OPERATIONAL ERB MEETING REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP88-00218R000300280008-6
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
34
Document Creation Date:
December 22, 2016
Document Release Date:
June 4, 2012
Sequence Number:
8
Case Number:
Publication Date:
December 17, 1987
Content Type:
MEMO
File:
Attachment | Size |
---|---|
CIA-RDP88-00218R000300280008-6.pdf | 1.23 MB |
Body:
(' Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
PROGRAM 520 ROUTING SLIP
S. CARPENTER
INITIAL ACTION REVIEW
B. EMRICH 2
D. ERICKSON --'
C. GRAHAM
M. JOHNSON
N
O
. J
NES ~r~ n~
N. PULLEY
J. RACZ .
J. SHIPLEY
W. STANBR IDGE -~~-
J. STAPLES
J. THOMAS
COMMENTS:
L Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
.MEMORANDUM FOR: Distribution
Chief, Headquarters Engineering Division, ESG
Jennifer Thomas
System Engineering Support, GE
Operational ERB Meeting Report
1. The Operational Engineering Review Board was held on 17 December:
1987 at 1330. See Attachment A for a list of attendees. See Attachment B
for the Agenda.
2. Two new DR's were discussed. See Attachment"C-for a description
3. The O/BRB reviewed ail the In Progress DRs. See Attachment D for
of these DRs. Two walk-on DRs were also discussed and are listed in
a description of those DRs. The status updates from the ERB are also
`incorporated.
4. Those MRs scheduled for update were reviewed. See Attachment E
Attachment C.
for the current status of all MRs.
5. Two new RFCs were discussed. See Attachment F for a description
`discussed. See Attachment G for the current status of all RFCs. -
Attachment F. Those RFCs in process and scheduled for update were
of these RFCs. Two walk-on RFCs were also discussed and`are listed in
.. 6. One new Action Item was reviewed. See Attachment H for the list
of Action Items remaining open.
7. The next Operational ERB is scheduled for Wednesday, 23 December
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04 :
SES-239-87
17 December 1987
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
u ti
SUBJECT: Operational ERB Meeting Report
8. Build Requests
Page 2
a. B. Pratt presented a Build Request, HU-BR -E-001-87, to
the O/ERB. This Build Request was presented to the 0/En for two
reasons. First, B. Pratt wanted to present a proposed solution to
complete DRs HU-DR -E-096-87, HU-DR -E-118-87, and HU-DR -E-197-87.
Secondly, B. Pratt wanted to propose that the 0/ERB begin using Build
Requests as a standardized means of documenting and approving the
installation of corrections to DRs and changes resulting from RFCs on
the AFS System.
b. The 0/ERB approved the proposed solution to complete DRs
HU-DR -E-096-87, HU-DR -E-118-87, and HU-DR -E-197-87. B. Hunter
requested that the proposed change to the Commo Operator SOP be
reviewed once more with the C/WSS to verify whether Commo Operator
messages should be sent to Slot 1 or Slot 2.
c. The 0/ERB discussed the proposal to begin using Build
Requests as a standardized means of documenting and approving the
installation of corrections to DRs and changes resulting from RFCs on
the AFS System. The purpose of the BR is to completely document the
corrections or changes to the AFS System, identify the DR(s) or
RFC(s) to be closed by the BR, provide red-lined documentation (if
any), provide change installation, verification, test, and backout
procedures, provide the results of pre-installation testing,
designate a change installation date approved by C/AFSB, and provide
for ERB Chairman approval of the BR package.
d. J. Visor noted that the AFS Forecast of Activities form
is currently being used incorrectly as a kind of Build Request, and
recommended that the use of BRs be implemented and that the AFS
Forecast of Activities form be used only as a tool for activity
scheduling. B. Hunter stated that he felt the ERB had not been
providing adequate feedback to the users on the correction of DRs and
the completion of RFCs. The identification of DRs and RFCs in the BR
and the identification of the BR in the DRs and RFCs will improve
feedback to the users by identifying the changes before they are
made, identifying when they will be made, and identifying which DRs
they are to correct.
e. The 0/ERB approved the implementation of Build Requests
to document the correction of DRs and the completion of RFCs. The
final format of the BR form will be developed by the 0/ERB as
experience dictates. The BR processing procedures also need to be
finalized by the 0/ERB, but initially BR processing procedures will
be as follows:
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
SUBJECT: Operational ERB Meeting Report Page 3
1) The O/ERB requires that the results of all approved
DRs or RFCs to the AFS System software, database, hardware,
facility, procedures or documentation baselines must be
documented on a Build Request.
2) BRs will be submitted to the O/ERB for each
resolved DR or RFC prior to implementation. A BR may contain the
documentation of more than one resolved DR or RFC.
3) The O/ERB will review BRs, verify priorities and
completeness, and authorize implementation of the results of all
approved DRs or RFCs to the AFS System.
Jennifer Thomas
Attachments
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
SUBJECT: Operational ERB Meeting Report
DS&T/FBIS/ESG/ADD/SES:NPulley:cg/733-5936 (17DEC87)
Distribution:
Original - C/ESG
1 - C/HED
1 - C/FED
1 - C/PROD
1 - C/ADD
ADD Staff
1 - C/AFSB
1 - C/OPS
1 - C/DRD/OPS
1 - C/WSS/DRD/OPS
1 - C/ME/DRD/OPS
1 - SAM/PROD
1 - SA/OPS
1 - W. Pratt, COTR
1 - LEC, Plainfield
1 - LEC, Reston
1 - GE/SES Staff
1 - GE/SES Chrono
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
O-ERB Attendees
B. Hunter
M. Tanigawa
J. Visor
A. Sellers
E. Brewer
J. Shipley
B. Stanbridge
C. Bestor
B. Yeakle
J. Cherry
B. Pratt
J. Thomas
D. Bernholz
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
ti
Discrepancy Report Agenda
New Discrepancy Reports
ATTACHMENT B
15 DECEMBER 1987
DR NO Status Priority Originator
CO-DR -E-084-87 New B
HU-DR -E-210-87 New B
Discrepancy Report Agenda
G. Guntandorf
L. Rose
15 December 1987
Discrepancy Reports in Progress
DR NO
Status
Priority Actionee
CO-DR -E-036-87
T/I
B E. Brewer/LEC
CO-DR -E-037-87
Open
B J. Fink/LEC
HU-DR -E-062-87
Open
B J. McGowan/HED
HU-DR -E-096-87
Open
B D. Higgins/LEC
HU-DR -E-107-87
Review
B D. Higgins/LEC
HU-DR -E-113-87
T/I
B B. Yeakle/HED
HU-DR -E-123-87
T/I
B D. Higgins/LEC
HU-DE -E-130-87
T/I
B D. Higgins/LEC
HU-DR -E-134-87
Open
B M. Tanigawa/ADD//B.H
HU-DR -E-143-87
T/I
B. D. Higgins/LEC
HU-DR -E-148-87
T/I
B LEC, ATEX
HU-DR -E-155-87
T/I
B D. Higgins/LEC
HU-DR -E-161-87
T/I
C B. Yeakle/HED
HU-DR -E-165-87
T/I
B E. Brewer/LEC
HU-DR.-E-167-87
Deferred
B D. Higgins/LEC
HU-DR -E-169-87
Deferred
B D. Higgins/LEC
HU-DR -E-197-87
Review
A LEC, D. Higgins
CO-DR -E-080-87
T/I
B E. Brewer/LEC
CO-DR -E-081-87
T/I
B E. Brewer/LEC
HU-DR -E-203-87
T/I
B D. Higgins
HU-DR -E-204-87
T/I
B E. Brewer
CO-DR -E-082-87
T/I
B
Modification Request Agenda
15 DECEMBER 1987
Modification Requests in Progress
MR NO
Status
Priority
Actionee
HU-MR -E-014-87
Open
C
LEC w/other analysis
HU-MR -E-015-87
Approval
B
B. Yeakle / ATEX
HU-MR -E-016-87
T/I
C
LEC/Xyvision
HU-MR -E-024-87
Approval
B.
K. Woodard
HU-MR -E-028-87
nnan
r
n a..,...._ iT n..
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Request for Change Agenda
New Requests for Changes
RFC NO Status Priority Originator
HU-RFC-E-035-87 New B
HU-RFC-E-036-87 New C
Request for Change Agenda
15 December 1987
~ME/DRD
16 December 1987
Request for Change in Progress
HU-RFC-E-014-87
HU-RFC-E-015-87
HU-RFC-E-017-87
HU-RFC-E-019-87
Status
Deferred
Open
Review
Deferred
Priority
C
C
B
C
Actionee
LEC
Xyvision, LEC
LEC
LEC
HU-RFC-E-020-87
HU-RFC-E-023-87
HU-RFC-E-024-87
HU-RFC-E-026-87
CO-RFC-E-005-87
Pending
T/I
Installt'n
Pending
T/I
B
C
B
A
B
LEC
B. S
Best
LEC/
LEC,
tanbrid
or,Sy,D
John Sc
John K.
ge.
ick,LEC
ott
& Ed B.
HU-RFC-E-028-87
CO-RFC-E-006-87
T/I
D
l
B
LEC
HU-RFC-E-027-87
eve
opmnt
T/I
B
B
C/H
HU-RFC-E-029-87
Deferred
B
VKathy
HU-RFC-E-030-87
HU-RFC-E-033-87
Approval
Deferred
B
B
B. Y
John
eakle
W., LE
C
ADD LEC
AI NO AI NO ORG.
-------- --------
TERBO13
ACTIONEE
--------------------
J. Shipley/SES
STAT
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
Discrepancy Report
Problem Identification:
Install New Version Of TELEX Driver
DR Number: CO-DR -E-084-87 Submit Date:
Problem Date: 12-09-1987 Problem Time:
ATTACHMENT C
12-12-1987 Category: I
1400ZGMT Priority: B
System: HUCF
Hardware Configuration:
Software Configuration:
Database:
Procedure:
Affected Documents:
Title:
Scenario:
Prior Operations:
Subsystem: VAX Commo Segment
Model #:
Serial #:
Application: PTELXPRVR.PAS
Version:
Location: Reston, VA.
Originator: G. Guntendorf Phone:
9 121
Approval for Submittal: Wire Service Date: 12--1212--1987
87
Problem Description:
Embedded TELEX messages did not get passed. and to
from RCA. gged into system when received
Analysis:
The TELEX driver did not recognize the EOM and SOM character set for the 2nd and
subsequent message on a receive of mail from TELEX.
Corrective Action:
Added code to trap for the different EOM/SOM character sets from RCA so messages
are passed correctly.
References/Documentation:
Impact: Possibly loss of message in TELEX.
Related Problems:
Action Completed By: E. Brewer/LEC
Status: T/I Date Due: 12-30-1987
Status Msg: Check for another variation.
Approval:
Date Closed:
Actionee:
E. Brewer/LEC
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
Discrepancy Report
Problem Identification:
VAX Insufficient Virtual Memory Error
DR Number: CO-DR -E-085-87 Submit Date: 12-09-1987
Category:
Problem Date: 11-03-1987 Problem Time: 0322ZGMT
Priority:
B
System: VAX
Subsystem:
Hardware Configuration:
8600 Model #:
Serial #:
Software Configuration:
VAV/(1UC I.
c
Database:
Procedure:
Affected Documents:
Title:
-YFL4c4L10n:
Version:
Scenario: Location:
Prior Operations:
Originator: M. Jackson Phone: (703)733-5977
Approval for Submittal: Date:
Problem Description:
Unexpected symbiont process termination. Insufficient virtual memory error.
Switched over from AFS1 to AFS2 and system ran fine.
Analysis:
DEC SPR 15.30.17 pertains. But symbionts do not correctly relaese virtual memory
as they run. This phenomenon is directly related to the number of print
requests the machine processes ad hoc.
Corrective Action:
This failure will usually only be observed after 8 to 10 days of continuous
operation and was masked by weekly switchovers. STOPFBIS/STARTFBIS should clear
the problem when it occurs.
References/Documentation:
VAX/VMS systems dispatch July 86,VAX/VMS dispatch cumulative index for
Impact:
Related Problems:
Action Completed By:
Approval:
Status: Closed Date Due: 12-17-1987 Date Closed: 12-17-1987
Status Msg: People must monitor symbiont. Documentation Actionee:
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
Discrepancy Report
Problem Identification:
Editable Files Included Previously Published Files
DR Number: HU-DR -E-210-87 Submit Date:
Problem Date: 12-10-1987 Problem Time:
System: HUCS
Hardware Configuration:
Software Configuration:
Database:
Procedure:
Affected Documents:
Title:
Scenario:
Prior Operations:
Category: I
Priority: B
Subsystem: ATEX
Model #:
Serial #:
Application:
Version:
Location:
Originator: L. Rose Phone: (703)733-6438
Approval for Submittal: D. Bernholz Date:
Problem Description:
Editable file directory of NEA report included filenames of files previously
published and no longer in NEAD-PUB queue. 12-17-87: Recurrence of extraneous
material in editable file dir. tac reprt had "tactest" in its file--not a
legitimate file
Analysis:
Problem recurred on Dec. 14 at one work station only.
Corrective Action:
K. 'Woodard deleted directory, pubs sent files back through spooler, and report
was successfully built. 12-17-87: Bonnie, Kathy informed. They deleted file &
pubs started over.
References/Documentation:
Impact: If this can happen, pubs has to be constantly on alert to number of files
in a report. 12-17-87: This third recurrence in two working days. Holds
up report production. 12-17-87 No impact operationally.
Related Problems:
Action Completed By:
Status: T/I note n..,.. ,n
Status Msg: ---_______
Approval:
Date Closed:
Actionee:
B. Yeakle/HED
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
Discrepancy Report
Problem Identification:
File Messages Sent To Wrong Queue
DR Number: HU-DR -E-211-87 Submit Date:
Problem Date: 12-04-1987 Problem Time:
System: HUCS
Hardware Configuration:
Software Configuration:
Database:
Procedure:
.Affected Documents:
Title:
Scenario:
Prior Operations:
12-04-1987 Category: I
0318 Priority: B
Subsystem: ATEX
Model #:
Serial #:
Application:
Version:
Originator: Dines Phone: (703)733-6483
Approval for Submittal: D. Bernholz/PROD Date: 12-09-1987
Problem Description:
All of these file messages were in the EE3-ELA queues in the a.m.on DEC 7. None
of the items were in the queue, nor should they have been, as they belong in the
NEA queue. The items appeared in NE11 in p.m. on 4 Dec . This in the proper
distribution CONT
Analysis:
CONT destination queue. The items were sent on 2 Dec.
Corrective Action:
References/Documentation:
Impact:
Related Problems:
Action Completed Byt
Approvall
Status: New
D
t
D
S
a
e
ue: 12-17-1987
Date Closed:
tatus Msg: ----------
Actionee:
D. Higgins/LEC
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
DISCREPANCY REPORT STATUS
.CTACIL LEL;T D
15 DECEMBER 1987
15
DR # SUBMISSION DATE PROBLEM IDENTIFICATI
ON
CO-DR -E-036 09-02-1987 VAX/ATEX Link Error
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
E. Brewer/LEC Approve B 12-30-1987
DESCRIPTION
Read errors on ATEX to VAX transitions for both A and B links randomly.
ERB COMMENTS
Work through scheduling process. Do when have ATEX backup.
Still have read errors. Performed 1st step of DEC recommendations. Testing
12-05-87 p.m. This step has minimal impact.
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
CO-DR -E-037 09-01-1987 Dedicated Line Black Box Does
Not Pass "Pinkie Code" Chars.
ERB ACTION
Waiting for a response from Black Box.
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
J. Fink/LEC Open B 12-30-1987
DESCRIPTION
The "Black Box" BAUDOT to ASCII converter does not pass the 'Pinkie-Code'
characters.
ERB COMMENTS
Translation code to accomodate PROM chip to be done by 13 Nov. Black Box still p
PROM chip from Black Box still causing problems, mis-translation of hyphen (-)
to ?. Need to redue the translation table to accomodate the chip. LEC s/w is to
be fixed. To be done by 13 Nov. Still not passing Pinkie Code.
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
CO-DR -E-080 11-18-1987 TELEX Messages Have Blank
Lines Removed
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
E. Brewer/LEC T/I B 12-30-1987
DESCRIPTION ,
Blank lines are removed from incoming TELEX messages.
ERB COMMENTS
Still in progress. E. Brewer to remove blank lines.
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
DISCREPANCY REPORT STATUS
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
CO-DR -E-081 11-18-1987 TELEX One-Up Number Not
Incremented
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
E. Brewer/LEC T/I B 12-30-1987
DESCRIPTION
The TELEX one-up number is not being incremented. (Still at 1 on startup.)
ERB COMMENTS
Still in progress.
DR #
HU
DR
SUBMISSION DATE
PROBLEM IDENTIFICATION
-
-E-062
08-28-1987
Fiber Link 'C' Would Not
Activate.
ERB ACTION
ACTIONEE
J
STATUS
PRIORITY
DATE DUE
DATE CLOSED
. McGowan/HED
Open
B
12-30-1987
DESCRIPTION
Fiber link "C" would not activate. Xyvision personnel notified LEC. PM 27
August link is still down.
ERB COMMENTS
Spare modem ordered 10/2. Still waiting.
8/27/87 Appended to add: J. McGowan (AFS-B) is working with the link withOlT
while Xyvision software is being examined on the system side.
DR #
SUBMISSION DATE
PROBLEM IDENTIFICATION
HU-DR -E-096
09-23-1987
Priority Items Arriving Late
And Not Advising Of Immediates
ERB ACTION
ACTIONEE
D
i
STATUS
PRIORITY
DATE DUE
DATE CLOSED
. H
ggins/LEC
Closed
B
12-17-1987
DESCRIPTION
WSS slot duty officer notes that priority items (incoming) arriving @2 hrs late
and system not advising of incoming immediates. Data Center advises there is a
backup of @140 items in the incoming queue and they will arrive slowly. An
immediate cont'd
ERB COMMENTS
Part closed to HU-BR -E-001-87. Other part closed to HU-DR -E-158-87.
Recommendation due 11/19/87 from LEC in regards to possible RFC. Related to
HU-DR-E-87-066, 118, 197.
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
DISCREPANCY REPORT STATUS
DR #
SUBMISSION DATE
PROBLEM IDENTIFICATION
HU-DR -E-107
09-24-1987
Imbalance Between Mirrored
Systems
ERB ACTION
ACTIONEE
D
Hi
STATUS
PRIORITY
DATE DUE DATE CLOSED
.
ggins/LEC
Open
B
12-30-1987
DESCRIPTION
1) After running SYSVER, the number of items needing correction is more numerous
than would be expected under normal operations. 2) After running maintenance,
certain queues do not accurately mirror their twins.
ERB COMMENTS
Delores to look at.
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
HU-DR -E-123 10-02-1987 H4 Function Intermittenly Read
By Xyvision
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
D. Higgins/LEC T/I B 12-30-1987
DESCRIPTION
The XYVISION code "H4" is being read intermittently by the system. Sometimes the
item is centered correctly, sometimes the item is flush left.
ERB COMMENTS
Delores to investigate.
Delores to see if looking under Xyvision. There are two formats. Can we add a
third? If so then an RFC must be generated.
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
HU-DR -E-130 10-02-1987 Missing Reuters Items
ERB ACTION
Combined HU-E-191, 137.
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
D. Higgins/LEC T/I B 12-30-1987
DESCRIPTION
Part of text is missing from Wire REUTER ATEX file. Reuter items chopped off
words and pages. Files affected:
X75RE04,X756RE04,X755RE04,X741RE04,X739RE04,X738RE04 &-many more. Wire Reuter
queue displayed no items between 0657-1155 GMT. WDO (cont.)
ERB COMMENTS
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
DISCREPANCY REPORT STATUS PAGE: 4
Waiting for response.
Can't recreate the problem. Track for more data. Reuters is un-reliable and
the problem maybe from outside the building.
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
HU-DR -E-134 10-05-1987 Need Rules For Measuring
Graphics For Xyvision
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
M. Tanigawa/ADD Open B 12-30-1987
DESCRIPTION
Prod needs to provide the IOs and ICs with rules to measure graphics to be
included in the Atex pick statement to be used by Xyvision.
ERB COMMENTS
Order sent to P&PD. Waiting supply from P&PD.
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
HU-DR -E-143 10-05-1987 Spiked Items Show Up In
Another Group
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
D. Higgins/LEC T/I B 12-30-1987
DESCRIPTION
Items were spiked from various sections of the East Europe Daily Report (book
2). When the editor in section 4H (Malaysia) built a directory, it contained 33
items spiked from East Europe and 3 out of the 8 items that should have been in
the 4H contd
ERB COMMENTS
Evaluate and investigate with the overall examination. Lightburn review.
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
HU-DR -E-148 10-08-1987 Wrapping Of Incoming Field
Messages
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
E. Brewer/LEC T/I B 12-30-1987
DESCRIPTION
Various incoming field messages "wrap" both in hard and soft copy, making it
very difficult to read in on traffic. Examples attached.
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
DISCREPANCY REPORT STATUS PAGE: 5
ERB COMMENTS
Msg not thru docking, need 69 char./line. Match w/other DRs re:same. Oper know w
SOLUTION: This is a problem in marking the text in the tsbles to flag for not
word wrapping. The 2nd part of the problem stems from the line differences btwn
VAX & ATEX & automatic wrap in ATEX. No good solution is available,but problem
is being inv
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
HU-DR -E-155 10-14-1987 Files Not Going Through The
Spooler
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
D. Higgins/LEC Test B 12-30-1987
DESCRIPTION
Items fetched from the Daily Report Discard Queue and renamed with letters in
the filename create errors when the DOCBUILD function is used.
ERB COMMENTS
Linda to run test.
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
HU-DR -E-161 10-15-1987 Xyvision Not Balancing Columns
ERB ACTION
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
B. Yeakle/HED T/I C 01-07-1988
DESCRIPTION
After merging Daily Report text divisions and composing, Xyvision would not
balance columns across the bottom. The divisions did balance before they were
merged. Ed Spence, Xyvision made a copy of the data base and has sent it to
Xyvision Hqs. for ck.
ERB COMMENTS
Waiting response from Xyvision, working the problem.
Bonnie called Xyvision. They were unable to find any info. on problem.
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
HU-DR -E-165 10-15-1987 Reference Lines Wrap
ERB ACTION
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
E. Brewer/LEC Closed B 12-17-1987 12-17-1987
DESCRIPTION
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
DISCREPANCY REPORT STATUS PAGE: 6
When items come in with more than one reference, they are wrapped together,
making it very hard to determine the second and succeeding references. See
attached example.
ERB COMMENTS
Documentation is attached. Recommend for closure.
Currently "REF:" is in block form, if multiple references are entered as
seperate line items this may correct the problem. AUTODIN, ATEX, and VAX have
different screen lengths - may be a system problem.
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
HU-DR -E-167 10-16-1987 Partial Directory Build On The
AUTODIN Retrieval Queue
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
D. Higgins/LEC Open B 12-30-1987
DESCRIPTION
Branch Chief attempted to build an operational messages AUTODIN directory
retention queue on system 4. The directory ended at 48 items. The last item in
the directory was a DAN with the end of file mark immediately after the DAN.
ERB COMMENTS
User to revauluate problem. May be closed later.
Need to check documentation and instruct users. There are two ways to build -
the new way on the original key and the old way on a new key. Need to check
with Bonnie for verification and documentation.
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
HU-DR -E-169 10-16-1987 Batch Append Failure
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
D. Higgins/LEC Open B
DESCRIPTION
Batch append used to be reliable for 6 to 8 items. It is now not reliable for as
few as 3 items. Reliable means all the items are appended in the right order
with nothing missing in the items.
ERB COMMENTS
APE issue.
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
HU-DR -E-197 10-30-1987 Resolve Problem Of Slot
Missing Flash Notification
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
DISCREPANCY REPORT STATUS PAGE: 7
DR's HU-066,HU-118 reviewed and combined into this DR.
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
LEC, D. Higgins Closed A 12-17-1987 12-17-1987
DESCRIPTION
When ATEX receives an incoming flash(Z) or immediate (0) msg, the batcher
broadcasts to SLOT1 that the msg is incoming. If SLOT1 has at the same time, a
msg pending or a system generated msg, the broadcast is overwritten and not seen
by SLOT1 editor.
ERB COMMENTS
Closed to HU-BR -E-001-87.
FLASH precedence sorted alphanumerically. Changed Z to 1Z so it will be at top
of sort. Visual alert failed when terminal was busy w/other process. Visual
alert will follow completion of other process. Report on 11/19/87 by LEC for
possible RFC.
DR #
SUBMISSION DATE
PROBLEM IDENTIFICATION
HU-DR -E-203
11-24-1987
Information In Wrong Queue
ERB ACTION
ACTIONEE
STATUS
PRIORITY
DATE DUE
DATE CLOSED
D. Higgins
T/I
B
12-30-1987
DESCRIPTION
At 0745 on 24 November editor on terminal 3:12 called up directory of 3R-3. The
directory included items from the OF-0 queue. When those items from OF were
called in the 3R directory, the "UNAUTHORIZED ACCESS" message was displayed.
ERB COMMENTS
See if re-create problem. Bonnie to help.
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
HU-DR -E-204 Observed An Alert On LA120
DECWriter Console But Not On
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
E. Brewer Closed B 12-17-1987 12-17-1987
DESCRIPTION
Observed an alert on LA120 \\decwriter console but not on the VAX terminals.
The alert was--PDERLNDRV non-existent, check the P List and it was there.
ERB COMMENTS
Closed as one time occurrance.
Possible one time occurrence. Requires further investigation.
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
DISCREPANCY REPORT STATUS 17 December 1987
DR # SUBMISSION DATE PROBLEM IDENTIFICATION
HU-DR -E-113 09-24-1987 DRD Table Of Contents Queue
Needed
ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED
B. Yeakle/HED Complete B 12-10-1987
DESCRIPTION
DRD Books have a TOC-DR queue (for book tables of contents). Requirement was for
TOC-DR queue to hold 30 days worth of DR TOC's. As of yet these queues have yet
to be activated and populated by XYVISION folks.
ERB COMMENTS
Bonnie to write recommendation. Bonnie to coordinate with B. Hart.
Solution's on the system but need Xystrip tape problem solved before the
information can be entered into the queue as part of nightly maintenance
function. Workaround: Maybe distribute 410 pgs of laser proof per day or read
Xystrip tape back to ATEX?
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
MR Status Report
ATTACHMENT E
.18 December 1987
MR NO
PRIORITY
CO-MR -E-001-87
TITLE
Change Restart
DATE LOGO
DUE DATE
11-04-1987
ORIGINATOR
ACTIONEE
E.L. Brewer
Closed
C
Procedure To Prevent
12-03-1987
LEC Ed Brewer
Change implemented 29 October 1987,
Error On Restart Of
1400. Testing 11/07/87, 0900-1100.
CO-MR -E-002-87
Desire Multiple
11-17-1987
S. Breft
Closed
B
Print Of ADMINS
11-19-1987
LEC
Completed 14 Nov. 1987
CO-MR -E-003-87
TELEX Messages Have
11-30-1987
G. Gutendorf
Complete
B
NBR Vice Pound Sign
Change made. Awaiting documentation.
CO-MR -E-004-87
TELEX Message End
11-30-1987
G. Gutendorf
Open
B
12-24-1987
E. Brewer
Change identified, to be made to source
CO-MR -E-005-87
Provide Automatic
12-08-1987
E. Brewer/LEC'
code.
B
CO-MR -E-006-87
Print Of 2nd Copy
For ADMIN's
New Terminal
12-09-1987
E. Brewer/LEC
E. Brewer/LEC
Complete
B
Interface For
12-10-1987
E. Brewer/LEC
Software changed to retain latest
CO-MR -E-007-87
Transmitters
TELEX Poll On Sign
12-10-1987
G. Gutendorf/HED
version of msg. Problem solved.
Complete
B
On
12-24-1987
E. Brewer/LEC
There is no documentation associated
CO-MR -E-008-87
Modify PVALOUT For
12-14-1987
Wire Service
with this MR. Recommend closure.
New
B
Trend Article
12-17-1987
E. Brewer
No documentation changes. Recommend for
HU-MR -E-001-87
New JPRS Directory
09-17-1987
O. Bernholz
closure.
Complete
A
09-30-1987
Awaiting documentation.
HU-MR -E-002-87
Add "FBIS" As Start
09-18-1987
WSS State/INR Murphy
Complete
C
Of Msg To WSS ALL
LEC, E. Brewer
Change is in, 4 line "all clear" msg.
CLEAR
HU-MR -E-005-87 Automatic Spike Of
08-05-1987
Ops Wire Service
Closed
C Transmitted Items.
12-10-1987
LEC
Cannot put in commands to delete files.
Rec. Closure
12-10-87
HU-MR -E-006-87 Wire Editors
07-29-1987
Ops Wire Service
.
Closed
C Manually Inserting
12-03-1987
W. Stanbridge
Ref: RFC-036.
Extra "Quad Lefts".
HU-MR -E-007-87 Limit Spiking Rights
08-21-1987
SA/Ops J. Berthiaume
Closed
HU-MR -E-008-87 Edit Check Mode Does
08-21-1987
SA/Ops J. Berthiaume
This MR requires no change to be made.
Closed
C Not Allow XYCODE
12-10-1987
LEC, J.S.W.
ATEX does not do. Procedural workaround
Insert.
in place. Higgins to call ATEX to conf
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
MR Status Report
MR NO TITLE DATE LOGO ORIGINATOR
PRIORITY DUE DATE ACTIONEE
HU-MR -E-009-87 Missing Coordination 09-18-1987
B Review Staff Queues
HU-MR -E-010-87 DRD Additional Laser 09-24-1987 B. Hart/DRD ME
B Printer Stanbridge
Requirements.
HU-MR -E-011-87 ATEX Priority 09-28-1987
A Sequencing 09-24-1987
Complete
Corrected logons for correct access.
Closed
This MR is being submitted as an RFC to
the CCB.
Complete
Modification to the ATEX System.
HU-MR -E-012-87 ATEX Message 09-28-1987 Complete
A Processing Procedure 09-24-1987 Internal priority lvl change to ATEX
s/w. Not to the customers.
HU-MR -E-013-87 Addition Of Option 09-29-1987 Complete
A Menus To Cache 09-29-1987 W/option menus, reduced system jumping
Memory from 1 to 2.
HU-MR -E-014-87 DRD Read-In Capab On 09-30-1987 ~~ Open
C WSS Directories 01-07-1988 LEC w/other analysis Still in Progress.
HU-MR -E-015-87 DR Programmable Keys 10-01-1987 Doug Hayes ATEX
B 12-30-1987 B. Yeakle / ATEX
HU-MR -E-016-87 Tabular Material 10-05-1987 B. Hart
C Header 01-07-1988 LEC/Xyvision
HU-MR -E-017-87 Batching Routine 10-05-1987 A. Sellars
C Time Stamps 10-22-1987
HU-MR -E-018-87 Dissimilarity 10-20-1987 L. Rose
C Between Names Of 01-07-1988 D. Higgins/LEC
Queues And Spooler
HU-MR -E-019-87 DR Programmable Keys 10-20-1987 J. Berthiaume
8 Error 12-03-1987 LEC/ATEX
HU-MR -E-020-87 Quad Left After End 10-21-1987 E. Brewer
C Of Text Marker To E. Brewer
ATEX
HU-MR -E-021-87 MEB Editors Need 10-28-1987 L. Rose
B Full Edit Access To 12-10-1987 LEC, APE Analysis
DISCRD-DR Queue.
HU-MR -E-022-87 Retention Of ATEX 10-30-1987 D. Bernholz
B Default Queues 11-05-1987
Approval
Approved for implementation.
T/I
Higgins to discuss with xyvision
compositors for recommendation.
Complete
Completed per A. Sellars.
Open
Develop consistencies. Input from
HU-DR-E-153-87. Pending resources to
Closed
BIG problem, labor intense work-around.
Doug is working. Close this DR to HU-OR-
Complete
Problem fixed on 10/14/87.
Closed
Withdrawn 12-10-87.
Closed
Being monitored to see if 5 day
retention period is too long.
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
MR Status Report
MR
NO TITLE
PRIORITY
DATE LOGO
DUE DATE
ORIGINATOR
ACTIONEE
---------------
--------------------
---------
HU-MR -E-023-87
Relocation Of
11-04-1987
Complete
B
Terminals
11-05-1987
Completed 11/6/87.
STAT
HU-MR -E-024-87
Change {h3}, {h4}
11-04-1987
L. Rose
Approval
8
Codes To Change
Bolding Size
12-30-1987
K. Woodard
Approval for implementation for Kathy to
coordinate.
HU-MR -E-026-87
New Phone Number For
11-09-1987
D. Lehman DC/WSS
Complete
B
WSS Contact
11-12-1987
Kathy W.
Completed on 11/6/87
HU-MR -E-027-87
Insert Bolding On
11-19-1987
LEC APE E. Brewer
Complete
B
VAX Vice ATEX
12-10-1987
D. Higgins/LEC
Recommend this MR be reassigned to D.
Higgins for final action.
HU-MR -E-028-87
Remove DOC Function
11-19-1987
LEC APE E. Brewer
Open
C
For Outgoing ATEX To
VAX Files
12-30-1987
E., Brewer/LEC
VAX side to be worked.
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
Request for Change
ATTACHMENT F
Title: Directories On Book Codes Are Often Inaccurate
RFC No
HU
RF
.:
-
C-E-035-87
Contract No.: 85X-102-200-000
Date Logged: 12-04-1987
Priority: C
Proponent of RFC:
Approval for
Submittal:
Originator:
MME/DRD
Telephone Number: (703)7336-013
Affected Documents:
Title:
Need for Change:
When a DRD book
book, hitting tl
he/she sent to t
that includes th
files sent by tht
Editor 5A hits pi
my single letter divisions on his/her
.1 up specialized directory of just what
ueues, actually calls up a directory
double letter divisions. For example,
and that directory includes
Lu call up a directory of what 5A sent to DISCRD
what 5AA sent to DISCRD.
Description of Change:
T/I showed that ATEX is working correctly. This requires research to design new
procedures to fulfill customer requirements.
Cost/Schedule Impact:
Board Comments:
Status: Open Due Date: 01-07-1988 Actionee: B. Yeakle/HED
Status Msg: Opened as result of non-discrepant closure of HU-DR-E-112-87.Vork when
Date Closed:
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
Request for Change
Title: Multi Take Procedure Can Not Be Handled By The Menu.
RFC No.: HU-RFC-E-036-87 Contract No.: 85X-102-200-000
Need for Change:
Multitake procedure cannot be handled by the menu (such information placed in
the menu will appear above, and not below, the headline). Editors must manually
key take information into the proper place. Editors have to enter this
information manually
in any event. ATEX procedures are more time consuming and allow for more human
error.
Date Logged: 12-04-1987
Priority:
C
Proponent of RFC:
Approval for Submittal:
Date:
Originator: C/WSS
Telephone Number:
.
Affected Documents
.
Title:
Description of Change:
To make AFS menu work the same as MIDAS an investigation by ATEX System
Administrator would be required.
Cost/Schedule Impact:
Date Closed: Result:
Board Comments: This change can't be done, but JP-RS-wants the
change anyway. Need to know difference between
MIDAS and AFS. B. Pratt to take to Alison. To tell
her that 0-ERB recommends disapproval.
Status: Open Due Date: 01-07-1988 Actionee: B. Pratt/ADD
Status Msg: Opened as result of non-discrepant closure of HU-DR-E-011-87.12/17- Pratt
Date Closed:
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
Request for Change
Title: BENT PIPE Message Reconfiguration
RFC No.: HU-RFC-E-037-87 Contract No.: 85X-102-200-000
Date Logged: 12-17-1987 Priority: B
Proponent of RFC: GE/SES
Approval for Submittal: C/ESG Date: 12-01-1987
Originator: Telephone Number: (703) 733-5954 SIAI
Affected Documents:
Title: FBIS System Specification Number: MFD-900-OO1C
HUCS Functional Specification Vol LEC DOC NO 23103124
1HUCS Concept of Operations LEC DOC NO 23103152
Need for Change:
See Attached
Description of Change:
See Attached
Cost/Schedule Impact:
Date Closed: Result:
Board Comments:
Status: Deferred Due Date: 12-17-1987 Actionee: J. Racz/GE
Status Msg: Forward to CCB for approval.
Date Closed:
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
Request for Change
Title: ATEX Terminal Relocation For Production Group
RFC No.: HU-RFC-E-038-87 Contract No.: 85X-102-200-000
Date Logged: 12-17-1987 Priority:
Proponent of RFC: D. Bernholz/PROD
Approval for Submittal: B. Hunter/HED Date: 12-17-1987
Originator: J. Staples/GE Telephone Number: (703)733 -5951
Affected Documents:
Title: Number:
Need for Change:
ATEX terminal is needed more in the Production Group's Science Center than in
its present location (c/JPRS).
Description of Change:
1. Disconnect ATEX terminal in room 1S15B (cable 151) 2. Relocate ATEX terminal
in room 1N34. 3. Connect ATEX drop in room.1N34D (cable177) to ATEX system.
4.Install conduit in wall
between 1N34 and 1N34D. 5. Run ATEX terminal
cable through conduit and connect to ATEX drop in room 1N34D.
Cost/Schedule Impact:
Date Closed: Result:
Board Comments:
Status: Approval Due Date: 12-30-1987 Actionee: J. Staples/GE//LEC
Status Msg: Do assessment.
Date Closed:
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
RFC Status Report
ATTACHMENT G
18 December 1987
RFC NO TITLE
PRIORITY
CO-RFC-E-001-87 Additional VAX
DATE LOGO
DUE DATE
07-23-1987
ORIGINATOR
ACTIONEE
G. Gutendorf
B Terminal For
LEC
Computer Center
CO-RFC-E-002-87 AFP & REUTER
08-20-1987
SA/OPS J. Berthiaume
Closed
A Printers For WSS
09-03-1987
S. Kayback/ADD
Sy is checking on a printer for Wire and
AG. Will be reviewed in 9/4 staff mtg.
CO-RFC-E-003-87
09-01-1987
Complete
B
11-19-1987
E. Brewer/LEC
Completed 13 November.
CO-RFC-E-004-87
Use Of BFN For ATEX
09-30-1987
W. Pratt
Approval
B .
File Name.
12-24-1987
LEC, Plainfield
OPS supports, RFC will impact other
segments throughout sys. Working, User
CO-RFC-E-005-87
Reposition Check
10-02-1987
J. Berthiaume
T/I
B
Numbers On ADMIN
12-03-1987
E. Brewer/LEC//J.K.
Recommend withdrawl. Change will come
CO-RFC-E-006-87
Messages
Alternate Wire
10-07-1987
automatically with format change.
Open
B
Capability On VAX
12-30-1987
J. Cherry/HED
Joel and Mal to talk.
FS-RFC-C-001-87
Update To The Field
10-23-1987
STAT
HC-RFC-C-001-87
Bureau Segment
Deletion Of The HCS
10-19-1987
M. Tanigawa
HC-RFC-C-002-87
Menu Driven
Requirement
Increase In
10-19-1987
M. Tanigawa
HC-RFC-E-001-87
Classified
Workstation Count
PBX / VAX Test Bed
10-07-1987
Closed
B
Environment
11-05-1987
E. Brewer, LEC
Test plan is with Temporary
STAT
HU-RFC-C-001-87
Increase In The
10-19-1987
M. Tanigawa
test, 10/29/87. Remove after test.
Number Of JPRS ATEX
Workstations
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
RFC Status Report
RFC NO TITLE
PRIORITY
HU-RFC-C-002-87 FBIS Operational CM
DATE LOGO
DUE DATE
10-23-1987
ORIGINATOR
ACTIONEE
W. Stanbridge
Plan Appendices
HU-RFC-C-003-87 Additional ATEX
10-30-1987
W. Stanbridge
Terminals And Laser
Printers
HU-RFC-C-018-87 Change Which
08-14-1987
SA/Ops J. Berthiaume
Pending
Messages Are Sent To
CCB
CCB meeting and presentation.
Wire Service Select
HU-RFC-E-003-87 AFS Modem Closet
06-26-1987
D. Erickson
Complete
Relocation
09-17-1987
Action completed, documentation update
required.
HU-RFC-E-004-87 Additional
06-26-1987
A. Coffin
Complete
B Shaftstall Input
12-17-1987
ESG
Update documentation.
Device And Model
HU-RFC-E-005-87 Wire Log
07-21-1987
W. Pratt
Closed
07-30-1987
SI
Withdrawn by the proponent.
HU-RFC-E-006-87 Wire Service
07-21-1987
W. Pratt
Approval
A Numbering
12-24-1987
LEC
Requires VAX change. LEC proposes 1
month each for RFC & Documentation.
HU-RFC-E-007-87 Wire Editor Log-On
07-21-1987
W. Pratt
Closed
B
07-30-1987
SI
Withdrawn by the proponent.
HU-RFC-E-008-87 Wire Log Book Codes
07-21-1987
D. Lehman
Complete
B
07-30-1987
LEC
Any changes to necessary documentation
HU-RFC-E-009-87 WSS Header Menu
C. Hersh
needs verification.
Closed
HU-RFC-E-010-87 AFP/Reuters Wire
07-23-1987
W. Pratt
Supporting Documentation for
HU-RFC-E-006-87. DR Rejected.
Complete
B Service
07-30-1987
Ops
VERB approved for implementation.
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
? L
FBIS
RFC Status Report
RFC NO TITLE
DATE LOGO ORIGINATOR
HU-RFC-E-011
87
-----------------------------------------
-
AFP/Reuters Wire 07-23-1987 W. Pratt
B
Complete
Services 07-30-1987 Ops
T/ERB approved for implementation.
HU-RFC-E-012-87 Wire Log-On Queue 07-23-1987 C. Hersh
Closed
OBE, queues are switching
HU-RFC-E-013-87 Wire Service Message 07-24-1987 SA/OPS J.Berthiaume
.
Closed
Header Change C. Bestor/DRD
The TO ALL" line was removed from
HU-RFC-E-014-87 Wire Service 07-24-1987 Sa/Ops J. Berthiaume
C
outgoing numbered and unnumbered WSS
Open
Programmed Keys 01-07-1987 D. Higgins/LEC
Related to HU-DR-E-012-87. Delores to
take to Alison to review
HU-RFC-E-015-87 Additional Disk 08-04-1987 W. Pratt
C
.
Open
Drives For Atex And 01-07-1988 Xyvision, LEC
Xyvision.
HU-RFC-E-016-87 Log Ons And Password 08-06-1987 SA/OPS J.Berthiaume
B
J. W. has contract to get hard drives
from Xyvision.
Closed
Protection For DRD LEC/ATEX
Password protection for 0 logons is in
delete function. Fold RFC into HU-DR-E
HU-RFC-E-017-87
B
Daily Read-In By 08-06-1987 SA/Ops J. Berthiaume
-1
Closed
Managing Editor. 12-17-1987 LEC
Withdrawn by originator.
HU-RFC-E-019-87
C
New Queues And Extra 08-14-1987 J. Berthiaume
Deferred
Copies For DRD QA. 01-07-1988 LEC
Review with Alison.
HU-RFC-E-020-87
B
Daily Report Reading 08-19-1987 SA/OPS J. Berthiaume
Pending
Access To Wire 12-30-1987 LEC
Review with Alison
HU-RFC-E-022-87
A
Queues
Wire Service End Of 08-20-1987 J. Berthiaume/OPS
.
Complete
HU-RFC-E-023-87
C
Message (EOM) 08-21-1987
Sequence
Additional Large Key 09-17-1987 SAM/PROD
Procedure PWSSGATE changed to add NNNN
to all outgoing WSS items.
Approval
Board 01-07-1988 B. Stanbridge./GE
Basic RFC approved. J.S. Williams to
look at spares and give
U-RFC-E-024-87
Hardcopy Requirement 09-24-1987
STAT
H
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
RFC Status Report
RF
C NO TITLE
PRIORITY
B For AFP And
DATE LOGO
DUE DATE
12-30-1987
ORIGINATOR
ACTIONEE
Bestor.Sy,Dick,LEC
STATUS
Being installed. Charles to check with
Harrold to make sure aware of potential
HU-RFC-E-025-87 ATEX Performance
10-01-1987
~
Closed
STAT
B Data Gathering
11-05-1987
B. Yeakle/HED
Closed to HU-RFC-E-027
HU-RFC-E-026-87 ATEX Retention
10-01-1987
W. Pratt
Pending
12-23-1987
LEC/John Scott
HU-RFC-E-027-87 WS Design Analysis
10-09-1987
Closed
STAT
B Experiments
12-17-1987
LEC/ATEX
Withdrawn by originator.
HU-RFC-E-028-87 PROD Needs
10-08-1987
L. Rose
T/I
B Additional Centering
12-30-1987
B. Yeakle/HED
Coordinate change made with Plainfield
Function
for impact consideration.
HU-RFC-E-029-87 DOCBUILD FOR
10-28-1987
A. Usaty
Open
B CRS-COMPILED REPORTS
12-30-1987
Bonnie and Alison to review
STAT
.
HU-RFC-E-030-87 ATEX Internal
11-04-1987
B Yeakle
K Woodward
Open
B Changes
HU-RFC-E-031-87 $PR1 & $PR2 Batchers
11-03-1987
,
J. Cherry
Related HU-DR-E-180-87. Bonnie and
Alison to review.
Complete
B
Completed and appears to have been
successful.
HU-RFC-E-032-87 ATEX System Commands
11-10-1987
Complete
STAT
A
HU-RFC-E-033-87 Entire Source Line
11-17-1987
E.L. Brewer
This task is complete and requires
documentation update. Copy to John W.
Closed
B Requested For Daily
12-17-1987
John W., LEC
Withdrawn by originator. Discrepant
Report
condition on VAX.
HU-RFC-E-034-87 Print Discard For AG
12-03-1987
T/I
STAT
B And PROD
12-24-1987
Ed/Kathy
Ed is working program on VAX side.
STAT
I is following.
SIAI
HU-RFC-E-035-87 Directories On Book
12-04-1987
E/DRD
Open
STAT
C Codes Are Often
01-07-1988
B. Yeakle/HED
Opened as result of non-discrepant
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
FBIS
RFC Status Report
RFC NO TITLE
PRIORITY
DATE LOGO
DUE DATE
ORIGINATOR
ACTIONEE
STATUS
HU-RFC-E-036-87
Multi Take Procedure
12-04-1987
C/WSS
Open
C
Can Not Be Handled
By The Menu.
01-07-1988
B. Pratt/ADD
Opened as result of non-discrepant
closure of HU-DR-E-011-87.12/17- Pratt
HU-RFC-E-037-87
BENT PIPE Message
12-17-1987
Deferred
STAT
B
Reconfiguration
12-17-1987
J. Racz/GE
Forward to CCB for approval.
HU-RFC-E-038-87
ATEX Terminal
12-17-1987
J. Staples/GE
Approval
8
Relocation For
Production Group
12-30-1987
J. Staples/GE//LEC
Do assessment.
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
ACTION ITEM REPORT -BY ITEM NUMBER- ATTACHMENT H
12-18-87
ADD LEC ASSIGN ASSIGN
Al NO Al NO MEETING DATE ACTION ITEM
------ -------- --------- ---------------------------
DUE MTG DUE DATE
ORG TO STATUS DATE
TERBO13 FBIS-ERB 12-10-87 Control of Documentation SES J. Defer
FBIS- 12-17-1987 in order to close Shipley/SE In process. Will discuss
ERB completed DR/RFCs in SES first of the year.
system. 1)Who is to
provide Doc. to SES?
2)Who is going to
incorporate these chgs.
into doc. and deliver to
SES for control. 3)After
redlines delivered who
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6
Build Request
Titles Wire Service Alerts
RR-IV o.: HU-BR -E-00187
Date Logged; 16 DEC 87
Originator: V. Pratt
Type gChane
ATTACHMENT I
Contract NO.: N/A
Priority: B
Telephone Number: --,,Bn
?uosYstem Affected: ATEX/pare Service
~mponent ffected: Hatcher $1.SRC-SRC-BCH
Procedure Documentation
System Impact: Proposed solution to "missin n
Affected Documents: none t alert message
Title:
Number:
Description of Chan
HU-DR -E-197-87. ge. This BR closes BU-DR
1) Chan a -E-096-87, 8U-DR -E-118-87, and
2
g e to send alert to bothISLOT 1
1) Change batcher_to send alert to ho and SLOT 2 ~ vice
3) Change SOP for Commo Operators Is sent to WSS SLOT 1 only.
Aerators to send all messages to~SLOvice T 2, before.
Installation Procedures: ATEX S vice SLOT 1.
Ystem Administrator supervise change to batcher.
Verification/Test Procedures:
Scheduled Installation Date:
Result:
Backout Procedures:
RB Chairman Approval
Board Comments
C/AFSB:
Acceptanecec
Date:
Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6