CONSTRUCTION OF SOVIET TYPE IIIA ICBM LAUNCH SITES

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05439A000300370065-1
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
19
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 20, 2012
Sequence Number: 
65
Case Number: 
Publication Date: 
May 1, 1964
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05439A000300370065-1.pdf996.91 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 R Next 4 Page(s) In Document Denied Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 ILLEGIB 3 0 -MAR-1 9 9 9 14:26 ScreenScan Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 PHOTOCRAPHIC PORT , TRUCTION OF SOVIET TYPE ICBM LAUNCH SITE CIA Df4 NATO_ PHOTOGRAPHIC NTERPRET AflC4 CENTER. TOP SCRE 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 TOP SECRET RUFF PHOTOGRAPHIC INTERPRETATION REPORT CONSTRUCTION OF SOVIET TYPE ITIA ICBM LAUNCH SITES NP IC/R-331 /64 May 1964 NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER ?111, TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/08/20 ? CIA-RDP78T05439A000300370065-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 TOP SECRET RUFF INTRODUCTION A detailed photographic study has been made of Soviet Type IIIA hard ICBM launch sites observed on large-scale photography from ' Mission 4006. This report is based on a re- - quirement for extensive detailed information on construction practices, methods of operation, degree of hardness, and similar items. The ten sites studied included those in a midst-age of construction and those that have been completed for some time. It was not pos- NPIC/R-331/64 sible to provide data on seirne impbrfahrfeatures such as the thickness of silo covers, diameter of tanks, and details of a typical spray pond. The photography did not provide many additional details of construction within a site under con- struction, because of quality or lack of stereo coverage. CO-nclusitins regarding the facilities srnd the various stages of construction at Type IIIA sites are given at the end of the report. MENSURATION DATA Some of the more significant mensuration data are listed below. Additional measurements are included in the graphics and textual descrip- tions for specific launch sites. The separation of the silos at t e comp e e sites z had a variation with an average separation The variation in separation of silos under construc- tion was 15 feet, with an average separation The rectangular silo covers measure The square pad-like areas adjacent to the left edge of the covers are 20 by 20 feet. The, small structure adjacent to the rear of the rear pad-like area varies in measure- A number of measurements were made of the inside diameter of the open silo at Launch Area F at Verkhnvaya Saida and the most consistent figure obtained The edges of the light-toned wall or collar around t-he top of the silo are difficult to determine but it appears to rrhe cover fits' a rectan- gular enclosure around this silo that has an The construction ramps observed at Launch Areas E and F at Drovyanava varied in measure- ment from 110 to 120 feet in length and are about 20 feet wide. The width of the probable passageways constructed at Launch Areas B and C at Olov- yannilya, and Launch Area E at Drovyanaya, ranged SITES IN ,THE MIDSTAGE OF CONSTRUCTION LAUNCH AREA E, DROVYANAYA Excellent photography of this midstage of .construction (Figure many details previously not seen, but the lack of stereo coverage hampers interpretation. The site in the three silos are under construction, with ramps 1) reveal_ extending out over the excavation. A square - 1 - TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/08/20 CIA-RDP78T05439A0003nol7nn 25X1 25X1 25X1 25X1 ri6"X 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 ? TOP SECRET RUFF NP1C/R-331/64 ^ 101. ea.!. ? / ? -"C-- / \ ? PROBABLE BUILDING\ FOUNDA TIONS - - x It?CO- ?- UNIDENTIFIED AREA I I \/ I / \ fI / \ 4050 CONTROL BUNKER UNDER CONSTRUCTION SILO UNDER CONSTRUCTION ... ? ^ ;,:*6.7,?;. / RAMP INCLINED COVEY ER . ,?,---?35' X 55' / / SCARRING P- robable passageway , Probable passageway under construction Road: Traclvtrail Ditching Building under construction Unidentified objects . ?,,)).? Concrete arches Open storage eic Concrete rings ? Excavation Earth mound 200 0 200 400 5,00 FEET (A PPR OXIMA TE) . FIGURE 1. LAUNCI-TrAREA E, DROVYANAYA. TOP SECRET RUFF f=aPi C J-0072 (5/64) eclassified in Part Sanitized Copy Approved for Release 2012/08/20 ? CIA-RDP78T05439A000300370065-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 TOP SECRET RUFF framework or structure appears to arise from the bottom of the excavation around the silos. At the right- silt) - this "strutture appears to consist of three or four equal-sized sections around the silo. The two equipment bunkers between the -silos, approximately 80 by 50 feet, are under construction, with half of the bunkers roofed. Two inside walls in the unroofed half divide the bunkers into three S-ectiaiis ff"parallelin the long axis of the excavation'. The control bunker, about 135 by 95 feet, is under Construction with structural supports erected- for three of the _ Probable passageways are under construc- tion ,within the site. What appear to be large concrete rings observed outside the large ex- ; cavation : may be used for constructing these probable: passageways by placing them in a system of ditching around the Site. A probable passageway at the front of the site has been built between the center and right silos, with a seg- ment extending toward the right silo. A wide ditch for a probable passageway extends for some distance beyond the ends of the excavation, running the long axis of the excavation between _ the control bunker and the silos. A section of this probable passageway has been laid in the left end of the ditch which probably will connect to a system of ditches extending some distance to the rear of the launch site. This network of ditches, with an average and characterized by sharp turns, has small cutouts in the side at intervals suggesting provisions for expansion joints. The access road behind the control bunker has been cut by ditching in six praces. To the, left -of the control bunker is a large oval-shaped excavation about 370 by 95 fee, which may be for burying tanks. Two large scarred areas, with p.robable building founda- NPIC/R-331/64 tiogs, are northwest of the excavation. Numerous concrete arches, are stacked around these areas. Along the front of the excavatioh are three rows of small objects or foundations in scarred areas. Their locations and positions equate to those of three structures found later in the construction phase. There are about 20 various-sized buildings scattered around the site, and foundations are evident----for the construction of several more. One odd-shaped structure 235 by 55 feet is lo- cated about 2,400 feet south-southwest of the launch site. Jr is near one of the ditches from the launch site, and has an inclined conveyer extending upward from one end and a ramp at the other end. Three ramps ex- tend from one side of the building, and scarring is evident directly opposite these on the other side. LAUNCH AREA F, DROVYANAYA Launch Area F (Figure 2) is in the midstage of construction, somewhat behind that of Launch, Aec-a E. The lack of stereo coverage hampers identification and interpretation of construction details. The three silos are under construction, with ramps extending out over the extaN-iation. There appear to be square construction plat- forms at the ends of the ramps, with the silo itself in the center. This square area around the silo may have been built up from the bottom of the excavation at the center silo. Excavation for the equipment bunkers is evident between the silos. Some foundations for the control bunker have been laid in the notch of the excavation. A minor amount of ditching is apparent for lay- ing the probable passageways within the site. About 10 buildings of various sizes, some under construction, are scattered around the sit4with scarring and foundations for 'Several others. - 3 - TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 ? ? TOP SECRET RUFF NPIC/R-331/64 LAUNCH AREA B, OLOVYANNAYA 0 Launch Area B (Figure 3) is in the midstage of construction, with extensive 'activity within the excavation. Forms and structures are evident around the silos at the ends of the construction ramps, although the silos cannot be seen. The two equipment bunkers have been roofed and some backfilling has talen place along their forward sides; the backfilling also covers some of the probable passageway running the long axis of the front side Of c aCrrat ion T hepr ob able passageway running the long axis of the excava- tion between the control bunker and the silos is well along in construction. A deep notch in the excavation has been cut for the control bunker, and two walls of the bunker are. up with the others under construction. Two deep L-shaped ditches extend from the rear of the control bunker. A shallow irregular excavation left of the control bunker may be for the location of buried tanks. At least seven various-sized buildings, probably for construction support, are around the site.,_ ?One structure, approxi- 110' X BUILDING UNDER CONSTRUCTION 61:VX 35' 75'X 35' ? 111111 s ? ?/ ------ SILO NDER TRUC TION 55'X ? .91 FIGURE 2. LAUNCH AREA F, DR - 4 - NAYA. TOP SECRET RUFF 200 Road Track/trail Structures under construction Excavation Equipment bunker under construction 0 200 400 FEET (APPROXIMATE/ NPIC J-0073 1.3/ 641 Declassified in Part - Sanitized Copy Approved for Release 2012/08/20 ? CIA-RDP78T05439A0001nrn7nnAc 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 TOP SECRET RUFF NPIC YR33l/64 matelv 95 by 20 feet, is to the left front of the left silo at about a 45-degree angle to the long excavation. A possible pipeline parallels the acceSs road from the site support facility. LAUNCH AREA C, OLOVYANNAYA This launch site ("Figure 4) is in a slightly earlier stage of construction than Launch Area B. Construction ramps extend out over the excavation to the positions of the three silos. The actual silos, in various stages of construc- tion, are not apparent. At the position of the right silo there are structures and forms at the bottom of the excavation below the end of the construction ramp. Very little finished con- struction is evident around the positions of the other two silos. The walls are up for the equip- ment bunker between the right and center silos, but only the foundations are in for the other equipment bunker. Only portions of two walls of the control bunker have been constructed in the notch of the excavation. Probable passageways are under construc- tion throughout the site. The long one between the silos,and control bunker extends beyond the excavation, passes Linder the ?site loop road, and connects to an extensive system of ditch- ing. This ditching. with an average width of 10 feet and characterized by sharp turns, apparently will serve several different facilities SPOIL EMBANKMENT , BUNKER /C CONTROL / UNDER / CONSTRUCTION I 1 . I \ i \ P \ / \ UNIDENTIFIED , / \ \135 X 35 \ OBJEC // \ Ns I \ T \ ,77--- / 13 --___.! , \ 10,X 35' \ '1.? ? \ , \ .' `... Probable passageway Road Trail ? Ditch Excavation 100 0 100 200 300 400 .57 FEET 'APPROXIMATE SILO UNDER CONSTRUCTION aw POSSIBLE PIPELINE 3 POSSIBLE VEHICLES IMII.100' X 35' ? CONCRETE ARCHES TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 TOP SECRET RUFF NPIC/R-331 '64 within the launch area. The probable paiisageway under construction along the front side of the ' excavation appears to have segments branching off at right angles and extending between the right silo and the equipment hunker, and between the center silo and left equipment bunker. A shallow oval-shaped excavation to the left of the control bunker may be the future location of buried tanks. A possible pipeline extends from behind the left rear of the control bunker out to a small structure. There are at least 14 buildings and structures of various sizes, some under construction, around the perimeter of the launch. site LAUNCH AREA K, YURYA Dark photography obscures most of the details of construction within the site (Figure 5). Three light-toned, vague images appear at the points where the silos are under construction. The construction ramps to the silos are barely discernible. There appear to be excavations under the ramps around the forward side of the silos. The control bunker and one of the equip- ment bunkers are under construction. There is evidence of probable passageways being con- structed on both sides of the silos, running the _long axis -of-- -the exca-vaA4on. Two irregular, 511_ 0-- UN 0 E R CONSTRUCTION CONSTRUCTION 't FRAMEWORK RAMPS ' BUILDING UNDER CONSTRUCTION 100 LONG 35' X 30' eo' X 30' ? ? No , SILO UNDER CONSTRUCTION POSSIBLE RIM FACILITY UNDER CONSTRUCTION // 10,11111'-'4 / POSSIBLE INCLINED CONVEYER ---- Probable passageway under construction Road - Track 'trail Possible pipeline Ditching Excavation 100 0 100 200 300 400 90' X? 3014* EQUIPMENT BUNKER % UNDER CONSTRUCTION P- OSSIBLE VEHICLE _PARK FEET 'APPROXIMATE' FIGURE 4. LAUNCH AREA C, OLOVYANN AYA. TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for R 2012/08/20? CIA-RDP78T05439A000300370065-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 TOP SECRET RUFF NPIC/R-33I/64 shaped excavations at the left end of the site may be for buried tanks. To the left rear of the control bunker is a probable shallow exca- vation with an adjacent roughly circular exca- vation which may be the location of a possible spray pond. Three long narrow structures ap- proximately 100 by 15 feet, and probably round or curved, are positioned on the bank opposite the control bunker. Two large buildings and several small ones, probably for construction support, are located around the site. Evidence of ditching can be seen leading to the launch site from the site support facility. LAUNdf-i AREA F, PERM The quality and obliquity of the photography of Launch Area F (Figure 6) does not permit a detailed examination of this site in the mid- stage of construction. It was not possible to obtain reliable mensuration data on this site. Structures and facilities within the excavation are well along in construction. Construction ramps are evident but the exact positions of the silos cannot be identified. Structures of an un- definable shape, with considerable height above the bottom of the excavation, are at the ends of the construction ramps. At the center silo position this structure appears rectangular, similar to the rectangular enclosure around the silo, and supporting the cover, at a completed _ _ . _ site. Probable passageways are being con- structed within the site; the one between the silos and the forward side of the excavation is \ X ? .\ -------__ i so c, ' x ? \ /STRUCTURES / 200 / , A 100.X 15' 4111111144, I' I EQUIPMENT BUNKER \ FEET (APPROXIMATE/ ? I 1 / 4 'UNDER CONSTRUCTION I 40' LONG ..--- - *-- - ---I' - _______________ Probable passageway Probable passageway under construction Road Track/trail Power trace 4:// Silo under construction Ditch Excavation 400 600 COMPLEX MAIN ROAD POSSIBLE CONSTRUCTION FOR BUILDINGS TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 TOP SECRET RUFF NPIC/R-331 /64 apparently in place, with a segment outside the left silo leading toward the rear of the exca- vation. The equipment bunker between the left and center silos apparently has been roofed. The one between the right and center silos presents an uneven appearance and there appear to be two connections, passageways, running control bunker in the rear of the silos is although a portion has smaller than the probable to the center silo. The notched excavation to the still under construction, been roofed. Three structures are positioned in front of the excavation just outside the loop road at about a 45-degree angle from the long axis of the excavation. A possible spray pond under construction appears as a shallow excavation or basin to the left rear of the control bunker. A long narrow excavation or ditch extends from near the right silo eastward to a point beyond the security fence. Seven buildings or structures are lo- cated around the site. SII-0 UNDER CONSTRUCTION ? ? % CONTROL BUNKER UNDER CONSTRUCTION POSSIBLE SPRAY POND \ UNDER CONSTRUCTION Probable passageway Road Trail - Fence Ditch Excavation 500 0 500 1000 FEET ,APPROXIMATEI FIGURE 6. LAUNCH AREA F PERM. TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/08/20 ? CIA-RDP78T05439A0001nrn7nnAc Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 TOP SECRET RUFF NPIC 'R-331/64 COMPLETED SITES LAUNCH AREA G, VERKHNYAYA SALIDA coverage from Mission 4006 revealed several small details, although the site was under a Launch Area G (Figure 7) has been corn- heavy snow cover. One peculiar feature of this pleted since mid-1963. The excellent photo site is the height of the earth mounding over Road Silo covers cover position (open) ? Fence p, Control bunker entrance -,2)- Possible buried tanks Tower 100 0 100 200 300 400 FEET (APPROXIMATE UNIDENTIFIED UNDERGROUND FACILITy VEHICLES/LARGE EQUIPMENT PROBABLE TRANSPORTER/ERECTOR SERRATED EDGES PROBABLE SMALL VEHICLES VEHICLES PROBABLE ENTRANCE POSSIBLE COVERED SPRAY POND CONTROL_ BUNKER TOP SECRET RUFF Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/20: CIA-RDP78T05439A000300370065-1 TOP SECRET RUFF NPIC 'R-31i64 the control bunker. This extends for some dis- tance above ground level, indicating the control bunker is only s-emiburied. IWO small struc- tures, are atop the bunker. and an object A probable entrance is located on the right front side of the bunker but the main entrance is at the rear along the loop road. At the left end of the site. are two pos- sible buried tanks; there is no earth mounding over this area and only a faint indication of their possible location. Just forward of this area is a large earth-mounded area with a small structure similar to those atop the control bunker. The -n-ature- of the urr.de-rground-f-a-keil-itie