ELECTRIC POWER PRODUCTION AND DISTRIBUTION IN RUMANIA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP82-00457R015100220009-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 27, 2016
Document Release Date: 
July 9, 2013
Sequence Number: 
9
Case Number: 
Publication Date: 
November 28, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP82-00457R015100220009-8.pdf87.82 KB
Body: 
/ ? Declassified in Part - Sanitized Copy Approved for Release 2013/07/09: CIA-RDP82-00457R015100220009-8 FEB 1952 ?1-4A14 , COUNTRY SUBJECT DATE OF INFO. PLACE ACQUIRED 50X1-HUM CENTRAL INTELLIGENCE A CLASSIFICATION SECRET/OONTROL U.S. OFFIC/AIS 0 SECURITY INFORMATION Rumania INFORMATION REPORT REPORT Electric Power? Production and Distribution in Rumania CD NO. DATE DISTR. 28 November 1952 NO: OF PAGES 2 NO. OF ENCLS. (LISTED BELOW) SUPPLEMENT TO REPORT NO. 50X1-HUM ITHIS DOCUNENT CONTAINS INFORMATION AFFECTING TME NATIONAL DEFENSE OF THE UNITED STATES, willing IRE MEANING OF TITLE 10, SECTIONS 193 AND IS.N. OF THE U.S. CODE, AS AMENDED. ITS TRANSMISSION OR REVE- LATION OF ITS CONTENTS TO OR RECEIPT DT AN UNAUTHORIZED PERSON IS PROMISITED OT LAW., TINE REPRODUCTION OF.TMIS FORM IS.FROMTOITCD. THIS IS UNEVALUATED INFORMATION 50X1-HUM The Rumanian Electric Power Plan provides for production of 1,196,000 loss of thermoelectric power and 764,000 kws hydroelectric paler. _Thermoelectric power is to provide 59.8 percent of the country's power; hydroelectric power . is to provide 38.2 percent. Certain small power producing plants of uncertain classification are to provide the rest. The general total is to be 2,000,000 loss. These figures are for the period of one year. They are apparently to be reached between 1955 and 1960 and exceeded after 1960. \ 2. By 1955, production is expected to reach the following levelss Total capacity 1,700,000 kws; available power 1,666,000 kws. By 1960 these figures are expected to be total capacity 2,600,000 kws; available power 2,500,000. Thermoelectric power in 1955 is to reach 1,370,000 kvs; in 1960D 1,765,000 kws. Hydroelectric power is to be 290,000 kws. in 1955; 735,000 kits. in 1960. 3. This compares with the foLlowing figures for 1950s Total 'Capacity 740,000 kws; available power, 600,000 loss; thermoelectric 550,000 kws; hydroelectric 50p000 kws. 4. The Electric Power Plan provides for seven systemss Ymntenia System Oltenia System North Moldavia System South Moldavia System (to include Rumanian Dobrogea) Central Transylvania System Northwest Transylvania System Southwest Transylvania System ? CLASSIFICATION SECRET/CONTROL U.S. OFFICIALS ONLY 50X1-HUM STATE NAVY NSRB ARMY AIR FBI DISTRIBUTION ORRM Declassified in Part - Sanitized Copy Approved for Release 2013/07/09 CIA-RDP82-00457R015100220009-8 Declassified in Part - Sanitized Copy Approved for Release 2013/07/09: CIA-RDP82-00457R015100220009-8 ui IRA ,n.l.nt I -I I VIVI SECRET/CONTROLPa0So OFFICIALS ONIY .., 2 5. Distribution of the energy by 1960 will be according to the following tables Mines and industries Electric traction Street lighting Trams and trolley buses Water supply Offices and shops Rural consumption Consumption by center, losses and misc. Grand total ? 14.3309000i006 300,000,000 200,000,000 200,000,00Q 1200000,000 750,0002000 230,000,000 870p00op0o0 79000,000,000 4 6. The-great Stejar hydroelectric center on- the Bistrita River, now called Vladimir Ilici Lenine, will have a'capacitY of 210,000 kws. The Izvorul Muntelui dam and lake Will produce 3000000 halo The thermoelectric power center of Filipestii de Padure and that of Doicesti will burn lignite. The thermoelectric power center of Petrossini in the Jim Vail'will burn second quality coal not used at all at present. It will produce 150,000 IniSo The thermoelectric center of Valisoara and the hydroelectric 'power center of Raul Mare will supply the coal industry of- the Jiu Valley. It will also supply the regions of Resita and Hunedoara, the Otelul Rosu industries, the Banat, and Southwestern Transylvania., 7, Of 139000 Rumanian villages less than a thousand have electric power. Two thousand are now to be supplied with power, commencing with the machine and tractor stations. kw/hrs ? 8. The following measures will be taken in putting the new plan into executions a. Creation of a factory for turbines at Resita. ..b. Development of the Vulcan factories at Bucharest to provide equipment for thermoelectric centers. c. Creation at Craiova of a factory to produce transformers and distributing equipment. d. Enlargement Of existing factories such as Electro Precizia at Satulung; Electro Motorul at Timisoara, and Dinamo at Bucharest. e.[ Enlargement of the meter factory Vestitorul. f. Erection of a low tension factory in Bucharest this year. g.. Establishment of a cable factory (isolated and nonpisolated). IL; Increase in number of capable workers from the existing 27,000 to 70,000 and training or discovery of more specialists and experts. ? 1. Comments The abbreviation Than is believed to be a European form' of ahrraWe're hours. ? ? SECRET/CONTROL . U.S. OFFICIALS ONLY ? . 50X1-HUM Declassified in Part - Sanitized Copy Approved for Release 2013/07/09: CIA-RDP82-00457R015100220009-8