STATUS REPORT JULY 1969

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79B00873A001400010008-1
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
59
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 24, 2012
Sequence Number: 
8
Case Number: 
Publication Date: 
August 3, 1969
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79B00873A001400010008-1.pdf1.14 MB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 VP'i C 0?y I 03 s... Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 STATUS REPORT for Period 1 JULY through 31 JULY 1969 Submitted under Contract to U. S. Government File No. 11038 STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 STAT et, Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 7 , 7 '71 k= fl This document is presented as the Monthly Status Report under Contract to the U. S. Government, ? The report period represented herein covers the period 1 July through 31 July, 1969. 1=' Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 STAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 r- i=1 t=1 Program Status Task 1 INDEX Page Summary Statements of Work, Specifications, Report Preparation 1 Ti - 1 Task 2 Scheduling and Planning T2 - 1 Task 3 Test and Inspection Procedures T3 - 1 Task 4 Management, Administration and Supervision T4 - 1 Task 5 Meetings T5 - 1 Task 6 Facilities Requirements T6 - 1 Task 7 Main Frame T7 - 1 Task 8 Skin T8 - 1 Task 9 Granite and Ways Assembly for Stages T9 - 1 Task 10 Air Bearings T10 - 1 Task 11 Stage Drives T11 - 1 Task 12 Film Drives T12 - 1 Task 13 Film Platen T13 - 1 Task 14 Film Cooling T14 - 1 Tasks 16, 17 & 18 Optics T16,17 & 18 Task 20 General Platen Illumination T20 - 1 Task 21 Optical Bridge T21 - 1 Task 22 Interferometer Assembly T22 - 1 Task 23 Optics Drives T23 - 1 Task 24 Image Analysis System T24 - 1 Task 26 Digitizing Logic T26 - 1 Task 27 Metric Readout T27 - 1 Task 28 Output Logic and Interface T28 - 1 Task 29 Cabling T29 - 1 Task 30 Control Console and Chair T30 - 1 Task 32 Computer T32 - 1 Task 33 Electronic Racks and Control Cabinets T33 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Index (cont'd) Page Task 34 Utilities, Vacuum and Air Systems T34 - 1 Task 35 Vibration Absorption and Leveling T35 - 1 Task 36 Overall Assembly T36 - 1 Task 37 R.F.I. Suppression T37 - 1 Task 38 Environmental Control T38 - 1 Task 39 Reliability Analysis T39 - 1 Task 40 Installation T40 - 1 Task 42 Breadboards and Test Services T42 - 1 Task 43 Computer Programming and Services T43 - 1 Task 44 Preacceptance Test in Fabrication Plant T44 - 1 Task 45 Acceptance Test in Fabrication Plant T45 - 1 Task 46 Acceptance Test after Installation T46 - 1 Task 47 Instruction Manuals T47 - 1 Task 48 Spare Parts Lists T48 - 1 Task 49 Operator Training T49 - 1 i i ii Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 APPENDICES ri)rogress Report - for period ending June 30, 1969 Appendix I S TAT ' Progress Report - for period STAT ending June 30, 1969 Appendix II lit Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 '73 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 1=, PROGRAM SUMMARY Scheduled Percentage of Completion 71.2% Actual Percentage this Date 65.3% There have been no significant completed activities during the month of July. The work has been proceeding on schedule fl with particular reference to assembly of the stage utilities and the C:2 checkout of the electronics as an integrated system. All aspects of the Stereocomparator project are proceeding in a manner fully compatible with the requirements of the program. I=1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 "21 i= Task 1 Statements of Work, Specifications, Report Preparation Scheduled percentage of completion 74% Actual percentage this date 74% No new specifications were developed or issued during this report period. Monthly reports from our subcontractors are incorporated into this document under appropriate task headings or in the Appendix. Ti - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 0 0 0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 2 Scheduling and Planning month. Scheduled percentage of completion Actual percentage this date 74% 74% No change in schedule has been made during the The optical vendor's schedule has been brought up-to-date and indicates that the equipment will be provided for testing, at the plant, by December 15, 1969. T2 - 1 ES TAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 .?; Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 1=1 C=1 Task 3 Test and Inspection Procedures Scheduled percentage of completion 61% Actual percentage this date 53% All test targets and photography, for the use of the optical and correlation vendors, have been delivered to the vendors. Work is proceeding on the development of the detailed test procedures utilizing the targets and photography. T3 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 1= 171 CM CI Task 04 Management, Administration and Supervision Scheduled percentage of completion 74% Actual percentage this date 74% Management and administrative functions are proceeding normally with no major departures from the original Management plan. T4 - 1 1= Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 ? Ca Task 5 Meetings Scheduled percentage of completion 74% Actual percentage of completion 74% Meetings were held with customer representatives the week of July 7th and the week of July 14th. During these periods, the computer programing details and the equipment installation environment were discussed. In addition, dirt particle counts were made on the Clean Room supply air and in the room during its periods of activity and inactivity. It appeared that the Clean Room system was compatible with the requirements of the Stereocomparator. However, special cleaning of all surfaces of the room were indicated to maintain a suitable condition during work activity. T5 - 1 STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 6 Facilities Requirements Scheduled percentage of completion Actual percentage this date The ? 98% 90% Clean Room is in operation with respect to STAT the work area in the room and the electronic cabinet air systems. The temperature control for these two systems failed due to control instrument defects and replacement parts are being provided by the vendor. It is hoped that the temperature controls will be back in operation by the end of July. T6 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 i= Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 k= r- ?=i Task 7 Main Frame and Structural Elements Scheduled percentage of completion 98% Actual percentage this date 93% The main frame for the Stereocomparator was completed in September 1968. No additional work will be scheduled for this Task until the return of the Optical Bridge by the optics sub- contractor. T7 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 1=7 1=S t=i 1=, fl ict Task 8 Skin Scheduled percentage of completion 44% Actual percentage this date 30% The fabrication of the external skin sections has been completed to the point where the total assembly is needed in order to finish this Task. No further work is anticipated until the Stereocomparator has been completely assembled. T8 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 9 Granite and Ways Assembly for Stage this time. Scheduled percentage of completion 98% Actual percentage this date 98% No further work is anticipated on this Task at T9 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 E 1 p=i 41=1 Task 10 Air Bearings Scheduled percentage of completion Actual percentage this date 98% 92% As previously reported, the air bearings were installed on both stages in February. No further work will be scheduled until the utility cabinet is completed, following which the bearings will be tested with the interferometers. T10 - 1 1-7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24 : CIA-RDP79B00873A001400010008-1 ine$ 6=1 1=1 i=1 fl Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task. 11 Stage Drives Scheduled percentage of completion 98% Actual percentage this date 70% Installation of the stage drive assemblies on the right and left hand stages was completed during the month of June. Testing of the assemblies will be conducted after the utilities cabinet has been completed. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 L Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 12 Film Drive and Transport System Scheduled percentage of completion 86% Actual completion this date 70% The wiring for the film drive and transport system has been partially completed. The left stage film drive wiring is complete. After completion of the wiring systems, servo compensation of these units can proceed. T12 - 1 I=1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 =71i L:3 tzsl Task 13 Film Platen and Film Clamping Scheduled percentage of completion 98% Actual percentage this date 88% The film clamping and film platen assemblies are awaiting dynamic testing pending completion of the air relay logic wiring. begun. The wiring for the modified air control system has T13 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 =;1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 14 Film Cooling Scheduled percentage of completion 93% Actual percentage this date 60% There will be no further work on Film Cooling until the optical system arrives. T14 - 1 E:2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Tasks 16, 17 and 18 Viewing Optics, Viewing Illumination, Reticle Projector and Illumination Scheduled percentage of completion 91% Actual percentage this date 86% ? The work of integrating the supplied optical STAT drive equipment continued. with the vendor's supplied optical systems was has sent to approximately 95% of the STAT servo components for installation in the STAT optical bridge. is also performing the necessary wiring and cabling work involved In the installation. has scheduled assembly and test activities STAT during their regular August annual vacation and the be in their plant during this period. T16, 17 & 18 - 1 monitor will c' Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 STAT I L, Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 20 General Platen Illumination Scheduled percentage of completion 98% Actual percentage this date 70% The platen illumination equipment has been installed on the Stereocomparator and will be tested on the machine when its wiring is complete. The units were previously bench tested and performed satisfactorily. T20 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 . Jn f=i Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 21 Optical Bridge and Supports Scheduled percentage of completion 96% Actual percentage this date 90% No further work is scheduled until receipt of optics from subcontractor. T21 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Y=1 k,d Task 22 Interferometer Assembly Scheduled percentage of completion 84% Actual percentage this date 68% Concern exists regarding the laser interferometer return beam effecting the cavity servo control on the laser. A report was prepared concerning this problem. STAT In addition, a polaroid and quarter wave plate sandwich has been received and will be tried out as a means of minimizing the effects of the laser on the return beam. Tests cannot be performed on the interferometer until the temperature control system is performing to the proper specifications, (see Task 6). T22 - 1 STAT 1=1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 fl I=1 Task 23 Optics Drive Assembly Scheduled percentage of completion 84% Actual percentage this date 80% The main optics drive assembly tests were completed during this report period. The simulated optics systems were driven by the computer, the A/D - D/A converters, and the computer inter- face circuitry. The entire system displayed an accuracy of 1 bit. The crosstalk and noise present was not sufficient to cause a, 1 bit change. The slaved and non-servo optics drives tests were started and should be completed during the next report period. The automatic brightness control loop computer model was completed and it is now in the fabrication stage. ?T23- 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 24 Image Analysis System Scheduled percentage of completion 78% Actual percentage this date 90% Progress on this task is detailed in Progress STAT Report for the period ending June 30, 1969, which is included as Appendix I to this report. The date for acceptance testing of this system is tentatively scheduled for the week of August 18 or August 25. T24 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 0. 0 Lu 0 0 0. Task 26 Digitizing Logic Subassembly Scheduled percentage of completion 98% Actual percentage this date -93% This Task is now covered under the discussion in Task 28 - Output Logic and Interfaces. Please refer to this Task. T2'6 - Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 t=t Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 b=J r7 Task 27 Metric Readout Scheduled percentage of completion 98% Actual percentage this date 95% This Task is now covered under the Output Logic and Interfaces, Task 28. Please refer to this Task for a progress report. T27 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 28 Output Logic and Interface Scheduled percentage of completion 98% Actual percentage this date 85% The tests of the computer interface and AD/DA converters, which was done for a simulated optics drive test, was completed. A test of the film and stage drive logic and metric readout has begun. T28 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 k=; Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 -21 fl Task 29 Cabling Scheduled percentage of completion 98% Actual percentage this date 96% Additional manufacture and checkout of cables was done during the last report period. T29 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 30 Control Console and Chair Scheduled percentage of completion 97% Actual percentage of completion 85% The checkout and testing ofthe console and its associated interface circuitry continued during this last month. This includes testing of the manual optical controls and readout digits as well as the function control pushbuttons. The IBM 526 punch will be used to aid in the testing of the readout characters which will begin next month. T30 - I Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 32 Computer Scheduled percentage of completion 98% Actual percentage this date 95% . No new work was done to the computer circuitry during this last report period since the computer is already installed and working. T32 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 i0 0 Declassified Task 33 Electronic Racks and Control Cabinets Scheduled percentage of completion 98% Actual percentage this date 90% The internal cables in the electronic racks were installed and harnessed. T33 - 1 in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 t=7, Task 34 Utilities, Vacuum and Air Systems fl Scheduled percentage of completion 87% Actual percentage this date 80% The electrical wiring for the valves, pressure switches and air control solenoids was begun during this report period. T34 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 .1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 PI ? 1=1 Task 35 Vibration Absorption and Leveling , Scheduled percentage of completion 90% Actual percentage this date 85% No further work is scheduled for this Task until the Optical Bridge is received from At this time, full tests of response time and stage deflection will be conducted. This delay is necessitated by the requirement for full weight loading of the stages during these tests. T35 - 1 STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 rj Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 36 Overall Assembly Scheduled percentage of completion 62% ?=i Actual percentage this date 38% ? 1 C = 7 = 7_7 Work is continuing on the mechanical assembly of the stages with respect to the vacuum, air and wiring facilities. The electrical cable connection panel and air bearing air connection panel is being installed in the rear of the Stereo- comparator. The electronic assembly work was essentially completed previous to this month and the work currently consists of checkout and testing of the many subassemblies as an integrated System. T36 - 1 c=1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 I Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 o Task 37 Radio Frequency Noise Suppression month of July. 0. 0 .0 Scheduled percentage of completion . Actual percentage this date No work was scheduled on this Task for the ? Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 38 Environmental Control Scheduled percentage of completion 83% Actual percentage this date 89% Meetings were held with the customer site prepara- tion consultant with special reference to the film cooling air system. This equipment has been designed and is ready for fabrication as part of the site preparation. The device appears to be fully compatible with the needs of the Stereocomparator. T38 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 39 Reliability Analysis of July. Scheduled percentage of completion 17% Actual percentage this date No work was scheduled on this Task for the month T39 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 40 Installation Scheduled percentage of completion Actual percentage this date 18% No work was scheduled or performed on this task T40 - 1 STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 i= Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 szml 7 Task 42 Breadboards and Test Devices Scheduled percentage of completion 65% Actual percentage this date 55% The servo compensation and performance tests were completed during this report period (see Task 23). The servo breadboards have been disassembled and the required components have been shipped The remaining testing of the tracking program can be done without the breadboards. T42 - 1 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 43 Computer Programming and Services Scheduled percentage of completion Actual percentage this date 89% 70% progress report for the period June 1 to June 30, 1969, is included as Appendix II to this report. Informatics' computer programming personnel was included in the meetings between STAT nd the customer concerning STAT the review of the computer program concepts for the Stereocomparator. T43 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 : Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 44 Preacceptance Test in Fabrication Plant month of July. Scheduled percentage of completion Actual percentage this date 0% No work was scheduled for this Task for the T44 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 45 Acceptance Test in Fabrication Plant month of July. Scheduled percentage of completion Actual percentage this date No work was scheduled for this Task for the T45 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 46 Acceptance Test After Installation of July. Scheduled percentage of completion 0% Actual percentage this date 0% No work was scheduled on this Task for the month T46 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 I Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 r=! r=1 Task 47 Instruction Manual and Drawing Submittal Scheduled percentage of completion 59% Actual percentage this date 27% The revision of the design drawings to cover the "as built" status of the various subassemblies of the Stereocomparator is proceeding according to schedule. T47- 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Task 48 Spare Parts List Scheduled percentage of completion 39% Actual percentage this date 50% An addendum to the Spare Parts List has been completed. This updates the Spare Parts List through this report period. The anticipated life and replacement time of the spares is presently being computed. T48 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 C=11 fl Task 49 Operator Training Scheduled percentage of completion 40% Actual percentage this date 70% During July, the first 80% of the Operator Training Manual was delivered to the customer for their review. ? Some preliminary discussions were held relative to the sending of customer representatives to or orientation with respect to the actual operation and the computer programing aspects of the Stereocomparator. It is indicated that, at about the end of 1969, the Stereocomparator would be sufficiently complete :to make an operat- ing review (operator training program) of the equipment feasible. This problem is thus not critical at this time. However, as the completion date approaches, the necessity for planning for customer orientation is apparent. T49 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Do 0 0 n kit.) D Declassified in in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 PROGRESS REPORT FOR PERIOD ENDING 30 JUNE 1969 1.0 PROGRESS DURING REPORTING PERIOD The test fixture support was redone using black anodized 3/8 inch aluminum tool plate. The fixture was reassembled with new gussetts and shock mounting on the blower assembly. The fixture is more rigid and durable with no noticable vibration. The plywood support was discarded. Preacceptance testing was started in June. This phase of the pro- ject is used to correct wiring difficulties and to affect circuit adjustments and changes which enable the system to perform to speci- fications. As a Quality Assurance measure, the test equipment used during this phase was sent out for calibration. The untimeliness of this procedure, however, caused some delays in testing. A suitable illumination meter was detained until 8 July in the process. The S20 image dissector tubes required rewiring because of dissimilar socket connections and additional voltage requirements over the Sll tubes. Mutual coupling effects from the 77 foot cable runs made it necessary to modify the circuit boards in the image dissector.astemblies to accommodate bypass capacitors on the power supply lines and resistive bias dividers. Decoupling was extended to both modules in each video amplifier. The Reynolds Industries high voltage cable assemblies broke down after a short period of relatively normal use. The cables were purchased with certification of high-potential testing and not sub- jected to unusual stress, which might destroy their high-voltage integrity. Three of the four cables developed leakage in excess of STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 f=1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 ?E fl 500 microamperes at voltages under 500 volts (as indicated on an Associated Research Inc, Hypot Junior meter). Arcing at low voltages was also observed at the connectors. The Reynolds cable assemblies will be replaced with RG 142 B/U which has a .116" core diameter as opposed to the .050" diameter of Reynolds "L" cable. Both cores are teflon (FEP). AMP connectors type 10-M-3000 panel, type 101-M-3800-75 bulkhead, and type 101-11-1800 cable connector will be used. Cable drawings will be revised and cutout dimensions forwarded at a later date. Limited testing and debugging continue with temporary high voltage lines. Since the image dissector assemblies are being tested without their housings, an open frame fixture is used. Proper alignment to make final derminations and adjustments cannot be maintained until permanent connections make the use of the test fixture possible. Notations of wiring and component changes are being maintained. However, drawings will not be updated until the tests are complete. 2.0 PLANS FOR NEXT PERIOD Preacceptance testing will continue: acceptance testing is currently projected to the last week of August. Percentage of job completed to date - 90%. STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 1:1 pc) Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 fl MONTHLY PROGRESS REPORT June,' 1 9 69 This technical report is for the reporting period from June 1 to June 3 1969. The report is prepared according to STAT Specification number DB1001 (as modified). 1. At the end of the month, subroutines a. CONVRT b. DATAIN c. PARMOD d. SCANER e. FID f. TTIN g. TTIC and h. RECIN _were checked out and documented. During the month, these routines underwent considerable redesign. As a result, the function of subroutine TBSRCH has been incorpor- ated into PARMOD itself. Also, subroutine NOCAM's function has been assumed by EXEC1. A new entry ASCDEC has been coded into subroutine ASC BIN. While ASCBIN decodes ASCII to floating point, ASCDEC decodes ASCII to fixed point binary. Although a system tape has been created for the real time program, il it has been used very little because work on the computer interface trj ?L. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 and D/A converters has not progressed sufficiently. With most of the redesign of the non-real time program behind us now.; work should soon begin proceeding at an encouraging rate. As of this reporting period, approximately 70% of the total contract work has been completed. 2. Next month, the redesign of the non-real time program will be com- pleted. Completion involves: a. Redesign of FIDZ and FID3. b. Modifications to EXECI to accommodate the many changes of its subordinates. c. Checkout of the stage initialization supervisor STAGIN. After completion of the redesign, the non-real time program will be integrated. It should be completely operational by the end of July. 3. At the end of May the problem of how to filter the crosstalk out of the correlator had not yet been resolved. This has a low priority because it is not really clear that crosstalk will even be a problem. 4; At the time of this writing the contract extensions is in the final stage of negotiation. will be transmitting two signed copies of the agreement before the end of July. will continue working second shift through the second week of August. After that it has been agreed that he will return to day shift for the duration of the contract. 6. No changes or agreements have been made requiring the contracting officer's approval. SISTAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 , ? fl 7. No other unresolved matters are known to exist. r- fl fl 171 '" Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Name b C ?V V CAMATS ,-01 R-c-B1:1\3 CONVRT . 1 CVB CVF ) t/e DATAIN t VI EXEC I EXEC 2 , ), ? . E7X-14.44. -14-----L---4H-S?S 1 i i V7 Vi FID I : ,,,/ ? 1 1 ? /I FID 2 / I FIXR V1 GTP 1 V I' LS TC /Ps ET : v v" ',/ MATMAK v")--MSGIN : ?7 '-vIM'MSGOUT , V 7 VI. MTS ALPHABETICAL SUBPROGRAM INDEX General Subprogram Flow Diagram Page 8 Page No. 118-123 44 130,131 132,133 27-31 17-19 20-25 152 56-58 59-62 157,158 80-82 145,146 127-129- 147,148 149151 100-104 I ,z4/ ,AARMOD 32-35 P S ET Declassified in Part - Sanitized Copy Approved / Name Page No. c vl PTOP 105-111 it RDOP 140-142 '' RDST 143,144 RECALL 66-68 RECIN 45,46 REORT 83-88 SCANER 39,40 STAGIN 49-55 TIC T 1347136 TICX 137-139 ,,' TMAT 89-99 TRK 69-79 , TTIC 63765 TTIN 47,48 T 2 PAN XMX I YMR 112-115 124-126 116,117 for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 tiDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1