MINUTES OF THE 29 JUNE 1988 HCS TECHNICAL EXCHANGE MEETING

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP91-01355R000300100003-3
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
21
Document Creation Date: 
December 23, 2016
Document Release Date: 
July 8, 2013
Sequence Number: 
3
Case Number: 
Publication Date: 
July 12, 1988
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP91-01355R000300100003-3.pdf357.95 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 1..7e7:1 FBIS-2429/88T 1 & JUL 1988 MEMORANDUM FOR: Distribution FROM: ComMunications Segment Manager, ADD SUBJECT: Minutes of the 29 June 1988 HCS Technical Exchange Meeting 1. Representatives of FBIS/ESG, OIT/CED, CONTEL, and Lockheed Electronics (LEC) met in the ESG conference room at 1330 hours on Wednesday, 29 June 1988. The agenda is provided in Attachment A. The list of attendees is provided in Attachment B. 2. New Connectivity Requirements - Five telephone changes were requested by FBIS. Remove call waI t na frnm nnn r cure extension has telephone Many callers in Maryland ai to use the area code and are routed to this extension, with a rate as high as 1 each minute. (Note: CONTEL made this change effective 6 July 1988.) b. Four additional secure telephones in the User Support Branch need to support Classified AFS terminals. (Note: Detailed requirements for these secure lines are being drafted in memorandum FBIS-2430/88, which is to be submitted to OIT.) 3. Schedules a. Delivery of LEC reported that the four terminal server cabinets with wiring harnesses are ready for delivery to FBIS. Access holes have been punched to permit running communication cables between the cabinets. It does not appear that anti-chafing material is required in the holes for protection of the cables. One hole remains to be punched in the cabinet side adjacent to the Flex IM. It was agreed to proceed shipping the cabinets to FBIS during the following week. (Note: the cabinets arrived at FBIS on 6 July 1988.) Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 STAT STAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 F8I5-2429/88 SUBJECT: Minutes of the 29 June 1988 HCS Technical Exchange Meeting b. Installation - The Flex IM is positioned in the Data Center and the fiber optic cable has been installed. The secure circuits in the Data Center are to be rerouted through the Flex IM by the end of July 1988. The STE to ITE conversions are in progress and should be completed by 18 July 1988. c. Testing 1) has provided the end-to-end circuit test plan shown in Attachment C. That plan needs to be modified to reflect the extensive capabilities of the terminal server in supporting such tests. 2) OIT plans to begin tests after the STE to ITE conversions are completed. is available for those tests but does not have the required security clearances for working with equipment attached to the secure PBX. As a precaution, he is documenting a test procedure for CONTEL personnel which makes use of the terminal server (Action Item HCS-081). d. Sealing Data Center 1) The non-secure telephone circuits in the Data Center are expected to be run through fiber optic isolators by the end of July 1988. It is expected that each circuit conversion takes no more than thirty minutes to complete. 2) has prepared a letter requesting isolation of the MINWK and Wang ICT circuits. The letter needs approval by the respective contracting officers before CONTEL can accept the task. It is expected that each circuit conversion may take several hours to complete. Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 STAT STAT STAT iv Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 F5I5-2429/88 SUBJECT: Minutes of the 29 June 1988 HCS Technical Exchange Meeting 4. Security Concerns a. The present configuration of the terminal server ports is set up as: Configuration Dial-up Ports Nailed Terminal Ports Nailed Printer Ports See Qty Attachment 17 D 377 E 54 F Total Ports 448 b. Requirements call for twenty one dial-up terminals to access AFS. This means that there are four more dial-up terminals than available dial-up terminal server ports. a) Reduce the number of dial-up circuits to match the available number of dial-up ports. -3- Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 STAT Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 73 FBIS-2429/88 SUBJECT: Minutes of the 29 June 1988 RCS Technical Exchange Meeting b) Reduce the number of nailed circuits attached to the terminal server, freeing up ports to be reconfigured for supporting dial-up terminals. In this case, the nailed circuits remain in place but cannot be used until the number of terminal server ports is expanded to accommodate them. FBIS needs to determine which circuits can be disconnected. (Note: the only reason for dial-up AFS circuits is to permit sharing of telephone lines with VM terminals.) 5. Port Distribution - Detailed informat4on reardin terminal server port distribution has been provided to DC/AFSB. Some of the information needs to be updated but no significant problems are evident at this time. 6. Action Item Review - The status of the action items reviewed in the meeting are listed as Attachment G. 7. Future HCS Communications Technical Exchange Meetings may not be required. It is expected that present outstanding issues can be addressed outside the TEM environment. Attachments -4- Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 STAT STAT 3 Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 FBIS-2429/88 SUBJECT: Minutes of the 29 June 1988 HCS Technical Exchange Meeting DS&T/FBIS/ESG/ADD/SES Distribution: Original C/ESG DC/ESG SA/ESG C/HED DC/HED C/EB C/AFSB nr/APRR 1 - 1 - 1 - 1 - 1 - GE/SES Chrono 1 - FBIS Registry C/ADD DC/ADD -5- 05JUL88) Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 STAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 FBIS-2429/88 Attachment A CONTEL/FBIS/LEC/OIT TEM Agenda 29 June 1988 1330 Hours New Connectivity Requirements Schedules - Delivery - Installation - Testing - Sealing Data Center Security Concerns Port Distribution Action Items Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 STAT Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 FBIS-2429/88 Attachment C Page 1 of 8 June 28, 1988 DATA TESTING ? Test Configurations: (reference drawing #1) 1. Nailed 3 wire ckts 2. Dial-up 3 wire ckts 3. Nailed 5 wire modem control ckts Test Equipment Recommended: 1. 2/Async terminals (RS-232 Interface) (GTE) Type 1 2. 2/Source for Transmitting Data (1 CFE and 1 GEE) Type 2 3. 2/Source for Transmitting Data (capable of operating in modem control). (To be used in alternate modem control testing, if supplied by the customer.) 4. 1/Test printer (capable of operating in modem control). (To be used in alternate modem control testing, if supplied by the customer.) Type 1 5. 2/RS-232 cables (straight through, supporting pins 2, 3 and 7). Type 2 6. 2/RS-232 cables (straight through, supporting pins 2, 3, 6, 7 and 20). NOTE: The data communication parameters will be the same for all tests: 9.6K Baud 8 Bit Word No Parity 1 stop Bit Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 Data Testing June 28, 1988 Page Two FBIS-2429/88 Attachment C Page 2 of 8 1. Nailed 3 Wire Ckts (reference drawing #2) Verification of end-to-end data transfer can be accomplished by: A. Station Equipment 1. Connecting a Type 1 RS-232 cable to the A0I-100 or DOB-1 being tested. 2. Connecting an async terminal to the other end of the cable installed in step 1 (above).. B. Switch Equipment 1. Connecting a Type 1 RS-232 cable to the ADI-101 being tested. 2. Connecting a Type 1 data source to the other end of the cable installed in step 1 (above). Upon completion of steps A and B (above) verify data transfer by: Transmitting data (the Quick Brown Fox message) from the switch equipment data source, and receiving the transmitted data at the station equipment terminal. Disconnect the Async terminal from the station equipment RS-232 cable, and connect the Type 1 data source to the RS-232 cable. Disconnect the Type 1 data source from the switch equipment RS-232 cable, and connect the Async terminal to the RS-232 cable. Transmit data (the Quick Brown Fox message) from the station equipment data source, and receiving the transmitted data at the switch equipment terminal. Repeat these procedures for each applicable station equipment locations and the associated switch equipment locations. Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 ? Data Testing June 28, 1988 Page 2hree FBIS-2429/88 Attachment C 2. Dial-up 3 wire ckts Page 3 of 8 (reference drawing #2) Verification of end-to-end data transfer can be accomplished by: A. Station Equipment 1. Connecting a Type 1 RS-232 cable to the AD/-100 or DOB-1 being tested. 2. Connecting a Async terminal to the other end of the cable installed in step 1 (above). B. Switch Equipment 1. Connecting a Type 1 RS-232 cable to the 11DI-101 being tested. 2. Connecting a Type 1 data source to the other end of the cable installed in step 1 (above). Upon completion of steps A and B (above) verify data transfer by: Going off-hook on the ITE 12 Plus or ITE 128, dialing the appropriate directory number, hearing the carrier tone (the data lamp will be flashing). Push the data button to make connection (the data lamp will be solid), and going on-hook. (The data lamp will remain solidly lit.) Transmitting data (the Quick Brown Fox message) from the switch equipment data source, and receiving the transmitted data at the station equipment terminal. Disconnect the Async terminal from the station equipment RS-232 cable, and connect the Type 1 data source to the RS-232 cable. Disconnect the Type 1 data source from the switch equipment RS-232 cable, and connect the Async terminal to the RS-232 cable. Transmit data (the Quick Brown Fox message) from the station equipment data source, and-verify receiving the transmitted data at the switch equipment terminal. (When data transfer has been verified, push the data button to disconnect the data path, the data lamp will be extinguished.) Repeat these procedures for each applicable switch equipment location. (ADI-101 in the dial-up group), also, perform this test from each applicable station equipment location (only 1 switch equipment location. ADI-101, need be tested from the remaining station equipment locations.) Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 ? maLa sescsng June 28, 1988 Page Four FBIS-2429/88 Attachment C Page 4 of 8 3. Nailed 5 wire modem control ckts (reference drawing #3) Verification of end-to-end data transfer can be accomplished by: A. Station Equipment 1. Connecting a Type 2 RS-232 cable to ADI-100 or DOB-1 being tested. 2. Connecting a RS-232 break-out box, DCE adaptor, to the other end of the cable installed in step 1 (above). 3. Connecting an Async terminal to the DTE adaptor end of the breakout box installed in step 2 (above). B. $witch Equipment 1. Connecting a Type 2 RS-232 cable to the ADI-101 being tested. 2. Connecting a RS-232 breakout box, DCE adaptor, to the other end of the cable installed in step 1 (above). 3. Connecting a Type 1 data source to the DTE adaptor end of the RS-232 breakout box installed in step 2 (above). Upon completion of steps A and B (above), verify data transfer by: Transmitting data (the Quick Brown Fox message) from the switch equipment data source, and receiving the transmitted data at the station equipment terminal. Verify modem control leads by: insterting positive voltage on Pin 20 at the switch equipment breakout box, and seeing pin 6 become active at the station equipment breakout box. (repeat the above step from the station equipment breakout box to the switch equipment breakout box.) Disconnect the Async terminal from the station equipment RS-232 cable, and connect the Type 1 data source to the RS-232 cable. Disconnect the Type 1 data source from the switch equipment RS-232 cable, and connect the Async terminal to the RS-232 cable. Transmit data (the Quick Brown Fox message) from the station equipment data source, and verify receiving the transmitted data at the switch equipment terminal. Repeat these procedures for each applicable station location, and the associated switch equipment location. Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 Declassified in Part - Sanitized Copy Approved for Release 2013/07/08 : CIA-RDP91-01355R000300100003-3 Data Testing June 28, 1988 Page Five 362C FBIS-2429/88 Attachment C Page 5 of 8 An alternate modem control ckt test can be performed, if a Type 2 data sburce is provided and an item #4 test printer is provided. Verify Modem control by: Transmitting data from the switch equipment Type 2 data source to the test printer, verify that data transfers. Repeat these procedures for each applicable station equipment location and associated switch equipment locations. Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 DTE STATION VIRE AFS DATA END-TO-END TESTING ADI-100 ITE 12+ OR ITE 12B EX SAE FIBER LINK FLEX It-1 ADI-101 CABINET DRAWING if 1 FS-23Z TERMINAL SERVER Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 OTE Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 RS-232 PN 2 1113 IN 7 STATION WIRE ADI-100 3 WIRE DIAL-UP 84 NAILED cKTs ITE 12+ OR fTE 128 IBX S/80 FIBER LINK FLEX II1 ADI-101 CABINET DRAWING #2 PIN? PIN 3 PIN 2 TERMINAL SERVER Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 RS-232 Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 RS-232 STATION WIRE P TERm Pin 7 AD1-100 Plat_ P I AFS MODEM CONTROL CKTS ITE 12+ OR 1TE 12B IBX siso FIBER LINK FLEX IM ADI-101 CABINET TERMINAL SERVER DRAWING 43 BIN 2EL_ PIN 7 PIN 6 PIN 3 PIN 2 Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 PS-23a Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 TERMINAL 3 WIRE DIAL-UP CKTS PIN 2 (TX) PIN 3 (RX) PIN 7 (SG) IBX S/80 PIN 2 (TX) PIN 3 (RX) *414\ PIN 7 (SG) SEE NOTE: TERMINAL SERVER NOTE: REPRESENTS THE CONNECTION POINT WHERE A DIAL-UP DATA CALL IS CONNECTED OR DISCONNECTED Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 eclassified in Part - Sanitized Copy Approved for Release 2013/07/08 CIA-RDP91-01355R000300100003-3 3 WIRE NAILED CKTS PIN 2 (TX) 0 0 IBX 5/80 0 ; PIN 2 (TX) 9 1.1 el to rt H TERMINAL TERMINAL SERVER PIN 3 (RX) ; PIN 3 (RX) PIN 7 (SG) ? PIN 7 .(SG) ? ? ? ? poianse 2013/07/08 : CIA-RDP91-01355R000300100003-3 Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 TERMINAL MODEM CONTROL NAILED CKTS ? PIN 2 (TX) PIN 3 (RX) PIN 6 DSR PIN 20 DTR PIN 7 (SG) IBX S/80 PIN 2 (TX) PIN 3 (RX) PIN 6 DSR PIN 20 DTR PIN 7 (SG) Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 TERMINAL SERVER stl rt rt fri lb EA C) 5 CD N.) PO 0 C. rt CO tri CO Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 Action Item Status Report FBIS-2429/88 Attachment G Page 1 ACTION ORIGIN ACTION ITEM/ACTIONEE/DUE DATE STATUS ITEM # and DATE DATE COMPLETED HCS-056 TEM Forward preliminary LEC delivery COMPLETE 4/27/88 3/31/88 schedule to CONTEL through COTR. HCS-057 TEM 3/31/88 4/15/88 for data 6/29/88 COMPLETE 6/29/88 Testing to start in 3rd week of July. STAT STAT Develop test schedule circuits HCS-058 TEM Forward full-scale drawing of COMPLETE 4/27/88 3/31/88 DECserver rack, cabinet, mtg to CONTEL and ADI 4/15/88 STAT HCS-059 TEM 3/31/88 Identify ADI ports which support APS printers. are to COMPLETE 4/27/88 4/27/88 STAT HCS-060 TEM Forward ADI chassis to LEC. COMPLETE 5/11/88 1 3/31/88 LEC received hardware 5/11/88. HCS-061 TEM 3/31/88 HCS-062 TEM 3/31/88 5/11/88 Investigate whether special security arrangements are needed for Flex IM or attached circuits. OPEN Awaiting Security response to letter from OIT. Determine if there is sufficient COMPLETE 4/27/88 room for overhead trough above 25 pair cables will be ADI cabinets, run underfloor. 4/27/88 Declassified in Part - Sanitized Copy Approved for Release 2013/07/08 : CIA-RDP91-01355R000300100003-3 STAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 FBIS-2429/88 Attachment G Page 2 Action Item Status Report ACTION ORIGIN ACTION ITEM/ACTIONEE/DUE DATE ITEM # and DATE HCS-063 TEM 3/31/88 Contact at HOs regarding Wang circuits through shielded enclosure STATUS DATE COMPLETED COMPLETE 4/27/88 Deferred to HCS-066. 4/27/88 HCS-064 TEM Investigate whether ITEs can be COMPLETE 5/09/88 3/31/88 wall-mounted in the Data Center. Wall mounting brackets have been ordered. 5/18/88 HCS-069 TEM Identify requirements for ADI COMPLETE 5/18/88 4/27/88 101s to LEC and CONTEL. Cabinets will support 448 active ADIs, 12 spares. HCS-070 TEM 5/18/88 Obtain two terminals for CONTEL 4/27/88 tests of data circuits. HCS-073 TEM _ 5/19/88 7/15/88 Review AFS circuit testing plans with Office of Security OPEN Terminals will need to meet Reston zoning requirements. COMPLETE 6/29/88 STAT STAT STAT STAT STAT 6/29/88 STAT HCS-074 TEM 5/19/88 Address AFS terminal server distributions. port OPEN CONTEL has provided circuit configuration to APSE. Being reviewed. 7/05/88 STAT HCS-080 TEM Estimate cost for programming PBX OPEN 6/29/88 to give each dial-up user a unique T/S port. This is needed to prevent security problems caused by interrupted sessions. STAT Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 Declassified in Part - Sanitized Copy Approved for Release 2013/07/08: CIA-RDP91-01355R000300100003-3 FBIS-2429/88 Action Item Status Report Attachment G Page 3 ACTION ORIGIN ACTION ITEM/ACTIONEE/DUE DATE STATUS ITEM # and DATE DATE COMPLETED HCS-081 TEM 6/29/88 Document procedure for testing OPEN Cleared personnel needed for hands-on testing. circuits with DEC Server. 7/18/88 HCS-082 TEM Revise connectivity needs so that OPEN 6/29/88 each dial-up user has a unique This is in support of T/S port. Action Item HCS-080. if 7/18/88 IDeclassified in Part - Sanitized Copy Approved for Release 2013/07/08 CIA-RDP91-01355R000300100003-3 STAT STAT