SOVIET MANUAL ON THE MAINTENANCE OF BOMBING EQUIPMENT ON THE TU-16 AIRCRAFT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A071000190001-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
66
Document Creation Date: 
December 27, 2016
Document Release Date: 
November 7, 2013
Sequence Number: 
1
Case Number: 
Publication Date: 
February 27, 1964
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A071000190001-2.pdf7.79 MB
Body: 
50X1 -HUM Declassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 INFORKATION R P0-"T-t, INFORMATION REP,ORT CENTRAL INTELLIGENCE AGENCY ,Z0X1 This material contains information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title 18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law. S-E-C-R-E-T NO FOREIGN DISSEM 50X1 COUNTRY USSR SUBJECT DATE OF INFO. PLACE & DATE ACQ. THIS is UNEVALUATED Soviet Manual on the Maintenance of Bombing Equipment on the TU-16 Aircraft REPORT DATE DISTR. 0,2. 7 February 1964 NO. PAGES 1 REFERENCES 50X1 INFORMATION. SOURCE GRADINGS ARE DEFINITIVE. APPRAISAL OF CONTENT IS TENTATIVE. 3 2 1 English-language manual on the Soviet TU- 1(50X1-HUM (BADGER A) aircraft, entitled Aircraft TU-16: Maintenance Instructions, Book III, Bombing Equipment publishing data were given. e manual has 116 pages plus two insets; nc 50X1-H UM 50X1 -HUM Distribution of Attachment for Retention: Army Army/FSTC Navy Navy/STIC Air Air/FTD SAC NSA OSI ORB 2 copies 3 copies 4 copies 3 copies )i- copies 6 copies (1 forwarded previously) 1 copy 2 copies 2 copies 2 copies S-E-C-R-E-T NO FOREIGN DISSEM 50X1 -HUM 50X1 -HUM 50X1 -HUM GROUP I Excluded from automatic downgrading and declassification STATEI DIA I ARMY I NMN I AM I NSA ARMY/FSTC NAVY/STIC AIR/FTD (Note: Field distribution indicated by "#".) Xt6 NIC I OCR SAC INFORMATION REPORT INFORMATION REPORT L Declassified in Part - Sanitized Copy Approved for Release 2013/11/07 : CIA-RDP80T00246A071000190001-2 Declassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 SECRET NO FOREIGN DISSEM AIRCRAFT TU-16 Maintenance Instructions Book III BOMBING EQUIPMENT (English Language) 4IL Declassified in Part-Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 0:: .1.'0 00o 0?-? e% ,-," . Declassified in Part- Sanitized Copy Approved 'for Release 2013/11/07 : CIA-RDP80T00246A01000190001-2 ? ? fORE1di4 biSSEAk ? ? _ 4 ; ? AIRCRAFT Ty46 -- Maintenance Instructions Book- III BOMBING EQUIPMENT ? 50X1 ? Secret Copy No._-.-17: ' -ff-r 1o?FORE1o.N4Is56Aen ...n `ri ? Declassified in Part - Sanitized Copy Apr;-roved for Release 2013/11/07: CIA-RDP80T00246A07'10001.90001-2 0. 0 . 0 ? 0 ,;-. o ? ". n.. ? ? ? Declassified in Part-- Sanitized Copy Approved for Release 013/11/07:2 CIA-.RDP80T00246A071000190001-2 t ????? ??-? ? bas-6,A- The Book contains IS pages and 2 inserted sheets with driwinas. +mama., 50X1. C ON TEN'T .8 Pagn Symbols and Abbreviations -5 Chapter I PRE-FLIGHT AND POST-?LIGHT INS:PDCTION 9 Preparation of Equipment, Bomb Hoisting and Pre-Flight Inspection Post-Flight Inspection and Maintenance 9 27 Chapter II . BOMB RELEASE CONTROL .38 Releasing Bombs from Bomb Bay. Navigator's Operstions in Case Bombing Equipment Units' Fail during Bomb Release .40 38 Chaptr III PFLOVING BOMBS PROM BC 17' 43 Bomb Rack Unloading 43 . - Flare Launcher Unloading . . 44' Bombs Away from Aircraft 44. Chapter IV Signal Taking BOMB-BAY DOOR OPERATION CONMOL General Normal Control Normal Control System System for Opening Bomb-Bay for Closing Bomb-Bay 46 46 Doors 46 Doors 47 47 48 48 Stand-By Control System for Opening Bomb-Bay Doors 'Stand-By Control System for Closing Botb-Bay Doors Emergency Control System for Opening Bomb-Bay Doors ? . . C);,4401R.EIOK;.151W114. . ? Declassified in Part- Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 ? :???`, 'o o 0 -1. ::..0 - 7: 0 - . ? Declassified in.Part 7. Sanitized Copy Approved for Release 2013/11/07: CIA-RDP-80T0046A071000190001-2 - ? - 4 - Page Emergency Opening of Bomb-Boy Doors with Mains De- Energized 49 Adjusting-Mioroswitches of Bomb-Bay Door Limit Switch. Box -49 Chapter V MAINTENANCE OF BR-473M OR BR-56 BOMB HOIST SYS= .... 53 Bomb Hoist System Installation in Idrcraft ? 53 Checking and Testing before Operation 54 Hoisting with Single Hoist 54 Hoisting with Two Hoists 55 Manual Operation 56 Routine Maintenance of BR-473M or BR-56 Hoists 57 Chapter VI PROBABLE FAULTS AND REMEDIES 60 Control and Release Systems 60 3140-39 Signal Flare Launcher System . ... 76- - 013-11p Bombsight Set 77 APPENDIX 84 ,,? A3C . M15-2M 'BB - BR-473M BT-500 BT34.49 BK B-45 2B-45 BH-45 BK2-142B Br-1, Br-2, Br-4, Br-5 RB-15-ORB-11p RC-1200-ORB-11p Rep-3-48 Rep-4-49 Rep-6-5 7-50 K-501( KB6.2A KBCB-49A KR37488 KR4-388 ? KOC-45 KU-547H KRY-3 Br-3, 50X1 SYMBOLS AND ABBREVIATIONS circuit breaker; - autopilot; ? - bombing equipment; electric bomb hoist, modernized; - bomb trolley, 500 kg maximum carryin6 capacity; - bomb trolley, 3000 kg maximum carrying capacity; - bombsight; - switch; - gang switch; - push-type switch; limit switch; - measuring instruments available in the Mi stand set;. . bombsight altitude transmitter; - bombsight speed transmitter; - bomb shackle of group three bomb rack; - bomb shackle of group four bomb rack; bomb shackle of group six bomb rack; - spark extinguisher device; contactor; - limit switch; bomb.release variation box; bomb rack; - bomb rack; - red light filter dome lamp; - hoisting guide of group, three bomb racks; - combined tester set; - ? ? ? ? - KintO,W.DIS 6 SEM2,4 Declassified in Part- Sanitized bopyApprovedforRelease2013/11/07 : CIA-RDP80T00246A071000190001-2 , . _ . " . r?. Declassified in Part- Sanitized Copy Approved for Release .2013/11/07 : CIA-RDP80?00246A071000190001-2 416.1 ? KCB-49 KY-50 MH-500 MBH-48 MEC OEB-11p HBA-48 H-4 HH-45 HK-3-53 HO-4500 HH-5 EYP PEE-4 PK P-8, P-9 PH e. ok 'np . *6 ? :11CYJI-473 Y1.-10 chkiar.250M46 .NTAE-100-80 MP. 3KCE49 :3CEP-49A 7 bomb release button; - universal 'key to cock 11AB-48 release unit; - hoist motor; - arming mechanism; ground speed motor ofOHE-11p bombsight; - optical bombsight (ganged with radar bomb- sight PEH-4);. - bomb release unit; packet-type switch; push-type - switch; hoisting hook' to lift bombs to bomb racks; - 4500 W inverter; - adjustment device of OHE-11p bombsight; - signal flare control panel; radar bombsight; ' - distribution box; - units of PEE-4 bombsight (navigator's indicator, navigator's control panel); - computer of 0HE711p bombsight; - wind velocity; - aircraft-to-wind angle; - drift angle; - - dropping angle; . - angle of lateral displacement; - sighting angle; - electric trolley of Eff-473M hoist control system, modernized; - dynamotor of OHB-11p bombsight;- - 250-kg high-explosive bomb; - 100-kg photoflash bomb; - plug connector; electricUly-operated, 39-mm signal flare launcher; - intervalometer (electric bomb release); flight altitude; - time of bomb falling; 1 PH-2 P11-6 PT-40 CRE-51 - CAE-100-,90 TT-1 7 Y - trail angle; ^ - true airspeed; O - ballistic coefficient - change-over - change-over - change-cver AV relay; relay;. relay; indicator-light; flare. bomb; - tester; - indicated airspeed aerodynamic correction; target elevation over sea level; slant range; - minimum slant range;,- of tomb; 50X1 - maximum slant range; - pitch stabilization angle; - indicated speed; - ground speed;. - indicated altitude; - temperature on the ground; - tomperPture at given altiLude; - train length; - formation correction; - heading angle; - bomb release warning time; - altitude correction, . -NO',OpREIGN: bie*A',?;; Declassified in Part - Sanitized Copy Approved for Release '2013/11/07 : CIA-RDP80T00246A071000190001-2 0 .13r; .:(7) Declassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 ,,701.ge0I5AtEkk . - . ,p_ Declassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIATRDP80T00246A071000190001-2 . - , ? ? 0 ) -24- 14. Hoist -the. bomb in conformity with the instructions' for operatf,on of bombhoists of BR.-473M (See Chaptery),.fOr which: (a) as-the shackle journals approach the bottom ends of the bomb rack beams slow down the hoists and carefully bring the journals into thebeam .211annels; (b) continue hoisting the bomb seeing that its body is approximately parallel to the ground:. Check for uniform'. operation of the two hoists. Hoist the bomb so that the bomb body is clear of the bomb rack beams; maintain a constant clearance between. the bomb body and the bomb rack beams; (c) hoist the bomb as high as the level of tlad top. latches;. as the bomb approaches the latcheS-Ulow--dowA-the--- ,. hois-Zis and align the bomb body to be parallel to. the bomb rack cross members. While hoisting the bomb slightly shake it up and 1:'.iwn by the fin; , . : (d) .bring the bomb onto the bomb rack latches, procedure being the ciame as outlined above for the .141E-500. bomb (KA3-488 bomb rack). ? or BR-56 types . _ the : 15. When sure of proper suspension, disconnect the sling cables-from-the-hoisting-sling and-lower-the latter.on_the _ ground- (Fig.36). 16. When hoisting the bottom 14.B-3000 bomb on the star- board side, install hoisting frame 13 on the port side bomb rack (See Fig.35).and fix twin guy 6 -to the hoisting beam. In this case bring the terminals of the port side hoisting sling cable from the top pulleys of the bomb rack to th?I sting frame pulleys and then to the pulleys of the twir guy (Fig.37), t pass them through the spacer holes and under the bomb body to secuie to the hoisting sling. , ? The bbmb hoisting Over, the bombs are equipped with fuses;: all the auxiliary accessories and hoisting equipment shall be removed from the bomb bay. - 25 50X1-- 3KCII-39.signal Flare Launcher Loadink 1. Tith cloth remove the lubricant from the launCher. .2. Release the catch and put the magazine at 90 relative to the set of tubes (See Fig.16): ' ? 3. Insert four signal flare cartridges into the. tubes (Pig.38). 4. Return the magazine i the catch thereby. 5. Check up four squib-initiated igniters, to the initial position, closing ? ? - ? insert them ' into the magazine seats (Fig.39), and holding them by fingers in pairs fix them _in -1.1_e position by turning the handles' of the spring-loaded lock through 90?-(8-6e-Fig-.17)-.----- 6. Insert the loaded set of tubes with the magazine into the casing so that narks on the set and on the casing align. t. Tighten the screw as far as it will go. Load the other - two launchers. ? Pre-Flight Inspection . Prior to flying a bombing mission the aircraft fully: equipped for the purpose should be inspected* by*the-navigator- and armament technicians with a view to testing for.proper. preparation of the aircraft. ?re-flight inspection is performed after all the preparatory operations on the aircraft* are over. Pre-flight inspection involves the following: 1. Inspection of the navigator's,_pilots',_and operator's cabins to make sure that all the switches on the bomb release control panels as well as control and instrument panels are in the OP t' BLIKRINEHO) or 1:TU=.1-1L 11EITPAIllori0) positions. . while the switches of -the bomb release control circuit breakers on the circuit breaker panels are ON. 2. Checking whether the amount and calibre of bombs cor- respond to the mission. ? 3. Checking for proper bomb suspension from the bomb racks and making sure that all the shackle journals arc reliably -?-7.717,77TzrIZ,A AppeL Declassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 o: - , ? . :.? s ? a. engaged by the latches (indicator pins are flush With the bohb which are recommended by the .rack beams) and the shackles are. properly attached (the arrows tive units. Show noiewise). 4. Checking for correct insertion of fuses into the bombs, proper equipment of fuzes, setting of delay data, fuze locking and testing for correct attachment of the parachute rip cords of incendiary and flare bombs. 5. Inspectlen of 'the bomb bay to make sure that pieces of auxiliary equipment, tools, bomb hoisting'units:except those listed in the present Instructions are 'removed from the compartment. ? 6. Reporting the results of the pre-flight inspection to 1 . the aircraft commander, switching on the bomb-bay interlocking , switches and closing the bomb-bay doors. Closing the .hatch of the interlocking switches-. Lalitine Maintenance and Inspection:: ? aa ? Theascope and time limits ;.7or,reutine maintenance and . inspections of the bombing equipment are specified by standing Instructions on routine maintenance and inspections of Bombing ' Equipment. . a? Routine. maintenance operations. are usually performed . during the post-flight Servicing and. within the time specially .allotted fOrthe-Purpose. The-iaSiltS-bt-Tbiltina-tairitenanca- a are recorded in the Service Log for' the bombingequipment.? The aircraft whose bombing equipment has not undergone' . the required routine maintenance operations cannot be admit- ' ted-fOr flying.. The aircraft bombing equipment is considered serviceable Onlar.after the elimination of all thefaults discovered duTing. the flight and in the course of post-flight inspection and after the completion of the scheduled routine maintenance . operations. For routine maintenance and inspections use only those types of control and test appliances,' 'tools and lubricants : i t ? ?.! 50X1 technical descriptions of respeo- The Person:Tr:11 in charge of routine maintenance and inspections must be properly qualified to exereisc high professional skill in maintenance and experience in adjusting and. testing bombing equipment Unita and mechanisms. Preparation for Right Flight Preparation for night bombing includes the following operations: ? . 1. AdjuEtiri-g the caps Of all the indidator lampa for the required illumination. . ? .2. Checking good' repair of the ultraviolet illumination equipment and.panel.illumination.latps,..: a. ..3. Checking good repair of the extension lamp. 4. Preparing the 013-11p bombsight, directional stabiliz- er and bombing equipment fer-night'bombing (which is accomplish-. ed_t_he_same Fay_as_for day . bombing) _ _ _ 5. 1:hen pre-Paring the 011B-11p bombsight particular attention must be paid .-to ,sure the followings (a) cleanliness of the bombsight.eptical.system; (b) proper operation and smooth .adjustment of the sight reticle illumination; -- (c) pi'opef .. -eonditin-of-the?luminous coating-on-the-- bombsight and directional stabilizer dials and indices. bomb- PO2T-FLIGHTINSP-ZOTION AND'MAINT2NANT.2 After every sortie all bombing equipment units end :mechanisms should be t31-_-x.Thly inspected; cheeks should be made for serviceability and proper assembly of the units,_ completion of the sets'and proper connection of the electric conductors to units as required by the circuit diagrams. Make sure that all the plug connectcrs are fixed tight With unaon nuts and locked, that the items of.equipmentinstalled cn ? .. - Declassified in Part - Sanitized Copy Approved for Release 2013/11/07 CIA-RDP80T00246A071 000190001-2 ? ?-? ' ?'?;". NO FOREIGN 91&SEM ???? ? SA0, PAU,A,Pho..P - 28 - shock-absorbers stand clear of the aircraft structure, that all the units are sealed and bonded, equipped with salety fuze indicator lights and light filters., that the electric con- -ductors are located clear of shari'edges of the aircraft structure Cotherwise the place of contact must Tle bandaged with BMA p.v.c. tape, the extension being-no less than 20 mm on both sides), that the conductors are not tightened or their sagging does not exceed 3 - 5 mm. The electric cables of,the -011E-11p bombsight must provide for a free right- or left- hand turning turning of the bombsight through 1-300. Make sure that' the units have not been danPEed mechanical- ly and that all the inscriptions are in good condition. All the circuit breakers, buttons and switches- must smoothly and . easily operate for ON and OFF, the operation being accompanied Zhy_a_characteristic-click After the switches and buttons are checked for proper operation, they must be turned to the OFF a1UCi0)- or _NTUTRAI!_(TIE2TPAHMO). _positions. All_theiknobs and_dials_must__ rotate smoothly and without seizing. ? All the faults and malfunctions disclosed during the inspection must be. eliminated with no delay. The route of inspection is shown in Fig.l. The inspection procedure is as. follows: . 1. Turning a screw-driver-counter-clockwise or,en-the---- hatch for interlocking switches (Fig.40) and turn them on (See Fig.2). 2. Inspect the port side 31CCH-39 signal flare launcher '(Fig.41) and make sure that the tightening-up screw is screw- ed to its limit. ; --3;'11.11I out the closing plug and inspect the static vent - of the 011E-11p bombsight transmitters (Fig.42). 4. Remove the cover from the dynamic pressure tube of. the 0115-11p bombsight transmitters (Fig.43). 5. Check the outside connection of the TIF-Ilp .with the Ail 5-2M .autopilot. Make sure that pin 2 of sight tail end and pin 1 of the connecting rod are inserted bombsight the bomb- in the seats to the limit wheel spring is connected directional stabilizer of 50X1 2-9 and locked, and that the drift gear with pin 3 of the clutch of the - the A115-2M autopilot (Pig.44.).. 6. Inspect the starboard signal flare launchers (Fig.45) and make sure that the tightening-up screw is screwed to the limit;. Make sure that the limit Switch of the bomb-bay red. ? dome light is held in the Of position by tbe nose L.G. Strut (Fig.46); .this is done by pressing the stem of the terminal switch;.the switch should not operate, the' free travel of its ? stem being 1.5 to 2 mm. 8. On the navigator-operators circuit breaker panel: inspect altitude transmitter 2 and.speed.tranzmitter (a) of the 011E-11p bombsightand their connection to -static-and dynamic lines (Fig .47); (b) check operation of BOMB DAY LIGHTING COCBEMEHME E0/50- _LOTCEKO circuit breaker 3 and BUBBAY LIGHTING (OCBEI4E- BOMBOoTatkik)- switch 4. - 9. Inspect the 0115-11p bombsight control box (Ftg.48) and make s.-re that the fusible cutout is intact. 1C. Check operation of signal flare control panel .circuit breaker A3C-5 located on the co-pilot's circuit breaker panel (See --- ? 11. Check operation of bombing equipment control units on the starboard side of the navigators cabin, for which: (a) check operation of the switch and the signal flare release buttons; make sure that while turning the sleeve on the signal flare control panel the colour in the window of...the cap changes; _ ? (b) check operation of the circuit breakers on navigatbf!ra--- ric,ht-hand circuit breaker panel 3 (Fig.49); (c) check- opertion of the toggle switches and bomb door - control 'change-over switch 1; . , (d) check operation of RCE-499 bomb release button; . (e) inspect the altitude unit (Fig.5C); (f) -check operation'of change-over switch 1; .70?J? , Declassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 - I ? , 30 - (g) make sure of smooth rotation of altitude setting handle 2 and altitude scale 3. 12. Inspect. the bombsight, for which: . (a) check -Operation of the following knobs: trail, time of falling, train. Make sure of their smooth rotation involv- ing no seizing; (b) check operation of bombsight eyepiece 5 and make sure of its smooth rotation without seizing (Fig.51); (c) check operation of light filter mechanism 1, paying attention to the change of colour in the bombsight field of vision (Fig.52); .(d) check smooth movement of rheostat knobs for'illumina- tion of c(.11imator (5) and optical (3) systems; . ? (e) check operation of automatic bomb release mechanism 4 and make sure that the knob intensively returns to its initial position; (f) check operation of switches 1 and 2 (See Pig:51); (g) check operation of the stop of gyroscope.caging device handle 7; .(h) check for proper condition of the lamps illuminating the collimator and optical_systems; (i) Check operation of the mechanism and knob of col- limator 8; (j.) check Operation of drift mechanism engagement knob and drift correction knob 7 (See Fig.52); (k) check the position of the mechanical interlock screw 'of the erecting mechanism cutout relay and make sure that the screw spline is against BOBING,(BOMBOMETAHNE); (1) check drift knob 9 and sight -turning knob IC (See Pig.51) for smooth operation; (m) check operation of the accelerated correction knob; (n) check condition of the silica gel cartridge; (o) make sure that WARDING (flPEAMPERAEHNE) and RELEASE (CEPOC) lamps are intact; (p) check operation of the synchronization selector knob; (1) check operation of the sighting button; . ?31 44; ? 50X1 (r) check the sighting knob and the sync;cronization knob for smooth operation; (s) check the bombsight for proper mounting and proper connection with the A11-5-2M autopilot.. 13. inspect the computer ?. (Fig.53), for which: (a) check knob 14 and altitude scales 4, -11 for smooth. rotation; (b) check ail.craft speed-setting knob 10, ground speed scale 6 and aircraft speed scale 5 for smooth rotation; (c) check wind bearing scale knob- 8 an.d wind velocity setting knob 7 for smooth rotation; (d) check temperature setting knobs 2 and 3 for smooth rotation; -- ? ?- (e) check aerodynamic speed correction knob 1 for smooth rotation; (f) check operation of the bomb ballistic coefficient I setting .1calob; (g) check operation of HV (13) and TYT(12).switehes. 14. Check operation of the bombing equipment control units on the port side of the navigator's cabin: (a) check .operation of the. switches, protective caps and the station status indicator button on left-hand bomb release panel 1 (Fig.54); (b) inspect 3CEP-4.9A intervalometer 2, make sure that the dials and knobs rotate smoothly, check operation of the switches; (c) check operation of the switches on bottom bbmb release control panel 3; (d) inspect KBCB-48 bomb release variation box 1 (Fig.55); (e) insect IriY-50 spark-extinguisher box 2; (f) check all 'Lle circuit breakr..:7s on navigator's left- hand circuit breaker panel 1 (--iee 1.Fig.56) for proper . opera- tion; FOREGtLQJSEMO npriassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 1 -7- -32- (g) open the cover of A.C. fuse box 2 on the navigator's electric panel and check if the bombsight Circuit fusible cutouts are available. Hate: Check switches, buttons and light filters for mechanical,faults. 15. Energize the operations: _ .(a) switch on the A3C-5 circuit breakers of the bomb' door control and bombing equipment indication system on the . navigator's left-hand circuit breaker panel and make sure that indicator light BOMB-BAY DOOR'CLOSED (MK 3AKEIT) bay door control panel. is burning; ? (b) by the pressure gauge on the pilot's middle panel make sure that the hydraulic system is under Pressure. The pressure gauge readings may range within 70 to 80 kg/cm2; (c) give the command CLEAR THE BOMB-BAY DOOR (OT ROKOB) and after receiving the report DOOR CLEARED (ECM 0111100B) open bomb bay doors by_the.toggle switch. Make sure that the indicator light BOMB-BAY DOOR OPEN (MK OTKPIIT) comes on, . while the indicator light BOMB-BAY DOOR CLOSED (.1110K 3AKPIDIT) goes out; (d) turn all the circuit breaker switches OFF; - (e) de-energize the aircraft mains. caps and emergenCY-bemb. switches on the pilot's panel .(Fig.57). 17. Check the protective Caps, the switches of ARMED " (B3PHB) and emergency bohib release With the mains de-energized on the pilot's panel (Fig.12). 18. Check operation of bomb-bay door closingtoggle control system on the pilot's hydraulic aircraft mains and perform the following , on the bomb-; release switch 1. of the stand-by panel (See ' 19. Inspect the navigator-operator's instrument panel (Fig.58) and check operation of the NCE-49 bomb 'release .button. 20. Set the interlocking switches to OFF. . 21. (a) (b) device; (c) (d) Ji.e...41e., ? ? - ? 50X1 Inspect the following units: micrpswitch Vox 3 (Fig.59); soleiloids 1 of-hydraulic drive emergency unlocking bomb-bay red dome light 2; bomb-hoist power supply plug connectors on the forward _ distribution box of fuel pumps. 22. Inspect. the following units of boMbing equipment located in.the-bomb bay: (a) bomb racks.KA3-488 and K:44-388 and.. all parts, assemblies and unitsincorporated suen as: I1BI[_18 bomb' shackle release.Units, i:1H-4c :arming mechanism; pulleys for cable.; linkage, plug connectors,. BH-47 boxes for interlocking switches, check operation of Ilatah centrol handles; ?(b) atiachment fittings of the bombackto those aircraft; . (c) make sure that all the bomb release distribution boxes are-locked; .(0-MakeThurt-that? all-the free-electric bunch-conductors-- ate connected to the sockets; (e) inspec-i; the bomb hoist power supply plug connector on. rear fuel pump distribution box-2. . ? 23. Inspect the following heisting units: (e)-IR-47-3M_ .electromech4.1_boph. hoist _asSe.Tibly, triosheave'end pulley 1, twin guy, hoisting hook, single-sheaVe _ - . end block, H3-547H guide, movable blocks,'hoisting.frame, hoisting.sling-(ig:60), etc.; ----(b) make sure that there are no .breaks, frays or ruptures of the strands of the hoisting cables, that all the cables are :::: icatcd with pc.trolatum and cable terminals are not damaged; (c) inspect. all the pulleys of the hoisting system, make that they are reliably secured in the brackets andproperly' rotate on the axles;. .(d) inspect ths a tachment-units of the hoisting system.. of -the-- 1.00101-? npriassified in Part - Sanitized Copy Approved for Release 2613/11/07 : CIA-RDP80T00246A071000190001-2 1) v3 Declassified in Part -Sanitized Copy Approved for Release 2013/11/07: 61A-RaP80t60246A 071000190001-2 :;; ? t - . , - ? , I/ ? , 04 cf, ? ? ? - 34 - - 'Llisgnment of OHEllp Dombsigh-li . ? . ? Directional Stabilizer with AircraLI Longitudinal AXis, The permissible angle of the directional stabiliz- er with the aircraft longitudinal axis should .not exceed 15'. 2. The alignment of the directional .stabilizer may be. checked with the aircraft being either. in the flight line position or resting on three points over an even concrete platform. 1. Draw a 20 - 30 m. line ahead of the aircraft to mark ? the longitudinal axis and a parallel line at a distance of ?? - 7777- .--.15-01:4-ta the left -to denote thesight optical-axis displace-- ment- relative to the aircraft axis. . ? 2. Set the directional - --thb-hobbtlght-Spherical-l-eveI. Y7f. ? : ? stabilizer in a horizontal plane by ? 3. Set the trail-knob to zero. 4. Engage the bombSight clutch and disengage the auto- pilot clutch. 5. Disengage the drift stabilizer knob and by the bomb- sight turning knob set the bombsight to zero drift on the drift angle sCale-of.the directional 'stabilizer.' 6. Make sure that while turning the sighting knob the sighting beam travels along the auxiliary (second) line within --the entire sighting range; 7. If the sighting beam deviates from the auxiliary line by more than_15.!_a1 sightinganglep_19_to15? and by more than 25' at sighting angles over 75.61 it is necessary to loosen-. -77 ?- ? the forward bolts fastening the foot of--the-directional stabilizer bracket and turn the foot to an extent ensuring the deviation . within the allowance 'specified above. Tighten. up and-lock the fastening bolts of the foot of the directional 1 stabilizer bracket. . 8. Make sure that the bombsight is set to the zero drift- ? angle. 50X1 35-.- Clevmdng and Imbrication of 3HCH-39Cignal Flare Launchers The launchers must be kept clean and Properly maintained.- Cleaning the launchers which a14--to be mounted in the aircraft is imperative in the following cases: (a) after firing; : ? (b) after a prolonged idle period (5 tc l0 days); - (c) by an order of the unit armament engineer, ,which may concern the occasion when the 1=chere must be cleaned'after flights involving no actual firing when they have been exposed to snow, rain or sand. The provided ? The launchers 'should be cleaned in places specially.: for.:cleaning.aircraft_gun armament? following materials are used for cleaning; 1..-1Zerosene for removing powder fouling and cleaning perts.affec-Tga-by powder gases as well as for _ the current-;carrying and insulating parts of the _ the. launcher _ _ cleaning launcher. After cleaning with kerosene all the parts should be rubbed dry. . ? _ 2. Rifle oil for lubricating the launcher .parts after - cleaning in summer-only.. -_ ? 3. -grease- TMAIRM-201 -for ltbricating-the-launcher.parts for altitude flights in summer as well as for lubricating ' them in winter. ? 2. flags for cleaning, rubbing and lubricating; Short flax fibre is recommended for cleaning only. 5. Sponge for cleaning the tubes. 6. Brush for lubricating the tubes.'-- - 7. Handle for cleaning and rubbing the contact pins. Contact pins are cleaned with the assistance of the handle with a recess in its. threaded part; the recess serves to hold a piece of soft clean. cloth soaked with kerosene. The working part S of-the contacts are cleaned of soot by bringing the handle into the casing, then they are rubbed with dry clean cloth. , ? ? Declassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 ? _, Declassified in Part.- Sanitized Copy Approved for Release 201-3/11/07 : CIA-RDP80T00246A071000190001-2 oArc.0_ plug - 36 To avoid distortion and jamming, cleaning and .wiping of contacts must be done with care. Tever lubricate the current?carrying or insulat? ing parts. Bomb_lng Eouipment Storage As a rule most of the units of the bombing equipment are not coated with protective paint, they are protected only by anodiZed or oxidized films; because of the specific operating conditions the surfaces of the units are liable to consider? able damage.. - , To avoid. damage all units which are.not,installed in the aircraft (such as: bomb racks, aming wire, hoisting system units) should be stored on racks in a dry, aired room protected from penetration Of dust and sun rays. - All the units of must be provided with nrming wire: BR-473M bomb trolleys must be the equipment installed in the aircraft covers. The ONE-11p bombsight set, electromechanical bomb hoists and T?CYJI supplied with loose covers. The bomb hoisting equipment should_bestored in_bags. - After eVery operation the hoisting units must be cleaned of dirt, dust and moisture. All thelloisting cables must be constantly greased with petrolatum. Sheave axles, ball bear? ings, bomb hoist reduction gears, pressure rollers, drum disengaging mechanism, bomb hoist brake switch and the trolley wheel?boaririgs should'be periodically greased with WATRM-201 I grease. The bombing equipment should undergo general inspection. ! every 15 days and be checked for serviceability. Storage conditions must also be checked. : If any traces of corrosion are detected on the surfaces of the units, measures should be taken for their removal. When performing general inspection follow the procedures outlined in Chapter 1 of the present Inst-ructions. - ..Aa? Preparation for RestationinA In case of changing the base of the aircraft all the bomb racks and hoisting equipment should be mounted in the stowed positio:?Pig.61). Por this purpose the following procedure : is adopted: ? . 1. Put all the bomb racks in the stowed position.in.accord? ance with the diagram of bombing equipment arrangement for restationing. Mount the 'hoisting beams on the bomb racks.. 2. Pack a set of arming wire in a special bag and hoist it to the bomb racks. . 3. Into two special bags rack the hoisting equipment, . . which-comprises.: H43-547---guides,- two?sheave ? - single?sheave end pulleys,DE3-53 hoisting hooks, rip' cord. fastening cables, bomb rack hoisting pulley, movable blocks, hoisting sling, fastening slings, twin guy, hoist crank, hoist. .? c9=st:::rient_straps fastening end-pulleys'to hoists, and A complete list of the equipment is iven on the plate attached in theilOCAB compartment. the bags with the esuipment'.onthe4ack in the IJOCAB compartment and secure them with straps (Fig.62).- 5. Mount two BR-473M bomb hoists on the stowed position.. brackets in the UOCAE compartmeLt. The other two'hoists should be mounted on the T?CYR bomb trolley. MU ..? , . . neclassified in Part - Sanitized Copy Approved for Release 2013/11/07 : CIA-RDP80T-00246A071000190001-2 o' ? - -? 0 : ? . . Declassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 ? .- ? , in-.: - ? ? ? . ? : 1??????????,, .Chapter II BOMB RELEASE CONTROL RELEASING BOMBS FROM BOMB BAY The combat bomb release performed by"the navigator or the ,navigator-operator is-closely connected with aiming in range. and in azimuth by means of the 011B-11p bombsight or the PRI14 radar bombsight. Here we assume that the preparatory work with the 013-11p and PEIT-4 bombsights is finished and that the engagement of the bomb ra1ease-iWif-Ohe6-arid-preParing bombing equipment units-is performed' as is Outlined in the Instruc- tions for Navigation and BomMng .To perform sight-controlled bomb release the navigator should.do the following: 1. Make sure that all the circuit breakers of the bombing -equipment are switched on: 2. set the By means of knobs and switches on the intervalometer required method of bomb 'release (SEL or TRAIN), bomb-release-interval -and- the-number of-bembs ---- . (salvoes) to be dropped. - 3. Make sure that all the bombing equipment controls are ; in the initial Position. . ? &It: Items 1 to 3 are, fulfilled prior to assuming the bombing run. .? 4. Turn on the master bombing switch en the bomb-bay ' door control panel. 5, When the sighting angle equals 55 or 600 cook the lever of the automatic release mechanism on the ':011E..11p bombsight. ; 50X1 6. Turn on the Switches of the rack.selector relay and: the salvo sWitch SIR= 'BO IS or IN PAIRS. Ea:La: Items .4 to 6 are fulfilled when aiming during the bombing rUn.- 7. By the station status indicator lights make sure all the bombs are released. Turn off the switches of the rack selector relay, .close the bomb-bay doors, turn Off the master bombing switch and the. bombsight ground speed motor. To release bombs by the bomb release bUtton the navigator must do the following: - 1. make sure that all.the circuit breakers .of the bombing . .equipment are switched on. 2. By means of knobs and switches on the_intervalometer. set the required method.of bomb release (SL or TRAIN), tomb release interval an the number of bombs (salvoes) to be dropped. .. 3. Make_ sure_that_all .. the bombing equipinent controls are- in"the initial position: . .4. Turn on the master bombing switch on the bomb-bay' door control panel. 5. .1fter assuming the bombing run -open the bomb-bay doom by the, switch. ' ? ---6.Then hc creen warning light '' th6-b-Omboight--fIash.es"..- on, turn on the rack selector relay switches and-the Salvo V. VV V switch. _ __ _ _ _ . . -7. Theft the sighting angle index alignes with the dropping angle index in the field of vision push the bomb release v button. - ? 'In the course of aiming b: means of tne.Pg1-4 .sight all the operations enumerated in Items 1 to 5 are performed by the navigator. Bombs'are released by the navigator-operator by means' of pushing the bomb release button on his instrument' panel at the moment when the target image alignes with the range mark on the indicator. screen. "."",-?-?? .NO F9G1-DiSSEA Declassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-OP80T00246A071000190001-2 47? .000 - ? ? _.-- Declassified in Part -Sanitized Copy Approved *for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 -40- 8. By the station status indicator lights make sure all the bombs are released.. ' Turn off the bomb rack selector relay switches, close bomb-bay doors, turn off the master bombing switch and the bombsight ground speed motor.. To effect the emergency SAFE bomb release by the navigat- or the emergency release switch on the navigator's left-hand release control panel should be turned on. After dropping the bombs turn off the emergency release switch and close the bomb-bay doo:.7s. In case of an ARMED bomb release it is necessary to turn on the ARMED switch on the pilot's instrument panel. For the emergency SAFE bomb release by the pilot the emergency release switch on the pilot's instrument panel must be turned on. When dropping the bombs ARMED, it is necessary .to -him on the emergency release ARMED switch on the same . panel. After dropping the bombs, turn the switch off and close .the bomb-bay doors. To effect the emergency bomb release with the mains de-energized the pilot must unlock the release handle on the pilot's control panel and pull it as far as it goes. Mien dropping the bombs ARMED, it is necessary to turn on the ARMED switch on the same panel and to close the bomb-bay doors. _Note: In case of an emergency bomb release by the pilot the bomb-bay doors are closed only by the bomb-bay door closing switch of the stand-by control system on the pilots'.hydraulic system control panel (Fig.63) after setting the emergency release switches in the OFF positiOn. NAVIGATOR'S OPERATIONS IN CASE BOMBING EQUIPMENT UNITS FAIT DURING BOMB RELEASE ,TING: If a failure of one of the units of the bombing equipment is detected in the Course of flight, it is necessary first to check the engagement of all the 50X1 - 41 circuit breakers on the navigator's left- and right- hand cirCuit breaker panels. 1. If the bomb-bay doors cannot be opened by the bomb- sight it is necessary to make one of the following operations: (a) open the bomb-bay doors by the switch of the normal bomb-bay door control system; (b) open the bomb-bay doors by the bomb-bay door opening stand-by system switch located on the bomb-bay door control panel; (0 open the bomb-bay doors by the switch on the pilot's control panel. 2. If the bombs are not released from the bomb-bay by the sight it is necessary to check the following:_ (a) whether the bomb-bay doors are open (watch the bomb- bay door position indicator lights); (b) engagement of the bomb rack selector relay switches; (c) proper preparedness of the intervalometer; (d) reliability of contacts in plug connectors BOMBSIGHT (BOMBOIIPNLIEff) and STABILIZER (CTAMEM3AT0P) on the autopilot directional stabilizer. After the checking procedure perform another bombing run and release bombs by the bombsight. 'If the bombs are not released by the bombsight, release then by pressing the navigator's or navigator-operator's bomb release button. 3. If the bombs are not released by the bomb release buttons they must be released by the navigator's or pilot's EMERGENCY RELEASE (ABAPHRHUR CEPOC) switch which is first turned in the ARMED (B3PHB) position in case the bombs are to be released ARMED. 4. If the bombs are not released after taking all the possible measures, it is necessary to perform the following operations: (a) close the bomb-bay doors; (b) turn off all the switches on the navigator's panel; (c) switch off all the bombing equipment circuit breakers : on the navigator's circuit breaker panels. ?':',P.91140)4;Pts4g, ? Declassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A07100.0-196001-2 ? ? , 1 ..J.? '? : -00 0 0r". els: - ? Declassified in Part- Sanitized Copy Approved forRelease2013/11/07 : CIA-RDP80T00246A071000190001-2 H re: - i?-r??????.i. ?42- 5. If the bomb?bay doors are not closed by the switch of. the bomb?bay door control panel it is necessary to.do the fol? lowing: . (a) check whether the EMERGENCY RELEASE (ABAP14HN2 CBPOC) saitches,on the pilot's and navigator's panels are in the OFF position; . (b) close the bomb?bay doors by the pilot's bomb?bay door closing stand?by system switch. "r? 7 ? , _ 50X1 . Chapter: III REMOVING BOMBS FROM BOMB RACKS Bombs may be removed from the bomb racks in .case of failure to release them in flight or in. case the, loading. ? ? variant has to-be changed, etc. While'removing bombs it. is - .necessary to strictly .follow all. the.i.nstruetions_outlined in Chapter 1. BCMB RACK UNLOADING 1. Screw out the bomb fuzes. 2. Install the bomb hoists, end pulleys and other.eleMents of the hoisting system.' 3. Arrange the cables in accordance with the bomb rack rloa-ding-var-larit: 4. Depending on the calibre of the bomb 'to be removed. engage it with the hoisting hook or attach the hoisting sling to the botto6 bomb. 5. Take up the. cable slack; 6. Cock all the bomb Shackle release units if. they have not been cocked. 7. Put the latch group control handles in the UNLOADING (PA3ITY3KA) position. 8. Lift .the bomb so as to sink the lower station latches. Note: To avoid the upper bomb sliding out of its latches, see that -the lowertbotb.does not touch the upper one during the removal. 9. Lower the bomb and detach the shackle from it. , ? ? ?:??:4":!?"*"?().;???,.:',";,.?-:.???.?- ? - cPtS5 . , Declassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 ? :.-- I .? :0 "(-) .. " -. in ? ? ? - . . ? Declassified in Part - Sanitized Copy Approved for Release 2013/11/07 : CIA-RDP80T00246A071000190001-2 -- ? ? ' . C. J V ? -44- 10. Remove all other bombs following the same procedure. 11. Put the latch group control handles in the LOADING (3Ara3KA) position and mount the shackles en the approPriatoi bomb racks. 12. Release all the nu-4.8 bomb shackle release units. SIGNAL FLARE LATTITCHM UNLOADING 1, Screw off the tightening-up screw f the launcher. 2. Extract the set of tubes with the magazine from the launcher case. 3. It-ess the catch pawl and open the magazine. 4. Extract the cartridges fromthe tubes. 5. Unlock the squib-initiated igniters and pull them out.; 6. Close the magazine. 7. Fix the set of tubes in'the jacket. ffa-12: If firing took place the flare block should be primarily sent to the shop for cleaning.- -8. Unload the other launchers. TAKING BOMBS AWAY FROM AIRCRAPT Taking Away Bombs Removed from Bomb Racks 1. Bring ET-500 or ET3-49 bun; trolleys onto the bomb. 2. Fix the bomb trolley lifting device to thebomb suspen-- sion lugs. 3. By means Of the hoist lift the bomb onto the trolley and fix it with sway braces. .4. Tow the bomb trolley. loaded with the bomb to the - place of packing and unpacking the bombs.. 5. Lower the bomb from the trolley onto the supporting frame. 6. Grease the bomb suspension lugs with slushing grease. Screw the plugs into the nose and tail fuze adapters. 7. Similarly take away all the other bombs removed from the aircraft. 1 1 50X1 8. Collect the hoisting accessories and put the working place in order. WA, neclassified in 1)-a'r't - Sanitized Copy Approved for Release 2013/11/07 : CIA-RDP80T-00246A071000190601-2 o ' -Chapter IV AOMB-BAY DOOR OPERATION C(iNTROL . GENERAL 1. The following types of bemb-bay dcor control are dis- tinguished: normal, stand-by and emergency. Bomb-bay doors are controlled from the navigator's and pilot's control panels (Fig.63). 2., Prior to opening or closing the bomb-bay doors on the ground the following operations are required: (a) make sure that there are no obstacles in the bomb barr or under it; (b) give the command CLEAR BOMB BAY DOORS (OTTDKOB) and on receiving the return command BOMB BAY CLEARED (ECM OT RDKOB) open or close the doors;. (c) make sure that the interlocking switches are ON; (d) check the pressure in the hydraulic system by the pressure gauge installed on the pilot's middle instrutent pan elJ. The reading of the instrument must be within 70 to 80 kg/cm2. NORMAL CONTROL SYSTEM FOR OPENING BOMB-BAY DOORS 1. Make sure that A3C-5 circuit breakers NORMAL BOMB DOOR CONTROL OTIPABJEHIE CTBOPOK BOMBOADKA EOPM) and BOMBING EQUIPMENT INDICATION (OXIMAILEOMEOB3OPY1.) on the navigator's circuit breaker left-hand panel are ON. 2. Make 'sure that BOMB DOORS-OPEN (ADK OTKPUT) indicato) light 7 is not burning while BOMB-BAY DOORS CLOSED (JK 3AKPHT) indicator light 8 is on (Fig.63).. 50X1 47 o?-- 3. Put switch 61n the OPEN (OTKPHT) position and hold 'it till the BOMB-BAY DOORS OPEN (ADK OTKPHT) indicator light ;flashes on. 4. Make sure that the BOMB-BAY DOORS CLOSED (RDK 3AKPHT) I indicator light has gone out, - - NORMAL CONTROL SYSTEM FOR CLOSING BOMB-DAY DOORS 1. Make sure_that.A3C-5 cArcuit breakers NORMAL BOMB-BAY DOOR CONTROL (YHPABAEHHE CTBOPOK BOMBOADKA HOPM.)and BOMBING EQUIPMENT INDICATION (CHrHAA. BOMBOBOOPYI.) on the navigator's,_ circuit breaker left-hand panel are ON. 2. Make sure that BOMB-BAY DOORS OPEN (RDK OTKPHT) . indicator light 7 is burning whereas the indicator light 8 BOMB-BAY DOORS CLOSED (ADK 3AKPHT) is off. 3. Put switch 6 in the CLOSED (3AKPHT) position and ? hold it for 5 or 6 sec. after the BOMB-BAY DOORS GLOSED (MK 3AIGHT) indicator light flashes up:. - ? . 4. Make sure that the BOMB-BAY DOORS OPEN MK OTKPHT) Indicator light has zone out. STAND-BY CONTROL SYSTEM FOR OPENING BOMB-DAY DOORS 1. Make sure that A3C-5 circuit breakers STANI)-DY BOMB- BAY DOOR CONTROL (YHPABEHNE CTBOPOK BOMBOADKA 3AHACH..) ? and BOMBING EQUIPMENT IRDICATION (MHO. BO4B0BOOP57.). on the navigator's circuit breaker left-hand panel are ON. ? 2. Make sure that BOMB-BAY DOORS OPEN (JK WIGHT) Indicator light 7 is not burning and BOMB-BAY DOORS CLOSED (MK 3AKPHT). indicator light 8 is on. ? 3. Turn on switch 9 of the stand-by control system for opening bomb-bay doors and hold it till the indicator light BOMB-BAY DOORS OP7T (NDK OTKPHT) flashes up. ? . 4. Make sure that the BOMB-BAY DOORS CLOSED (ADK 3AKPHT) Indicator light has gene out. 5. Turn off the switch. - ;F9rtfigtli;i1SsEm Declassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 Declassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 - ?,-?:????-z ' 'NO?'IrFOREIGWDISSEM 48 STAND-BY CONTROL SYSTEM FOR CLOSING BOMB-BAY DOORS 1. Make sure that A3C-5 circuit breakers STANDBY BOMB- BAY DOOR CONTROL (YgPABREHHE CTBOPOR EOMBOOKA 3AgACH.) and BOMBING EQUIPMENT INDICATION (CHrHAff. BOMBOBOOPM.). on the -navigator's circuit breaker left-band panel are ON. 2. Make sure that BOMB-BAY DOORS OPEN (MR OTRPHT) indicator light 7 is burning whereas BOMB-BAY DOORS CLOSED ()IOR 3ARPUT) indicator light 8 is out. 3. Press switch 10 of the stand-by control system for ? closing the bomb-bay doors on the pilot's hydraulic control panel and hold it ON (BRADIEHO) for 5 or 6 sec. after the BOMB-BAY DOORS CLOSED (ER 3ARPHT) indicator light flashes up. 4. Make sure that BOMB DOORS OPEN (MR OTKPHT) indicator light is dead. EMERGENCY CONTROL SYSTEM. FOR OPENING BOMB-BAY DOORS 1. Make sure that A3C -5 circuit breaker EM2RGENCY BOMB RELEASE (ABAPHRHA CEPOC EOMB) on the navigator's circuit breaker right-hand panel and A3C -5 circuit. breaker BOMBING EQUIPMENT INDICATION ( ofruff. BOMBOBOCP.M) on the navigator's circuit breaker left-hand panel are ON. Make.sure that BOMB-BAY DOORS OPEN (JIiDK OTRPHT) Indicator light 7 is not burning and BOMB-BAY DOORS CLOSED (JDOIC 3ARPHT) indicator light 8 is on. 3. Open the proteCtive cap and turn on.emorgency release switch 11 on the'top bomb release control panel or switch 14 on the pilot's instrument panel. After the BOMB DOORS OPEN ODE OTRPHT) indicator light flashes up, turn the switch off. _4. Make sure that BOMB-BAY DOORS CLOSED (MK 3ARPUT) indicator light has gone out. EMERGENCY OPENING OF BOMB-BAY DOORS WITH MAINS DE-ENEMIZED 50X1 Press switch 12 on the pilot's motor panel and hold it till the bomb-bay doors get open. ADJUSTING MICROSWITCHES OF DUMB-BAY DOOR LIMIT SWITCH BOX In the course oT aircraft maintenance thc adjustment of the bomb-bay door limit switches must be periodically checked. Improper switches should be adjusted for 68? of the bomb-bay door opening and for a complete opening. Checking Procedure 1. Disconnect the bonding strips of all the rods from the doors. 2. Rocking the doors extract the bolts fastening the rods' to the doers and take them out of the seats. 3. Turn on the safety switches. 4. Make sure that hoMb-ddor open position indication limit switch 2 (Fig.64) is engaged, for which: (a) switch on A3C-5 circuit breakers BOMB-BY DOOR CONTROL (IMPABJEHNE CTBOPOR BOMBOJIDKA) and INDICATION (cmrHA- E3A1XH) on the navigator's circuit breaker left-hand paner; (b) make sure that DOME-BAY DOORS OPEN UDR OTKPHT) Indicator light on the bomb-bay door control panel is ON. This indicates that the microswitch is in the working posi- tion, 5. Make sure that emergency ARMED release relay switch 8 is engaged. For this purpose: (a) remove the covers from the bomb 'release distribution box, emergency bomb release distribution box and from the emergency bomb release distribution box with the mains de- energized; ,4666:401415)8E1,4 Or i- ? - nprincciiied in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 ? Declassified in Part -Sanitized Copy Approved for Release 2013/11/07 : CIA-RDP80TOC)246A071000190001-2 .. .?.,? , . NO FOREIGN bisi f?-4170" . - ? ? (b) switch on A3C-10. circuit breaker EMERGENCY ARMED RELEASE (B3PHB .HP14 ABAP.CBPOCE)on the navigator's circuit breaker right-hand panel; (c) turn on'switch ARMED (B3P0) on the pilot's instru- ment panel and make sure that the P11-2 relay in the release distribution box has functioned. 6. Make sure that limit switches 5 engaging combat bombing relay have functioned. For this purpose switch on A3C-2 circuit breaker COMBAT BOMBING INTERLOCKING RFT,AYS (BROKMPO- BMW PERE BOEBOrO.BOMBOMETAHNR) on the navigator's circuit breaker left-hand panel and, make sure that P11-6 relays in the release distribution box have functioned. Make sure that limit switches _e engaging 1311-2 emergenc release control relay have functioned. For this purpose ? switch on A3C-2 Circuit breaker EMERGENCY BOMB RELEASE CONTROL RELAYS (PERE YEPABREHMH ABAPHMCBPOCA BOMB). On the navigator's circuit breaker_right-hand.panel and make sure that P11-2 relay's in the emergency release distribution box have function- ed. 8. Make sure that emergency release circuit interlocking limit switch 3 with the mains de-energized has functicned. For this purpose: - (a) unlock the bothb.releabe handle for emergency release__ with power supplied from the storage battery system and turn it on; make sure that the K-50A emergency release relays (for the mains de-energized) installed in the emergency release distribution box have functioned;? (b) push the handle back to the initial position. 9. Make sure that combat bombing relay limit switches 5 get connected to the circuit before emergency release control relay limit switches 6 are energized. ?or this purpose: (a) put the bomb-bay door normal control switch in the CLOSED (3AKPEITO) position; (b) close the bomb-bay doors by slowly operating the hand pump till the P11-2 emergency release control relays in the -51- 50X1 emergency release distribution box return to the initial posi- tion; Note: Communication between the personnel 'participating - in the operation is accomplished through the . interphone systeit: (c) :;everal times simultaneously switch off and on both A3C-2 circuit breakers EMERGENCY BOMB RELEASE CONTROL RELAYS (PERE YHPABREHMH ABAPARH.CBPOCA BOMB) on the navigator's circuit breaker right-hand panel and make sure that P11-2 relays in the emergency release distribution box do not (d) several times -simultaneously turn off and on A3C72 circuit breakers COMBAT BOMBING INTERLOCKING RELAY (BR0KRP0- WI-1E0E PERE BOEBOPO BOMBOMETAHM) on the navigator's circuit breaker -left-hand panel and make sure that-PH-6 relays in '--- the release distribution box pick up and drop out. 10. Close the bomb-bay doors by operating the hand pump till roller_17 disengages. wedge 14. Make sure. that the BOMB DOORS OPEN (OK OTKPk) indicatorlight haS-gone out-and that P11-6. and P11-2 relays in the release distribution box have - returned to the initial position. _1_1. Operating the hand pump close the bomb-bay, doors till v roller 19 is disengaged from 'wedge 15. Make sure that K-50A relay in theemergency release-distribution_box (with the Mains de-energized) does not function while performing the _ operatins outlined in Item 8 of this Section. 12. Operating the.handspump close completely the tomb-bay doors and make sure that .BOMB-BAY DOORS CLOSED ( 3A1{PHT) indicator light on the bomb-bay door control panel comes on. 13. Open the bomb-bey doors. 14. Turn off all the circuit breakers and switches. Close the covers of all the distribution boxes. - Adlustina Limit Switches_ 15. Remove lock wire 20. 16. Fulfil the operations listed in Items 1 2 and 3. , Declassified in Part - Sanitized Copy Approved for Release 2013/11/07: CIA-RDP80T00246A071000190001-2 ? ' Declassified in Part - Sanitized Copy Approved for Release 20:13/11/07 8700246A...071,000190001-2 -? ? ? ? ? ? " ? ? ? ? " - 52 - 17. Operating the hand pump place rollers 17 and 19 to the middle of the bevelled part of wedges 14 and 15. 18. Turn appropriate adjusting screw 21 clockwise until : the microswitch clicks and make a check according to the appropriate Item of the Section.' ? 19. Lock the adjusting screws with wire. 20. Fulfil the operations mentioned in Items 13 end 14.' ? at.2: While removing the limit switch box to replace the switches follow the instructions, of the Technical Description of the Bombing Equipment. *774 * _ .