AG WISMUT NEW INSTALLATIONS IN OBJECTS 90, 101, 6, AND 96

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80S01540R006600080060-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 27, 2016
Document Release Date: 
March 28, 2013
Sequence Number: 
60
Case Number: 
Publication Date: 
May 31, 1955
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80S01540R006600080060-1.pdf138.29 KB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2013/03/28: CIA-RDP80501540R006600080060-1 50X1 -HUM INFORMATION REPORT INFORMATION REPORT CENTRAL INTELLIGENCE AGENCY This material contains information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title 18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law. COUNTRY SUBJECT DATE PLACE DATE 50X1 -HUM OF INFO. ACQUIRED ACQUIRED East Germany AG Wismut New Installations Objects ..90,101,6? REPORT in DATE DISTR. and 96 - NO. OF REQUIREMENT REFERENCES 31 Nay 1955 PAGES NO. RD 50X1 -HUM r' rr'PUTIp.JT IS TFNTATIVE. Obiect 90 2, The Third Administration of the Soviet-German Company Wismut (AG Wismut) approved in January 1955 the following new installations of mechanical equipmen at Site 85 of Object 90s a.Hau:loggijiimatat, estimated cost 61,860 eastmarks 12.:1 engine,type FW 13, diemieter 13L0 nm., 1000 mne "0 ;qT 2 valle,y7 ( Seillerne) 2500 mm. diumeter ^ oag 1600 X ;1) 30 ? fifJe.,:et, 2805 nr? ?-ntstimated ,-:!oFit 34,030 eastmark 2 cage 1.11-loi:?Eg platforw 1. elt? agneti(i .e.agger lith electromagnetic switch? 7 foot-7pragzers 1 A-7,in hodst, type K12 4 left -Ind right 3witche3 11:neJ2 ( Bogotaweihen) left 1o:1., 1..)0 1,7;s ( 1 snk5 Lc0 Ueborg. S-E-CR-E-T 50X1-HUM STATE t .7,:r I ARMY 1 :::,-,. i NAVY _ I, } AIR L -,.,1 FBI L 1 AEC i :,c, I _1 L ___ . (Note: Washington distribution indicated by "X"; Field distribution by ' ".. Declassified in Part - Sanitized Copy Approved for Release 2013/03/28 : CIA-RDP80S01540R006600080060-1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/28: CIA-RDP80501540R006600080060-1 c. Ore aradinz *Plant, estimated cost 29,978 eastmarks 1 travelling platform ( Schiebetruehne ) I geared tipper ( Stirnkipper ) 4 rotary tippers 3 double swinging sliding releases 1 sliding release 1 control valve 2 chutes Obiectla 2. The Third Administration of the Headquarters of AG Wismut approved in January 1955 an order for the installation of the following equipment at Zeehen 9 and 11 of Object 101: ? installation of 6 electric oven, 2920 z 2370 z 3500 mm. high * Installation of 6 witch cables (Schaltpulten) 1300/800 x 2000 mm. high I rotary .ttslper redler /ides (Hollbahnea, sue 310011090 a 480 mm. * haloes. eaSh 1100 a 1100 z 1700 mml. 1 ronoryor ewer, 390 emu diameter 12 m }Ong 1 conveyor Darer. /90 mm. diameter 9 m,10ng * concentrate bunker ( Koczentratbunker ) 4, The total cost of the equipment, excluding items marked with an asterisk, *ill be 12,835 eastmarks. ()Mut 6 5, The Third Administration of the Headquarters of AG Wismut approved the follow- ing order for mechanical equipment for Object 6 in January 1955: 1 conveyor belt, 650 mm. 1 conveyor 'belt, 500 mm. 1 conveyor belt, 500 mm. 1 conveyer belt, 500 mm. wide, 24.4 in. long wide, 7.9 in. long wide, 19.15 m, long wide, 5.4 in. long S-E-C-R-E-T 50X1-HUM 50X1-HUM 50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2013/03/28: CIA-RDP80S01540R006600080060-1 Declassified in Part - Sanitized Copy Approved for Release 2013/03/28: CIA-RDP80501540R006600080060-1 S-E-C_R-E T - 3 - 3 RAS test belts with grading devices (Raspruefband in. Dosiervorrichtung), 800 mm. wide, 4.8 m. long 1 test best without grading device, 800 mm. wide, 4.8 in. long 4 conveyor belts without cages ( ohne Fahrgestell) each 5.3 m. long 1 special conveyor belt, 500 mm. wide, 14.2 in. long 6 mechanical spreaders 1 drum sieve, 1000 mm0 diameter x 2300 mm. 4 control valves with magnets ObJect 961 Freital 7. The Third Administration of the Headquarters of AG Wismut is considering a plan for the installation of a storage bunker for ore at the ore concentration plant at Object 96 in Dresden-Freital. The mechanical equipment for this enterprise mould cost 865,600 eastmarks and the electrical equipment 129,750 eastmarks. The plan has not yet been approved.' 1. 50X1-HUM' 50X1-HUM 50X1-HUM Comment the Fre ital .site has become so congested, 50X1-HUM the primary consideration for any expansion there is whether enough space is available. sE_(1 r_m 50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2013/03/28: CIA-RDP80S01540R006600080060-1