OPERATIONAL ERB MEETING REPORT

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP88-00218R000300280008-6
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
34
Document Creation Date: 
December 22, 2016
Document Release Date: 
June 4, 2012
Sequence Number: 
8
Case Number: 
Publication Date: 
December 17, 1987
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP88-00218R000300280008-6.pdf1.23 MB
Body: 
(' Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 PROGRAM 520 ROUTING SLIP S. CARPENTER INITIAL ACTION REVIEW B. EMRICH 2 D. ERICKSON --' C. GRAHAM M. JOHNSON N O . J NES ~r~ n~ N. PULLEY J. RACZ . J. SHIPLEY W. STANBR IDGE -~~- J. STAPLES J. THOMAS COMMENTS: L Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 .MEMORANDUM FOR: Distribution Chief, Headquarters Engineering Division, ESG Jennifer Thomas System Engineering Support, GE Operational ERB Meeting Report 1. The Operational Engineering Review Board was held on 17 December: 1987 at 1330. See Attachment A for a list of attendees. See Attachment B for the Agenda. 2. Two new DR's were discussed. See Attachment"C-for a description 3. The O/BRB reviewed ail the In Progress DRs. See Attachment D for of these DRs. Two walk-on DRs were also discussed and are listed in a description of those DRs. The status updates from the ERB are also `incorporated. 4. Those MRs scheduled for update were reviewed. See Attachment E Attachment C. for the current status of all MRs. 5. Two new RFCs were discussed. See Attachment F for a description `discussed. See Attachment G for the current status of all RFCs. - Attachment F. Those RFCs in process and scheduled for update were of these RFCs. Two walk-on RFCs were also discussed and`are listed in .. 6. One new Action Item was reviewed. See Attachment H for the list of Action Items remaining open. 7. The next Operational ERB is scheduled for Wednesday, 23 December Declassified in Part - Sanitized Copy Approved for Release 2012/06/04 : SES-239-87 17 December 1987 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 u ti SUBJECT: Operational ERB Meeting Report 8. Build Requests Page 2 a. B. Pratt presented a Build Request, HU-BR -E-001-87, to the O/ERB. This Build Request was presented to the 0/En for two reasons. First, B. Pratt wanted to present a proposed solution to complete DRs HU-DR -E-096-87, HU-DR -E-118-87, and HU-DR -E-197-87. Secondly, B. Pratt wanted to propose that the 0/ERB begin using Build Requests as a standardized means of documenting and approving the installation of corrections to DRs and changes resulting from RFCs on the AFS System. b. The 0/ERB approved the proposed solution to complete DRs HU-DR -E-096-87, HU-DR -E-118-87, and HU-DR -E-197-87. B. Hunter requested that the proposed change to the Commo Operator SOP be reviewed once more with the C/WSS to verify whether Commo Operator messages should be sent to Slot 1 or Slot 2. c. The 0/ERB discussed the proposal to begin using Build Requests as a standardized means of documenting and approving the installation of corrections to DRs and changes resulting from RFCs on the AFS System. The purpose of the BR is to completely document the corrections or changes to the AFS System, identify the DR(s) or RFC(s) to be closed by the BR, provide red-lined documentation (if any), provide change installation, verification, test, and backout procedures, provide the results of pre-installation testing, designate a change installation date approved by C/AFSB, and provide for ERB Chairman approval of the BR package. d. J. Visor noted that the AFS Forecast of Activities form is currently being used incorrectly as a kind of Build Request, and recommended that the use of BRs be implemented and that the AFS Forecast of Activities form be used only as a tool for activity scheduling. B. Hunter stated that he felt the ERB had not been providing adequate feedback to the users on the correction of DRs and the completion of RFCs. The identification of DRs and RFCs in the BR and the identification of the BR in the DRs and RFCs will improve feedback to the users by identifying the changes before they are made, identifying when they will be made, and identifying which DRs they are to correct. e. The 0/ERB approved the implementation of Build Requests to document the correction of DRs and the completion of RFCs. The final format of the BR form will be developed by the 0/ERB as experience dictates. The BR processing procedures also need to be finalized by the 0/ERB, but initially BR processing procedures will be as follows: Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 SUBJECT: Operational ERB Meeting Report Page 3 1) The O/ERB requires that the results of all approved DRs or RFCs to the AFS System software, database, hardware, facility, procedures or documentation baselines must be documented on a Build Request. 2) BRs will be submitted to the O/ERB for each resolved DR or RFC prior to implementation. A BR may contain the documentation of more than one resolved DR or RFC. 3) The O/ERB will review BRs, verify priorities and completeness, and authorize implementation of the results of all approved DRs or RFCs to the AFS System. Jennifer Thomas Attachments Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 SUBJECT: Operational ERB Meeting Report DS&T/FBIS/ESG/ADD/SES:NPulley:cg/733-5936 (17DEC87) Distribution: Original - C/ESG 1 - C/HED 1 - C/FED 1 - C/PROD 1 - C/ADD ADD Staff 1 - C/AFSB 1 - C/OPS 1 - C/DRD/OPS 1 - C/WSS/DRD/OPS 1 - C/ME/DRD/OPS 1 - SAM/PROD 1 - SA/OPS 1 - W. Pratt, COTR 1 - LEC, Plainfield 1 - LEC, Reston 1 - GE/SES Staff 1 - GE/SES Chrono Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 O-ERB Attendees B. Hunter M. Tanigawa J. Visor A. Sellers E. Brewer J. Shipley B. Stanbridge C. Bestor B. Yeakle J. Cherry B. Pratt J. Thomas D. Bernholz STAT Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 ti Discrepancy Report Agenda New Discrepancy Reports ATTACHMENT B 15 DECEMBER 1987 DR NO Status Priority Originator CO-DR -E-084-87 New B HU-DR -E-210-87 New B Discrepancy Report Agenda G. Guntandorf L. Rose 15 December 1987 Discrepancy Reports in Progress DR NO Status Priority Actionee CO-DR -E-036-87 T/I B E. Brewer/LEC CO-DR -E-037-87 Open B J. Fink/LEC HU-DR -E-062-87 Open B J. McGowan/HED HU-DR -E-096-87 Open B D. Higgins/LEC HU-DR -E-107-87 Review B D. Higgins/LEC HU-DR -E-113-87 T/I B B. Yeakle/HED HU-DR -E-123-87 T/I B D. Higgins/LEC HU-DE -E-130-87 T/I B D. Higgins/LEC HU-DR -E-134-87 Open B M. Tanigawa/ADD//B.H HU-DR -E-143-87 T/I B. D. Higgins/LEC HU-DR -E-148-87 T/I B LEC, ATEX HU-DR -E-155-87 T/I B D. Higgins/LEC HU-DR -E-161-87 T/I C B. Yeakle/HED HU-DR -E-165-87 T/I B E. Brewer/LEC HU-DR.-E-167-87 Deferred B D. Higgins/LEC HU-DR -E-169-87 Deferred B D. Higgins/LEC HU-DR -E-197-87 Review A LEC, D. Higgins CO-DR -E-080-87 T/I B E. Brewer/LEC CO-DR -E-081-87 T/I B E. Brewer/LEC HU-DR -E-203-87 T/I B D. Higgins HU-DR -E-204-87 T/I B E. Brewer CO-DR -E-082-87 T/I B Modification Request Agenda 15 DECEMBER 1987 Modification Requests in Progress MR NO Status Priority Actionee HU-MR -E-014-87 Open C LEC w/other analysis HU-MR -E-015-87 Approval B B. Yeakle / ATEX HU-MR -E-016-87 T/I C LEC/Xyvision HU-MR -E-024-87 Approval B. K. Woodard HU-MR -E-028-87 nnan r n a..,...._ iT n.. STAT Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Request for Change Agenda New Requests for Changes RFC NO Status Priority Originator HU-RFC-E-035-87 New B HU-RFC-E-036-87 New C Request for Change Agenda 15 December 1987 ~ME/DRD 16 December 1987 Request for Change in Progress HU-RFC-E-014-87 HU-RFC-E-015-87 HU-RFC-E-017-87 HU-RFC-E-019-87 Status Deferred Open Review Deferred Priority C C B C Actionee LEC Xyvision, LEC LEC LEC HU-RFC-E-020-87 HU-RFC-E-023-87 HU-RFC-E-024-87 HU-RFC-E-026-87 CO-RFC-E-005-87 Pending T/I Installt'n Pending T/I B C B A B LEC B. S Best LEC/ LEC, tanbrid or,Sy,D John Sc John K. ge. ick,LEC ott & Ed B. HU-RFC-E-028-87 CO-RFC-E-006-87 T/I D l B LEC HU-RFC-E-027-87 eve opmnt T/I B B C/H HU-RFC-E-029-87 Deferred B VKathy HU-RFC-E-030-87 HU-RFC-E-033-87 Approval Deferred B B B. Y John eakle W., LE C ADD LEC AI NO AI NO ORG. -------- -------- TERBO13 ACTIONEE -------------------- J. Shipley/SES STAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS Discrepancy Report Problem Identification: Install New Version Of TELEX Driver DR Number: CO-DR -E-084-87 Submit Date: Problem Date: 12-09-1987 Problem Time: ATTACHMENT C 12-12-1987 Category: I 1400ZGMT Priority: B System: HUCF Hardware Configuration: Software Configuration: Database: Procedure: Affected Documents: Title: Scenario: Prior Operations: Subsystem: VAX Commo Segment Model #: Serial #: Application: PTELXPRVR.PAS Version: Location: Reston, VA. Originator: G. Guntendorf Phone: 9 121 Approval for Submittal: Wire Service Date: 12--1212--1987 87 Problem Description: Embedded TELEX messages did not get passed. and to from RCA. gged into system when received Analysis: The TELEX driver did not recognize the EOM and SOM character set for the 2nd and subsequent message on a receive of mail from TELEX. Corrective Action: Added code to trap for the different EOM/SOM character sets from RCA so messages are passed correctly. References/Documentation: Impact: Possibly loss of message in TELEX. Related Problems: Action Completed By: E. Brewer/LEC Status: T/I Date Due: 12-30-1987 Status Msg: Check for another variation. Approval: Date Closed: Actionee: E. Brewer/LEC Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS Discrepancy Report Problem Identification: VAX Insufficient Virtual Memory Error DR Number: CO-DR -E-085-87 Submit Date: 12-09-1987 Category: Problem Date: 11-03-1987 Problem Time: 0322ZGMT Priority: B System: VAX Subsystem: Hardware Configuration: 8600 Model #: Serial #: Software Configuration: VAV/(1UC I. c Database: Procedure: Affected Documents: Title: -YFL4c4L10n: Version: Scenario: Location: Prior Operations: Originator: M. Jackson Phone: (703)733-5977 Approval for Submittal: Date: Problem Description: Unexpected symbiont process termination. Insufficient virtual memory error. Switched over from AFS1 to AFS2 and system ran fine. Analysis: DEC SPR 15.30.17 pertains. But symbionts do not correctly relaese virtual memory as they run. This phenomenon is directly related to the number of print requests the machine processes ad hoc. Corrective Action: This failure will usually only be observed after 8 to 10 days of continuous operation and was masked by weekly switchovers. STOPFBIS/STARTFBIS should clear the problem when it occurs. References/Documentation: VAX/VMS systems dispatch July 86,VAX/VMS dispatch cumulative index for Impact: Related Problems: Action Completed By: Approval: Status: Closed Date Due: 12-17-1987 Date Closed: 12-17-1987 Status Msg: People must monitor symbiont. Documentation Actionee: STAT Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS Discrepancy Report Problem Identification: Editable Files Included Previously Published Files DR Number: HU-DR -E-210-87 Submit Date: Problem Date: 12-10-1987 Problem Time: System: HUCS Hardware Configuration: Software Configuration: Database: Procedure: Affected Documents: Title: Scenario: Prior Operations: Category: I Priority: B Subsystem: ATEX Model #: Serial #: Application: Version: Location: Originator: L. Rose Phone: (703)733-6438 Approval for Submittal: D. Bernholz Date: Problem Description: Editable file directory of NEA report included filenames of files previously published and no longer in NEAD-PUB queue. 12-17-87: Recurrence of extraneous material in editable file dir. tac reprt had "tactest" in its file--not a legitimate file Analysis: Problem recurred on Dec. 14 at one work station only. Corrective Action: K. 'Woodard deleted directory, pubs sent files back through spooler, and report was successfully built. 12-17-87: Bonnie, Kathy informed. They deleted file & pubs started over. References/Documentation: Impact: If this can happen, pubs has to be constantly on alert to number of files in a report. 12-17-87: This third recurrence in two working days. Holds up report production. 12-17-87 No impact operationally. Related Problems: Action Completed By: Status: T/I note n..,.. ,n Status Msg: ---_______ Approval: Date Closed: Actionee: B. Yeakle/HED Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS Discrepancy Report Problem Identification: File Messages Sent To Wrong Queue DR Number: HU-DR -E-211-87 Submit Date: Problem Date: 12-04-1987 Problem Time: System: HUCS Hardware Configuration: Software Configuration: Database: Procedure: .Affected Documents: Title: Scenario: Prior Operations: 12-04-1987 Category: I 0318 Priority: B Subsystem: ATEX Model #: Serial #: Application: Version: Originator: Dines Phone: (703)733-6483 Approval for Submittal: D. Bernholz/PROD Date: 12-09-1987 Problem Description: All of these file messages were in the EE3-ELA queues in the a.m.on DEC 7. None of the items were in the queue, nor should they have been, as they belong in the NEA queue. The items appeared in NE11 in p.m. on 4 Dec . This in the proper distribution CONT Analysis: CONT destination queue. The items were sent on 2 Dec. Corrective Action: References/Documentation: Impact: Related Problems: Action Completed Byt Approvall Status: New D t D S a e ue: 12-17-1987 Date Closed: tatus Msg: ---------- Actionee: D. Higgins/LEC Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 DISCREPANCY REPORT STATUS .CTACIL LEL;T D 15 DECEMBER 1987 15 DR # SUBMISSION DATE PROBLEM IDENTIFICATI ON CO-DR -E-036 09-02-1987 VAX/ATEX Link Error ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED E. Brewer/LEC Approve B 12-30-1987 DESCRIPTION Read errors on ATEX to VAX transitions for both A and B links randomly. ERB COMMENTS Work through scheduling process. Do when have ATEX backup. Still have read errors. Performed 1st step of DEC recommendations. Testing 12-05-87 p.m. This step has minimal impact. DR # SUBMISSION DATE PROBLEM IDENTIFICATION CO-DR -E-037 09-01-1987 Dedicated Line Black Box Does Not Pass "Pinkie Code" Chars. ERB ACTION Waiting for a response from Black Box. ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED J. Fink/LEC Open B 12-30-1987 DESCRIPTION The "Black Box" BAUDOT to ASCII converter does not pass the 'Pinkie-Code' characters. ERB COMMENTS Translation code to accomodate PROM chip to be done by 13 Nov. Black Box still p PROM chip from Black Box still causing problems, mis-translation of hyphen (-) to ?. Need to redue the translation table to accomodate the chip. LEC s/w is to be fixed. To be done by 13 Nov. Still not passing Pinkie Code. DR # SUBMISSION DATE PROBLEM IDENTIFICATION CO-DR -E-080 11-18-1987 TELEX Messages Have Blank Lines Removed ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED E. Brewer/LEC T/I B 12-30-1987 DESCRIPTION , Blank lines are removed from incoming TELEX messages. ERB COMMENTS Still in progress. E. Brewer to remove blank lines. Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 DISCREPANCY REPORT STATUS DR # SUBMISSION DATE PROBLEM IDENTIFICATION CO-DR -E-081 11-18-1987 TELEX One-Up Number Not Incremented ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED E. Brewer/LEC T/I B 12-30-1987 DESCRIPTION The TELEX one-up number is not being incremented. (Still at 1 on startup.) ERB COMMENTS Still in progress. DR # HU DR SUBMISSION DATE PROBLEM IDENTIFICATION - -E-062 08-28-1987 Fiber Link 'C' Would Not Activate. ERB ACTION ACTIONEE J STATUS PRIORITY DATE DUE DATE CLOSED . McGowan/HED Open B 12-30-1987 DESCRIPTION Fiber link "C" would not activate. Xyvision personnel notified LEC. PM 27 August link is still down. ERB COMMENTS Spare modem ordered 10/2. Still waiting. 8/27/87 Appended to add: J. McGowan (AFS-B) is working with the link withOlT while Xyvision software is being examined on the system side. DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-096 09-23-1987 Priority Items Arriving Late And Not Advising Of Immediates ERB ACTION ACTIONEE D i STATUS PRIORITY DATE DUE DATE CLOSED . H ggins/LEC Closed B 12-17-1987 DESCRIPTION WSS slot duty officer notes that priority items (incoming) arriving @2 hrs late and system not advising of incoming immediates. Data Center advises there is a backup of @140 items in the incoming queue and they will arrive slowly. An immediate cont'd ERB COMMENTS Part closed to HU-BR -E-001-87. Other part closed to HU-DR -E-158-87. Recommendation due 11/19/87 from LEC in regards to possible RFC. Related to HU-DR-E-87-066, 118, 197. Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 DISCREPANCY REPORT STATUS DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-107 09-24-1987 Imbalance Between Mirrored Systems ERB ACTION ACTIONEE D Hi STATUS PRIORITY DATE DUE DATE CLOSED . ggins/LEC Open B 12-30-1987 DESCRIPTION 1) After running SYSVER, the number of items needing correction is more numerous than would be expected under normal operations. 2) After running maintenance, certain queues do not accurately mirror their twins. ERB COMMENTS Delores to look at. DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-123 10-02-1987 H4 Function Intermittenly Read By Xyvision ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED D. Higgins/LEC T/I B 12-30-1987 DESCRIPTION The XYVISION code "H4" is being read intermittently by the system. Sometimes the item is centered correctly, sometimes the item is flush left. ERB COMMENTS Delores to investigate. Delores to see if looking under Xyvision. There are two formats. Can we add a third? If so then an RFC must be generated. DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-130 10-02-1987 Missing Reuters Items ERB ACTION Combined HU-E-191, 137. ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED D. Higgins/LEC T/I B 12-30-1987 DESCRIPTION Part of text is missing from Wire REUTER ATEX file. Reuter items chopped off words and pages. Files affected: X75RE04,X756RE04,X755RE04,X741RE04,X739RE04,X738RE04 &-many more. Wire Reuter queue displayed no items between 0657-1155 GMT. WDO (cont.) ERB COMMENTS Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 DISCREPANCY REPORT STATUS PAGE: 4 Waiting for response. Can't recreate the problem. Track for more data. Reuters is un-reliable and the problem maybe from outside the building. DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-134 10-05-1987 Need Rules For Measuring Graphics For Xyvision ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED M. Tanigawa/ADD Open B 12-30-1987 DESCRIPTION Prod needs to provide the IOs and ICs with rules to measure graphics to be included in the Atex pick statement to be used by Xyvision. ERB COMMENTS Order sent to P&PD. Waiting supply from P&PD. DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-143 10-05-1987 Spiked Items Show Up In Another Group ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED D. Higgins/LEC T/I B 12-30-1987 DESCRIPTION Items were spiked from various sections of the East Europe Daily Report (book 2). When the editor in section 4H (Malaysia) built a directory, it contained 33 items spiked from East Europe and 3 out of the 8 items that should have been in the 4H contd ERB COMMENTS Evaluate and investigate with the overall examination. Lightburn review. DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-148 10-08-1987 Wrapping Of Incoming Field Messages ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED E. Brewer/LEC T/I B 12-30-1987 DESCRIPTION Various incoming field messages "wrap" both in hard and soft copy, making it very difficult to read in on traffic. Examples attached. Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 DISCREPANCY REPORT STATUS PAGE: 5 ERB COMMENTS Msg not thru docking, need 69 char./line. Match w/other DRs re:same. Oper know w SOLUTION: This is a problem in marking the text in the tsbles to flag for not word wrapping. The 2nd part of the problem stems from the line differences btwn VAX & ATEX & automatic wrap in ATEX. No good solution is available,but problem is being inv DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-155 10-14-1987 Files Not Going Through The Spooler ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED D. Higgins/LEC Test B 12-30-1987 DESCRIPTION Items fetched from the Daily Report Discard Queue and renamed with letters in the filename create errors when the DOCBUILD function is used. ERB COMMENTS Linda to run test. DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-161 10-15-1987 Xyvision Not Balancing Columns ERB ACTION ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED B. Yeakle/HED T/I C 01-07-1988 DESCRIPTION After merging Daily Report text divisions and composing, Xyvision would not balance columns across the bottom. The divisions did balance before they were merged. Ed Spence, Xyvision made a copy of the data base and has sent it to Xyvision Hqs. for ck. ERB COMMENTS Waiting response from Xyvision, working the problem. Bonnie called Xyvision. They were unable to find any info. on problem. DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-165 10-15-1987 Reference Lines Wrap ERB ACTION ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED E. Brewer/LEC Closed B 12-17-1987 12-17-1987 DESCRIPTION Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 DISCREPANCY REPORT STATUS PAGE: 6 When items come in with more than one reference, they are wrapped together, making it very hard to determine the second and succeeding references. See attached example. ERB COMMENTS Documentation is attached. Recommend for closure. Currently "REF:" is in block form, if multiple references are entered as seperate line items this may correct the problem. AUTODIN, ATEX, and VAX have different screen lengths - may be a system problem. DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-167 10-16-1987 Partial Directory Build On The AUTODIN Retrieval Queue ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED D. Higgins/LEC Open B 12-30-1987 DESCRIPTION Branch Chief attempted to build an operational messages AUTODIN directory retention queue on system 4. The directory ended at 48 items. The last item in the directory was a DAN with the end of file mark immediately after the DAN. ERB COMMENTS User to revauluate problem. May be closed later. Need to check documentation and instruct users. There are two ways to build - the new way on the original key and the old way on a new key. Need to check with Bonnie for verification and documentation. DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-169 10-16-1987 Batch Append Failure ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED D. Higgins/LEC Open B DESCRIPTION Batch append used to be reliable for 6 to 8 items. It is now not reliable for as few as 3 items. Reliable means all the items are appended in the right order with nothing missing in the items. ERB COMMENTS APE issue. DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-197 10-30-1987 Resolve Problem Of Slot Missing Flash Notification Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 DISCREPANCY REPORT STATUS PAGE: 7 DR's HU-066,HU-118 reviewed and combined into this DR. ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED LEC, D. Higgins Closed A 12-17-1987 12-17-1987 DESCRIPTION When ATEX receives an incoming flash(Z) or immediate (0) msg, the batcher broadcasts to SLOT1 that the msg is incoming. If SLOT1 has at the same time, a msg pending or a system generated msg, the broadcast is overwritten and not seen by SLOT1 editor. ERB COMMENTS Closed to HU-BR -E-001-87. FLASH precedence sorted alphanumerically. Changed Z to 1Z so it will be at top of sort. Visual alert failed when terminal was busy w/other process. Visual alert will follow completion of other process. Report on 11/19/87 by LEC for possible RFC. DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-203 11-24-1987 Information In Wrong Queue ERB ACTION ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED D. Higgins T/I B 12-30-1987 DESCRIPTION At 0745 on 24 November editor on terminal 3:12 called up directory of 3R-3. The directory included items from the OF-0 queue. When those items from OF were called in the 3R directory, the "UNAUTHORIZED ACCESS" message was displayed. ERB COMMENTS See if re-create problem. Bonnie to help. DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-204 Observed An Alert On LA120 DECWriter Console But Not On ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED E. Brewer Closed B 12-17-1987 12-17-1987 DESCRIPTION Observed an alert on LA120 \\decwriter console but not on the VAX terminals. The alert was--PDERLNDRV non-existent, check the P List and it was there. ERB COMMENTS Closed as one time occurrance. Possible one time occurrence. Requires further investigation. Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 DISCREPANCY REPORT STATUS 17 December 1987 DR # SUBMISSION DATE PROBLEM IDENTIFICATION HU-DR -E-113 09-24-1987 DRD Table Of Contents Queue Needed ACTIONEE STATUS PRIORITY DATE DUE DATE CLOSED B. Yeakle/HED Complete B 12-10-1987 DESCRIPTION DRD Books have a TOC-DR queue (for book tables of contents). Requirement was for TOC-DR queue to hold 30 days worth of DR TOC's. As of yet these queues have yet to be activated and populated by XYVISION folks. ERB COMMENTS Bonnie to write recommendation. Bonnie to coordinate with B. Hart. Solution's on the system but need Xystrip tape problem solved before the information can be entered into the queue as part of nightly maintenance function. Workaround: Maybe distribute 410 pgs of laser proof per day or read Xystrip tape back to ATEX? Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS MR Status Report ATTACHMENT E .18 December 1987 MR NO PRIORITY CO-MR -E-001-87 TITLE Change Restart DATE LOGO DUE DATE 11-04-1987 ORIGINATOR ACTIONEE E.L. Brewer Closed C Procedure To Prevent 12-03-1987 LEC Ed Brewer Change implemented 29 October 1987, Error On Restart Of 1400. Testing 11/07/87, 0900-1100. CO-MR -E-002-87 Desire Multiple 11-17-1987 S. Breft Closed B Print Of ADMINS 11-19-1987 LEC Completed 14 Nov. 1987 CO-MR -E-003-87 TELEX Messages Have 11-30-1987 G. Gutendorf Complete B NBR Vice Pound Sign Change made. Awaiting documentation. CO-MR -E-004-87 TELEX Message End 11-30-1987 G. Gutendorf Open B 12-24-1987 E. Brewer Change identified, to be made to source CO-MR -E-005-87 Provide Automatic 12-08-1987 E. Brewer/LEC' code. B CO-MR -E-006-87 Print Of 2nd Copy For ADMIN's New Terminal 12-09-1987 E. Brewer/LEC E. Brewer/LEC Complete B Interface For 12-10-1987 E. Brewer/LEC Software changed to retain latest CO-MR -E-007-87 Transmitters TELEX Poll On Sign 12-10-1987 G. Gutendorf/HED version of msg. Problem solved. Complete B On 12-24-1987 E. Brewer/LEC There is no documentation associated CO-MR -E-008-87 Modify PVALOUT For 12-14-1987 Wire Service with this MR. Recommend closure. New B Trend Article 12-17-1987 E. Brewer No documentation changes. Recommend for HU-MR -E-001-87 New JPRS Directory 09-17-1987 O. Bernholz closure. Complete A 09-30-1987 Awaiting documentation. HU-MR -E-002-87 Add "FBIS" As Start 09-18-1987 WSS State/INR Murphy Complete C Of Msg To WSS ALL LEC, E. Brewer Change is in, 4 line "all clear" msg. CLEAR HU-MR -E-005-87 Automatic Spike Of 08-05-1987 Ops Wire Service Closed C Transmitted Items. 12-10-1987 LEC Cannot put in commands to delete files. Rec. Closure 12-10-87 HU-MR -E-006-87 Wire Editors 07-29-1987 Ops Wire Service . Closed C Manually Inserting 12-03-1987 W. Stanbridge Ref: RFC-036. Extra "Quad Lefts". HU-MR -E-007-87 Limit Spiking Rights 08-21-1987 SA/Ops J. Berthiaume Closed HU-MR -E-008-87 Edit Check Mode Does 08-21-1987 SA/Ops J. Berthiaume This MR requires no change to be made. Closed C Not Allow XYCODE 12-10-1987 LEC, J.S.W. ATEX does not do. Procedural workaround Insert. in place. Higgins to call ATEX to conf Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS MR Status Report MR NO TITLE DATE LOGO ORIGINATOR PRIORITY DUE DATE ACTIONEE HU-MR -E-009-87 Missing Coordination 09-18-1987 B Review Staff Queues HU-MR -E-010-87 DRD Additional Laser 09-24-1987 B. Hart/DRD ME B Printer Stanbridge Requirements. HU-MR -E-011-87 ATEX Priority 09-28-1987 A Sequencing 09-24-1987 Complete Corrected logons for correct access. Closed This MR is being submitted as an RFC to the CCB. Complete Modification to the ATEX System. HU-MR -E-012-87 ATEX Message 09-28-1987 Complete A Processing Procedure 09-24-1987 Internal priority lvl change to ATEX s/w. Not to the customers. HU-MR -E-013-87 Addition Of Option 09-29-1987 Complete A Menus To Cache 09-29-1987 W/option menus, reduced system jumping Memory from 1 to 2. HU-MR -E-014-87 DRD Read-In Capab On 09-30-1987 ~~ Open C WSS Directories 01-07-1988 LEC w/other analysis Still in Progress. HU-MR -E-015-87 DR Programmable Keys 10-01-1987 Doug Hayes ATEX B 12-30-1987 B. Yeakle / ATEX HU-MR -E-016-87 Tabular Material 10-05-1987 B. Hart C Header 01-07-1988 LEC/Xyvision HU-MR -E-017-87 Batching Routine 10-05-1987 A. Sellars C Time Stamps 10-22-1987 HU-MR -E-018-87 Dissimilarity 10-20-1987 L. Rose C Between Names Of 01-07-1988 D. Higgins/LEC Queues And Spooler HU-MR -E-019-87 DR Programmable Keys 10-20-1987 J. Berthiaume 8 Error 12-03-1987 LEC/ATEX HU-MR -E-020-87 Quad Left After End 10-21-1987 E. Brewer C Of Text Marker To E. Brewer ATEX HU-MR -E-021-87 MEB Editors Need 10-28-1987 L. Rose B Full Edit Access To 12-10-1987 LEC, APE Analysis DISCRD-DR Queue. HU-MR -E-022-87 Retention Of ATEX 10-30-1987 D. Bernholz B Default Queues 11-05-1987 Approval Approved for implementation. T/I Higgins to discuss with xyvision compositors for recommendation. Complete Completed per A. Sellars. Open Develop consistencies. Input from HU-DR-E-153-87. Pending resources to Closed BIG problem, labor intense work-around. Doug is working. Close this DR to HU-OR- Complete Problem fixed on 10/14/87. Closed Withdrawn 12-10-87. Closed Being monitored to see if 5 day retention period is too long. STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS MR Status Report MR NO TITLE PRIORITY DATE LOGO DUE DATE ORIGINATOR ACTIONEE --------------- -------------------- --------- HU-MR -E-023-87 Relocation Of 11-04-1987 Complete B Terminals 11-05-1987 Completed 11/6/87. STAT HU-MR -E-024-87 Change {h3}, {h4} 11-04-1987 L. Rose Approval 8 Codes To Change Bolding Size 12-30-1987 K. Woodard Approval for implementation for Kathy to coordinate. HU-MR -E-026-87 New Phone Number For 11-09-1987 D. Lehman DC/WSS Complete B WSS Contact 11-12-1987 Kathy W. Completed on 11/6/87 HU-MR -E-027-87 Insert Bolding On 11-19-1987 LEC APE E. Brewer Complete B VAX Vice ATEX 12-10-1987 D. Higgins/LEC Recommend this MR be reassigned to D. Higgins for final action. HU-MR -E-028-87 Remove DOC Function 11-19-1987 LEC APE E. Brewer Open C For Outgoing ATEX To VAX Files 12-30-1987 E., Brewer/LEC VAX side to be worked. Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS Request for Change ATTACHMENT F Title: Directories On Book Codes Are Often Inaccurate RFC No HU RF .: - C-E-035-87 Contract No.: 85X-102-200-000 Date Logged: 12-04-1987 Priority: C Proponent of RFC: Approval for Submittal: Originator: MME/DRD Telephone Number: (703)7336-013 Affected Documents: Title: Need for Change: When a DRD book book, hitting tl he/she sent to t that includes th files sent by tht Editor 5A hits pi my single letter divisions on his/her .1 up specialized directory of just what ueues, actually calls up a directory double letter divisions. For example, and that directory includes Lu call up a directory of what 5A sent to DISCRD what 5AA sent to DISCRD. Description of Change: T/I showed that ATEX is working correctly. This requires research to design new procedures to fulfill customer requirements. Cost/Schedule Impact: Board Comments: Status: Open Due Date: 01-07-1988 Actionee: B. Yeakle/HED Status Msg: Opened as result of non-discrepant closure of HU-DR-E-112-87.Vork when Date Closed: Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS Request for Change Title: Multi Take Procedure Can Not Be Handled By The Menu. RFC No.: HU-RFC-E-036-87 Contract No.: 85X-102-200-000 Need for Change: Multitake procedure cannot be handled by the menu (such information placed in the menu will appear above, and not below, the headline). Editors must manually key take information into the proper place. Editors have to enter this information manually in any event. ATEX procedures are more time consuming and allow for more human error. Date Logged: 12-04-1987 Priority: C Proponent of RFC: Approval for Submittal: Date: Originator: C/WSS Telephone Number: . Affected Documents . Title: Description of Change: To make AFS menu work the same as MIDAS an investigation by ATEX System Administrator would be required. Cost/Schedule Impact: Date Closed: Result: Board Comments: This change can't be done, but JP-RS-wants the change anyway. Need to know difference between MIDAS and AFS. B. Pratt to take to Alison. To tell her that 0-ERB recommends disapproval. Status: Open Due Date: 01-07-1988 Actionee: B. Pratt/ADD Status Msg: Opened as result of non-discrepant closure of HU-DR-E-011-87.12/17- Pratt Date Closed: Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS Request for Change Title: BENT PIPE Message Reconfiguration RFC No.: HU-RFC-E-037-87 Contract No.: 85X-102-200-000 Date Logged: 12-17-1987 Priority: B Proponent of RFC: GE/SES Approval for Submittal: C/ESG Date: 12-01-1987 Originator: Telephone Number: (703) 733-5954 SIAI Affected Documents: Title: FBIS System Specification Number: MFD-900-OO1C HUCS Functional Specification Vol LEC DOC NO 23103124 1HUCS Concept of Operations LEC DOC NO 23103152 Need for Change: See Attached Description of Change: See Attached Cost/Schedule Impact: Date Closed: Result: Board Comments: Status: Deferred Due Date: 12-17-1987 Actionee: J. Racz/GE Status Msg: Forward to CCB for approval. Date Closed: Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS Request for Change Title: ATEX Terminal Relocation For Production Group RFC No.: HU-RFC-E-038-87 Contract No.: 85X-102-200-000 Date Logged: 12-17-1987 Priority: Proponent of RFC: D. Bernholz/PROD Approval for Submittal: B. Hunter/HED Date: 12-17-1987 Originator: J. Staples/GE Telephone Number: (703)733 -5951 Affected Documents: Title: Number: Need for Change: ATEX terminal is needed more in the Production Group's Science Center than in its present location (c/JPRS). Description of Change: 1. Disconnect ATEX terminal in room 1S15B (cable 151) 2. Relocate ATEX terminal in room 1N34. 3. Connect ATEX drop in room.1N34D (cable177) to ATEX system. 4.Install conduit in wall between 1N34 and 1N34D. 5. Run ATEX terminal cable through conduit and connect to ATEX drop in room 1N34D. Cost/Schedule Impact: Date Closed: Result: Board Comments: Status: Approval Due Date: 12-30-1987 Actionee: J. Staples/GE//LEC Status Msg: Do assessment. Date Closed: Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS RFC Status Report ATTACHMENT G 18 December 1987 RFC NO TITLE PRIORITY CO-RFC-E-001-87 Additional VAX DATE LOGO DUE DATE 07-23-1987 ORIGINATOR ACTIONEE G. Gutendorf B Terminal For LEC Computer Center CO-RFC-E-002-87 AFP & REUTER 08-20-1987 SA/OPS J. Berthiaume Closed A Printers For WSS 09-03-1987 S. Kayback/ADD Sy is checking on a printer for Wire and AG. Will be reviewed in 9/4 staff mtg. CO-RFC-E-003-87 09-01-1987 Complete B 11-19-1987 E. Brewer/LEC Completed 13 November. CO-RFC-E-004-87 Use Of BFN For ATEX 09-30-1987 W. Pratt Approval B . File Name. 12-24-1987 LEC, Plainfield OPS supports, RFC will impact other segments throughout sys. Working, User CO-RFC-E-005-87 Reposition Check 10-02-1987 J. Berthiaume T/I B Numbers On ADMIN 12-03-1987 E. Brewer/LEC//J.K. Recommend withdrawl. Change will come CO-RFC-E-006-87 Messages Alternate Wire 10-07-1987 automatically with format change. Open B Capability On VAX 12-30-1987 J. Cherry/HED Joel and Mal to talk. FS-RFC-C-001-87 Update To The Field 10-23-1987 STAT HC-RFC-C-001-87 Bureau Segment Deletion Of The HCS 10-19-1987 M. Tanigawa HC-RFC-C-002-87 Menu Driven Requirement Increase In 10-19-1987 M. Tanigawa HC-RFC-E-001-87 Classified Workstation Count PBX / VAX Test Bed 10-07-1987 Closed B Environment 11-05-1987 E. Brewer, LEC Test plan is with Temporary STAT HU-RFC-C-001-87 Increase In The 10-19-1987 M. Tanigawa test, 10/29/87. Remove after test. Number Of JPRS ATEX Workstations Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS RFC Status Report RFC NO TITLE PRIORITY HU-RFC-C-002-87 FBIS Operational CM DATE LOGO DUE DATE 10-23-1987 ORIGINATOR ACTIONEE W. Stanbridge Plan Appendices HU-RFC-C-003-87 Additional ATEX 10-30-1987 W. Stanbridge Terminals And Laser Printers HU-RFC-C-018-87 Change Which 08-14-1987 SA/Ops J. Berthiaume Pending Messages Are Sent To CCB CCB meeting and presentation. Wire Service Select HU-RFC-E-003-87 AFS Modem Closet 06-26-1987 D. Erickson Complete Relocation 09-17-1987 Action completed, documentation update required. HU-RFC-E-004-87 Additional 06-26-1987 A. Coffin Complete B Shaftstall Input 12-17-1987 ESG Update documentation. Device And Model HU-RFC-E-005-87 Wire Log 07-21-1987 W. Pratt Closed 07-30-1987 SI Withdrawn by the proponent. HU-RFC-E-006-87 Wire Service 07-21-1987 W. Pratt Approval A Numbering 12-24-1987 LEC Requires VAX change. LEC proposes 1 month each for RFC & Documentation. HU-RFC-E-007-87 Wire Editor Log-On 07-21-1987 W. Pratt Closed B 07-30-1987 SI Withdrawn by the proponent. HU-RFC-E-008-87 Wire Log Book Codes 07-21-1987 D. Lehman Complete B 07-30-1987 LEC Any changes to necessary documentation HU-RFC-E-009-87 WSS Header Menu C. Hersh needs verification. Closed HU-RFC-E-010-87 AFP/Reuters Wire 07-23-1987 W. Pratt Supporting Documentation for HU-RFC-E-006-87. DR Rejected. Complete B Service 07-30-1987 Ops VERB approved for implementation. Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 ? L FBIS RFC Status Report RFC NO TITLE DATE LOGO ORIGINATOR HU-RFC-E-011 87 ----------------------------------------- - AFP/Reuters Wire 07-23-1987 W. Pratt B Complete Services 07-30-1987 Ops T/ERB approved for implementation. HU-RFC-E-012-87 Wire Log-On Queue 07-23-1987 C. Hersh Closed OBE, queues are switching HU-RFC-E-013-87 Wire Service Message 07-24-1987 SA/OPS J.Berthiaume . Closed Header Change C. Bestor/DRD The TO ALL" line was removed from HU-RFC-E-014-87 Wire Service 07-24-1987 Sa/Ops J. Berthiaume C outgoing numbered and unnumbered WSS Open Programmed Keys 01-07-1987 D. Higgins/LEC Related to HU-DR-E-012-87. Delores to take to Alison to review HU-RFC-E-015-87 Additional Disk 08-04-1987 W. Pratt C . Open Drives For Atex And 01-07-1988 Xyvision, LEC Xyvision. HU-RFC-E-016-87 Log Ons And Password 08-06-1987 SA/OPS J.Berthiaume B J. W. has contract to get hard drives from Xyvision. Closed Protection For DRD LEC/ATEX Password protection for 0 logons is in delete function. Fold RFC into HU-DR-E HU-RFC-E-017-87 B Daily Read-In By 08-06-1987 SA/Ops J. Berthiaume -1 Closed Managing Editor. 12-17-1987 LEC Withdrawn by originator. HU-RFC-E-019-87 C New Queues And Extra 08-14-1987 J. Berthiaume Deferred Copies For DRD QA. 01-07-1988 LEC Review with Alison. HU-RFC-E-020-87 B Daily Report Reading 08-19-1987 SA/OPS J. Berthiaume Pending Access To Wire 12-30-1987 LEC Review with Alison HU-RFC-E-022-87 A Queues Wire Service End Of 08-20-1987 J. Berthiaume/OPS . Complete HU-RFC-E-023-87 C Message (EOM) 08-21-1987 Sequence Additional Large Key 09-17-1987 SAM/PROD Procedure PWSSGATE changed to add NNNN to all outgoing WSS items. Approval Board 01-07-1988 B. Stanbridge./GE Basic RFC approved. J.S. Williams to look at spares and give U-RFC-E-024-87 Hardcopy Requirement 09-24-1987 STAT H Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS RFC Status Report RF C NO TITLE PRIORITY B For AFP And DATE LOGO DUE DATE 12-30-1987 ORIGINATOR ACTIONEE Bestor.Sy,Dick,LEC STATUS Being installed. Charles to check with Harrold to make sure aware of potential HU-RFC-E-025-87 ATEX Performance 10-01-1987 ~ Closed STAT B Data Gathering 11-05-1987 B. Yeakle/HED Closed to HU-RFC-E-027 HU-RFC-E-026-87 ATEX Retention 10-01-1987 W. Pratt Pending 12-23-1987 LEC/John Scott HU-RFC-E-027-87 WS Design Analysis 10-09-1987 Closed STAT B Experiments 12-17-1987 LEC/ATEX Withdrawn by originator. HU-RFC-E-028-87 PROD Needs 10-08-1987 L. Rose T/I B Additional Centering 12-30-1987 B. Yeakle/HED Coordinate change made with Plainfield Function for impact consideration. HU-RFC-E-029-87 DOCBUILD FOR 10-28-1987 A. Usaty Open B CRS-COMPILED REPORTS 12-30-1987 Bonnie and Alison to review STAT . HU-RFC-E-030-87 ATEX Internal 11-04-1987 B Yeakle K Woodward Open B Changes HU-RFC-E-031-87 $PR1 & $PR2 Batchers 11-03-1987 , J. Cherry Related HU-DR-E-180-87. Bonnie and Alison to review. Complete B Completed and appears to have been successful. HU-RFC-E-032-87 ATEX System Commands 11-10-1987 Complete STAT A HU-RFC-E-033-87 Entire Source Line 11-17-1987 E.L. Brewer This task is complete and requires documentation update. Copy to John W. Closed B Requested For Daily 12-17-1987 John W., LEC Withdrawn by originator. Discrepant Report condition on VAX. HU-RFC-E-034-87 Print Discard For AG 12-03-1987 T/I STAT B And PROD 12-24-1987 Ed/Kathy Ed is working program on VAX side. STAT I is following. SIAI HU-RFC-E-035-87 Directories On Book 12-04-1987 E/DRD Open STAT C Codes Are Often 01-07-1988 B. Yeakle/HED Opened as result of non-discrepant Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 FBIS RFC Status Report RFC NO TITLE PRIORITY DATE LOGO DUE DATE ORIGINATOR ACTIONEE STATUS HU-RFC-E-036-87 Multi Take Procedure 12-04-1987 C/WSS Open C Can Not Be Handled By The Menu. 01-07-1988 B. Pratt/ADD Opened as result of non-discrepant closure of HU-DR-E-011-87.12/17- Pratt HU-RFC-E-037-87 BENT PIPE Message 12-17-1987 Deferred STAT B Reconfiguration 12-17-1987 J. Racz/GE Forward to CCB for approval. HU-RFC-E-038-87 ATEX Terminal 12-17-1987 J. Staples/GE Approval 8 Relocation For Production Group 12-30-1987 J. Staples/GE//LEC Do assessment. Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 ACTION ITEM REPORT -BY ITEM NUMBER- ATTACHMENT H 12-18-87 ADD LEC ASSIGN ASSIGN Al NO Al NO MEETING DATE ACTION ITEM ------ -------- --------- --------------------------- DUE MTG DUE DATE ORG TO STATUS DATE TERBO13 FBIS-ERB 12-10-87 Control of Documentation SES J. Defer FBIS- 12-17-1987 in order to close Shipley/SE In process. Will discuss ERB completed DR/RFCs in SES first of the year. system. 1)Who is to provide Doc. to SES? 2)Who is going to incorporate these chgs. into doc. and deliver to SES for control. 3)After redlines delivered who Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6 Build Request Titles Wire Service Alerts RR-IV o.: HU-BR -E-00187 Date Logged; 16 DEC 87 Originator: V. Pratt Type gChane ATTACHMENT I Contract NO.: N/A Priority: B Telephone Number: --,,Bn ?uosYstem Affected: ATEX/pare Service ~mponent ffected: Hatcher $1.SRC-SRC-BCH Procedure Documentation System Impact: Proposed solution to "missin n Affected Documents: none t alert message Title: Number: Description of Chan HU-DR -E-197-87. ge. This BR closes BU-DR 1) Chan a -E-096-87, 8U-DR -E-118-87, and 2 g e to send alert to bothISLOT 1 1) Change batcher_to send alert to ho and SLOT 2 ~ vice 3) Change SOP for Commo Operators Is sent to WSS SLOT 1 only. Aerators to send all messages to~SLOvice T 2, before. Installation Procedures: ATEX S vice SLOT 1. Ystem Administrator supervise change to batcher. Verification/Test Procedures: Scheduled Installation Date: Result: Backout Procedures: RB Chairman Approval Board Comments C/AFSB: Acceptanecec Date: Declassified in Part - Sanitized Copy Approved for Release 2012/06/04: CIA-RDP88-00218R000300280008-6