FORM 9uwI 2420 AND 2416 REPLACES FORMS UNCLASSIFIED 1-1 CONFIDENTIAL 071 ET El _ (specify) 3.67 'L-r" F-1 WOICN MAY BE USER. Approved for Release: 2020/02/11 CO2103240 1.1111 cApproved for Release: 2020/02/11 CO2103240,--in " �--- "" ATTACHMENTS OR STATEMENTS KA ET I. JUSTIFICATION FOR SOURCE SELECTION ' ('� storage. N/A 2. PROPOSAL 3. DELIVERABLE ITEMS REPORTS REQUIRED NO. OF COPIES El MONTHLY E] INTERIM ni QUARTERLY E.:SPINAL HARDWARE (state type and number) OTHER All Program Documentation -11 : 1".". f: All GFE and Contract IP urchased Equipment 4. GFE REQUIRED' None 5. SPECIAL INSTRUCTIONS All Program assets, hardware, documentation, GFE, etc. at contractor's Huntington Beach facility will be packaged and shipped to Area 51 for semi-permanent E=1 UNCLASSIFIED El CONFIDENTIAL _ FX)1 $ ET ED � Approved for Release: 2020/02/11 CO2103240 7 1 ( 9443 72 Approved for Release: 2020/02/T1 9 6 E021 03240 � Copy 1.{J � -- I+ f. I- t. Ft PC D T) Or 17 ICE RECEIVED RELEASED DATE TIME SEEN BY SIGNATURE DATE TIME NAME a OFFICE SYMBOL 0 DC!. '.,./ .,./ 1 :1/ '� .. _ Handle Via Indicated Controls N, h� t E Access to this document will be restricted to those persons cleared for the specific projects; WARNING This document contains information affecting the national security of the United States within the meaning of the espionage lows U. S. Code Title 18, Sections 793 arid 794. The law prohibits its transmission or the revelation of its contents in any manner to an unauthorized person, as well as its use in any manner prejudicial to the sofety or interest of the United States or for the benefit of any foreign government to the detriment of the United Stotes, It is to be seen only by personnel especially indoctrinated and authorized to receive information in the designated control channels. Its security must be maintained in accordance with regulations pertaining to BY IMAN Control System. Top CRET ATE � //////71///f/f/ //1/1 /71/ //V/ 17.11/ " " r e 1,0 / � //e / � , -"77=7-7.4:1;MX07"."4";r7- wits717.74:vw. -771'fw"r7r."'--`-""77727:9'"'":�7 "7- - - Approved for Release: 2020/02/11 CO2103240 / C., Art& Approved for Release: 2020/02/11 002103240 ri ITB -Li ...... - ----- BYE-6507-:71 Copy MEMORANDUM FOR: Director of Central Intelligence SUBJECT: Termination of Project AQUILINE 1. You will recall that following my preliminary report to you on the status of AQUILINE, you gave me guidance to terminate the program because of the high costs needed in FY 72 and 73 to reach operational readiness. We have completed our study of how termination might best be accomplished, and this memorandum defines two options for your consideration. My recommendation is contained in paragraph 4. 2. Option I provides for the immediate termination of the project and storage of all assets. Under this option, there would be no further expenditures of funds , for aircraft construction, testing, final reports or ror;tm documentation. It will take about two months 1 to implement this option. An additional $ would allow full program and technical documentation to be accomplished during the termination period, which would provide the basis for reactivation and use at some later date by this or some other organization. Under the origin .1 contract, MDAC is also due approximately $ for paymen of incentives on that contract Therefore, the total cost of this optio be $ or, if program documentLAio-A is desired, $ 3. Option II would provide for a four months' termination period and would cost about more than Option I. During this period several flight tests would be conducted using the in-plant test facilities and field test assets now in being. It would also provide full technical documentation. The flight tests would be conducted at Area 51 over a test range instrumented with Simulated Soviet air defense radars to define radar detectability and with observers and sensors, to determine !ANDLF VA BYFMAN CONTROL SY13TETA ONLY _Approved for Release: 2020/02/11 002103240 Approved for Release: 2020/0/11 CO2103240 irk visual and aural detectability. Additionally thee tests would give us a better understandin of some of the more important technology such as navigation and command control. I feel sure we will want to use some of these developed items in other Agency programs. 4. I would like to put the AQUILINE technology on the "shelf" in a way that would satisfy us all that we have tied all the Those ends together and have made it available for confident assessment for future uses I therefore recommend Option II. We had budgeted $ for the program this year, of which $ remains uno igated. 5. This recommendation for termination would rot be complete without reference to the fact that we still have an important need for a technique for deep penetration for covert emplacement and technical intelligence collection. We therefore would like to continue to explore ways to exploit some of the AQUILINE technology and other system concepts for using this technology. With your permission, we will from time to time be proposing the expenditure of relatively small amounts of money in these areas. Carl E. Dudkett Deputy Director for Science and Te(Ainology c. 74 'ZJ /-1Lct HANDLE VIA BYEIVIAN CONTROL- SYSTEM ONLY 2 ' r -2 1-1,- 7/ _Approved for Release: 2020/02/11 CO2103240 MIIALTIMCNI 1.1 LU DTC�r443/Z ri/COApproved for Release: 2020/02/11 CO2103240kheiuricsi ccintl,A,31,41, , Subject: Reference: Dear Sir: C r i..:,�:). ', .-*J 5301 Balsa Avenue, Huntington [truth, CA 92647 (7141 89G.3371 titk h 0 ij .- .---J U 1....., U ',..1 Li --4 NOV 2.1 1971 CONTRACT FIRII CPFF PROPOSAL FOR PRUGRAH CLCSEJUT r r") Pursuant ta prior discussions with the Contracting Officer and in reply to reference TWX, the Contractor is transmitting herewith his firm CPFF proposal covering closeout activi , ubjact Contract. This proposal consists of an estimated cost of . Details of this proposal are cont:-.id in the enclosure. The ContrEl.:.ter has prepared this proposal assuming it is additive to the baselire ;,quiline Program effort which was concluded on 12 NovEnLer 1971. Clos&eut ilctivities were initiated, per Customer direction, on 15 Novpm:,er 1v71. CMC:pr Lhclosura as noted cc: 1�;!-91,1F,11614 AITI.CTViG ThE �t 1:Ni ITC) STA11-S 11,11P,Iti LAOS. TITLE 18. I A^0-) Pi T. MC rr,-:,r�-:;,r,:oN if/ :;y 10 A N � {,N, r8r1.1,1;i'LD Cr LAW. Contracts-Program Control Special Programs w/Lnclosure DOCUMEN I CON IF,!01._ e- (:::py GROUP 1 _ rx(-3..uoco mum Adioml IC; nirc tm,ru r: 1,,LisaGt_1o4N.-� DOWNUADING AND Approved for Release: 2020/02/11 002103240 -Approved for Release: 2020/02/11 CO2103240! .iovemlier P.J71 ) ' FIRM CPU PoPoSAL FOR PROGRAM CLOSEOUT Prepared Under Contract Number By McDonnell Douglas Astr. .autics Company Western Division McDonnell Douglas Corporation Huntington Beacn, California McDonnell Douglas Corporation Proprietary Data Furnished In Confidence And Subject To Exemption Under Subsection (b) bUSCbb?_. JDo Not Disclose Outside Recipient Organization Ana U. S. Government. Approved for Release: 2020/02/11 CO2103240 � Approved for Release: 2020/02/11 CO2103240 N�. CONTENTS SECTION 1 INTRODUCTION SECTION 2 ASSUNPTIONS AND CONDITIAS SECTION 3 hOUk/DOLLAR SUNOARY SECTION 4 COST PROPOSAL Page 1-1 2-1 3-1 4-1 4.1 Engineering 4-2 4.2 Operations 4-2 4.3 Uuards 4-2 4.4 Document Control Clerk 4-2 4.5 Material 4-3 4.5.1 EDO Material 4-3 4.5.2 Reproduction Material 4-3 4.6.3 Major Subcontracts 4-3 4.b Travel and Per Diem A-4 4.7 Pricing Cost Breakdown 4-5 Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 j) it EVI Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 e C, 1-3 Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 rtit 2-1 Approved for Release: 2020/02/11 CO2103240 Approved for Release7--2020/02/11 CO2103240 - � a 3-1 i �-T Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 SECTREi 4 CUST PROPOSAL Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 4-Z Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 4-3 x L Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 4-4 Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/1i CO2103240 ' Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240 Approved for Release: 2020/02/11 CO2103240