SUBMARINE PROJECTS AT <SANITIZED>

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
0005508948
Release Decision: 
RIPPUB
Original Classification: 
U
Document Page Count: 
4
Document Creation Date: 
June 19, 2017
Document Release Date: 
June 19, 2017
Sequence Number: 
Case Number: 
SC-2007-00006
Publication Date: 
December 10, 1984
File: 
AttachmentSize
PDF icon DOC_0005508948.pdf132.84 KB
Body: 
Approved for Release: 2017/06/16 C05508948 ---ZirseeRc4? CM0aliMdtMCCAgeMy Washingon,D.0 20505 MEMORANDUM FOR: Director of Central Intelligence SUBJECT Submarine Projects at APPROVED FOR RELEASE CIA HISTORICAL RELEASE PROGRAM JUNE 2017 AR 70-14 1 0 DEC 1984 1. This report contains informatAnn_omim_h_P?r?of Soviet submarine projects constructed at including code names, project numbers, and production and dimensional data. There is also a brief description of how anechoic coatings are applied to a submarine's hull. 2. Because the source of this report is extremely sensitive, this document should be handled on a strict need-to-know basis within recipient agencies. eorge Deputy D ector for Operations CAR A TS #848263 Copy #.2. -TorIECRE.1_, Approved for Release: 2017/06/16 C05508948 Approved for Release: 2017/06/16 C05508948 -2- Distribution: Director Director of Central Intelligence Director of Intelligence and Research Department of State Director, Defense Intelligence Agency Director of Naval Intelligence Department of the Navy Director, National Security Agency Deputy Director of Central Intelligence Deputy Director for Intelligence Deputy Director for Science and Technology Director of Soviet Analysis Director of Imagery Analysis TS #848263 Copy #;;? "Tor-r,F4R.Lr Approved for Release: 2017/06/16 C05508948 Approved for Release: 2017/06/16 C05508948 ?TOP?SECREL COUNTRY USSR DATE OF INFO. October 1984 -3- Intelligence Information Special Report SUBJECT Submarine Projects at DATE 1 0 DEC 1984 SOURCE A Soviet 1. The first titanium submarine from the new BARRACUDA project was launched in the summer of 1983. 2. The following submarine construction projects were among those handled by the Project 670 SKAT, Project 670M CHAYKA, Project 641B SOM, Project RT SYEMGA, and Project 877 VARSHAVYANKA. a. Project 670 [CHARLIE-I-class SSGN], code name SKAT IRAY]--Construction began circa 1960 and ended in 1972 with a total of 11 hulls. The main hull has a diameter of nine meters, a hull thickness of 25-40 millimeters, a distance between frames of 50-60 centimeters and a length of 75 meters. AK-29 steel is used in the hull. The SKAT has a nuclear propulsion system and two supplementary water propellers. Construction of a modernized version of the submarine began in 1969. b. Project 670M [CHARLIE-II-class SSCN], code name CHAYKA [SEAGULL1--The CHAYKA is distinguished from SKAT by its larger dimensions. Its pressure hull length is 80 meters and the submarine is larger by one compartment than the SKAT. Construction ended in 1980. -1t1P--5ECl/LT TS #848263 Copy #a.. Approved for Release: 2017/06/16 C05508948 Approved for Release: 2017/06/16 C05508948 -"Tarteegra..... -4- c. Project 641B [TANGO-class SS], code name SON [CATFISH]--Construction began in 1968 and ended in 1980 with a total of 12 hulls. The main hull has a diameter of seven to eight meters, a hull thickness of 25-30 milli- meters, a distance between frames of 50 centimeters, and a length of 85 meters. AK-25 steel is used in the hull. This class of submarine has a diesel propulsion system. d. Project RT [VICTOR-II-class SSN], code name SYEMGA [SALMON]--Construction began in 1969 and ended around 1973 with a total production of three or four hulls. The main hull has a diameter of ten meters, a hull thickness of 30- 40 millimeters, a distance between frames of 60 centimeters and a length of 110 meters. AK-29 steel is used in the hull and the propulsion system is nuclear. e. Project 877 [KILO-class SS], code name VARSHAVYANKA 1WARSAVITE1--This project has been under construction since 1981. One submarine was launched on 2 March 1984 and the launching of the second hull is expected to occur in late October 1984. The main hull has a diameter of eight meters, a hull thickness of 24-30 millimeters, a distance between frames of 60 centimeters and a length of 85 meters. AK-25 steel is used in the hull. The VARSHAVYANKA has a diesel propulsion system. Comment: The second KILO unit launched from was detected on 18 Novem 4 at It probably departed late October to reach the Black Sea by mid- November 3. Projects 670, 670M, 641B, SYEMGA and 877 have a rubber coating. In areas where there is considerable noise, the hull is coated with thicker rubber, up to 70 millimeters thick. Before the coating is applied to the hull, the metal is cleaned until it shines. It is then covered with mastic which is followed by the rubber coating. The rubber is compressed by special cylinders and held under pressure for 72-96 hours. Afterward the seams and grooves on the coating are sealed with liquid rubber. To improve anechoic properties, the coating is made porous. .---1151"-SECBS.:_sf Approved for Release: 2017/06/16 C05508948 IS #848263 Copy #.2.