SHIPBUILDING IN BALTIC PORTS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP83-00415R010500190003-1
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
7
Document Creation Date:
December 14, 2016
Document Release Date:
June 12, 2001
Sequence Number:
3
Case Number:
Publication Date:
February 9, 1952
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP83-00415R010500190003-1.pdf | 397.35 KB |
Body:
COUNTRY
SUBJECT
ti
ACQUIRED
25X1A
ATEOF INFO :
ACQUIRED
CENTRAL IfLUIGENCEl GNCY REPORT NO.
INFORMATIO14 REPORT CD NO.
CLASSIFICATION ,S.,2,CI&T/CONTROL - U. S. OFFICIALS Ci
Y N{' " TOrT
00 5X1A
Germany (Russian Zone) DATE DISTR. 0 Feb. 1952
Shipbuilding in Baltic Ports NO. OF PAGES 1 25X1A
NO. OF ENCLS. 5 pa e s
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO.
The attached report is forwarded to you for retention
with the request for an evaluation of the maritime
items it oontains.
THtS''`f s!T ~t`''? E?,; LCSJRE ATTACKED
'C6 t,(rj
Approved For Release 2002/01/04: CIA-RDP83-00415RQ10500190003-1
25X1X
'
Approved For Release 2002/01/,D4 : Cj
IA-RDP83-00415RP10500190003-1
Approved
Approve 00190003-1
5
For Release ~11'A9N8FM -DR83-00415R010
(DATE)
TO:
BUILDING ~,^^
REMARKS:
~iU ~ IX.Q/
dc~
FROM: CIA LIBRARY, DIST. UNIT
EP 1946
S
A the Stralsund Volkswerft tht-- third trawler ha - S e t
is ObLod. it Is a craft 57.5 m Ion; , 52 m between perrpen-
d *uiars, 9m in bcsm, with a freeboaM of 4.83
draft of 4 m. The en Fine is an 8-Cylinder 80Q-970 P
diesels built `:y 1umaf s reeor-strletac by 1e rizitaet-und-
t-as.schinen (r) of oer?lite. The not handling engine
is a 500 P &Lc eu- olf. Auxiliary motors are to rO r'
B ckaat - olta> The fish ea. aciti is 4,5OO hampers (korb) s
and the crew 52 :.ea. the main deck is an auxiliMrY
boiler that eat: be tired either with oil or as.
Mch*u" -iv=-a the tonnage of the trawler
r ~ ~..~.. ,,.,.,.
es 1,15. `h-;Is Is certo'niy too .high; at an est .mate,;
of the 24 meter cutters that were bro rf.
has been earri ed
25X1.A
ae t e 813 t'c to allow :,Ales to
SECRET CONTROL
U. S. OFFICIALS n"' Y
s 'CRzT/ CONTROL U.S. Or.-7TCIALS ONLY
proved For Release 2002/01/04: CIA-RDP83-00415R010500190003-1
or completion 13aa.ve been t .rued. over to
pies ' a.e tent (VYB) fishery at Saes
35 such c ttte*_?S.
. Approved For Release 2002/01/04: CIA-RDP83-00415R01050019
25X1A
SECRET/ CONTROL
private Yard
' boat ar&
SECRET CONTROL
U. S. OFFICIA'.' n'II_Y
U.S. OPTICIALIS ONLY
m,,, the :ships being
r
_.fro
A
,A 25X1X
*rew, a a J.' aft tb* area and mere
under. sae eer ear to
detei1s,
.ad,~wyN
bailt # ne for
ide that;
pbieiyot 10
6 sera,, four
!ate. close. 4o o 31 Osage
zfl,1041 are about 150
0 AAA c i ow of' Pe Ptesele
" a a are bux'
biTtea a . , .. 3 x+d a
St"ch
so simmer typo. + out
over -size Russian lo. area-
ding the flow*
rO. e D ten. railroad station to th4
built and tool for t ho . it ratt. to daii
pla era w Saxe about five take a
TLbe fuel story $e area. is
? P "`
rj ar the road about 400 a from the a
p.acent,, and
.,*Ala ors and 4r~4. .`-.e
f.. S; k41 y~fx "a'0
Ili eel rc
Jp-
Y
li
a.irf .a d.. a spur has been
,fl the loa4ih
ea$ 4
DID..qfuel Are In the open her, some of
open, to the
guard poet.
e, m In rough
S CR]ET/ CONTROL - - U.S. OFFICIALS ONLY
SECRET CONTROL
I ~. S. orr r'.A 1_ c O ! Y
Approved For Release 2002/01/04: CIA-RDP83-00415RO10500190003-1
Tee'
Approved For Release 2002/01/04: CIA-RDP83-00415R010500190003-1
SECRET/ CONTROL-ITS OFFICIALS ONLY
SECURITY INFORMATION
'ae an Democratic Republic
25X1A
SHIPBUILDING PROGRAM $3 FOR CEMBER JzW 1951 (5 pp; German;
I5X1X 25X1C 25X1X
The first page of this typewritten document is a covering sheet in English, stating
that the German part of the document
e n wo
are an au o e c er w, rk plan for the repair
section of the shipping trust. 22 key projects are listed, which includes Financial control
and material aspects of the winter 1951/52 shipyard production plan; speedy working out of
all material plans for repairs to the shipping fleet for the 1952 plan; , stue of the possi-
bilities of converting ships to operation on brown coal or briquette; study of lubricant
consumption; start of overhauling of the steamer HWal" in Rathenow; conclusion of all 1951
investmnt projects in the shipyards; blue prints for machinery for coastal motor boats of
350 tons, 550 tons, etc.
The fourth page, undated, is the December 1951 work plan for chief refekent (specialist,'
Mender. The work for which he is responsible includes: finishing the conversion of the
steamers "Tuemnler" and UWa11 for surface condensation operation; pushing work on building
tugs, hopper barges, and pilot boats; deciding about further work to be done on the salvage
ship "Goliatht'.
25X1C The fifth page, lists the December 1951 inspection trips to
be made by Pfaender. His list includes Havelbergwhere he was to inspect the work being
done on the steamer Tuemmier; Genthin, where he was to check the work progress on the con-
struction of pilot boats and maintenance boats; Tangermuende, where he was to check on the
}work and preparation for the building of hopper barges; and Postelwits and Laubegast where
the was to zkotk check on the work on seagoing lighters and river master's boats,
25X1A
y
/Foreign language document or microfilm of it (A 6988) is available in the CIA library ext
25X1A
SECRET/CONTROL-US OFFICIALS O
29 February 1952
Approved For Release 2002/01/04: CIA-RDP83-00415R010500190003-1